210 N.W.2d 859 | Minn. | 1973
This is a judicial ditch repair proceeding initiated by Red Lake County following its repair of that portion of a four-county unitary judicial ditch located within its boundaries. After completion of the repairs at a cost of $4,213.62, Red Lake, pursuant to Minn. St. 106.471, subd. 3,
Judicial Ditch No. 1, as it is identified in the record, was established by order of the district court on February 19, 1913. It was constructed during the following 2 years at a cost of $62,632.25 and consists of 151/2 miles of main ditch with approximately 24 miles of laterals. The ditch, originating in Clearwater where the majority of the drainage system lies, follows a northwesterly course across the eastern corner of Polk into Pennington and across the northeast corner of Red Lake, where it is designed to drain into the Clearwater River.
The record indicates that, following the construction of this drainage system, the Clearwater River was dredged by the U.S.
Nevertheless, it is undisputed that a vast amount of silt, numerous trees, and dense brush growth obstructed that part of the ditch in Red Lake. Obstructions also blocked passage of the water into Clearwater River from Red Lake in at least two locations of the ditch passing through Polk. Proceeding under § 106.471, subd. 2,
After this work was completed and upon refusal of Clearwater to pay its “proportionate share of such costs and expenses,” Red
In our view, the trial court erred in construing § 106.471, subd. 2(b), quoted in the margin, as applicable to the entire judicial ditch. The unambiguous language of § 106.471, subd. 2(a), clearly indicates the legislature’s intent to impose upon the board of each county through which a unitary ditch system passes the
In addition, because court-supervised repairs authorized by § 106.471, subd. 4, are to be undertaken only if the costs of repairs by any county and their eventual assessment against property owners adjoining the ditch will be more than $10,000,
Finally, in our opinion the trial court erred in determining that the language of § 106.471, subd. 3, “limits the power of the court to order reimbursement by the counties affected only as shall be just.” Because of the undisputed fact that Clearwater received no benefits from the repairs made by Red Lake, the court concluded that “ [t] o order the land owners of Clearwater County to reimburse Red Lake County for any sums expended by them would not be just * * *.” As we interpret § 106.471, subd. 3, it is not directed at measuring the extent of benefits one county receives from the repairs made by another county. Rather, in view of the limitations imposed by § 106.471, subd. 2(b), it appears that in the event of a dispute between counties, the legislature intended to vest the district court with supervisory authority to equitably balance the accounts where more than one county was required to expend funds for repairs in any one year to maintain the efficiency of its part of the unitary ditch, and also, for example, if it were found that, although the repairs made by any one county were necessary, the sum expended therefor was excessive. In other words, the court is empowered to reduce the amount of the costs and apportion reimbursement according to its findings of not only what repairs
Although Clearwater received no benefit from the repairs, nevertheless its remedy lies not in refusing to abide by the legislative command to reimburse Red Lake but either in petitioning to abandon that portion of the ditch located in Clearwater
Reversed.
Minn. St. 106.471, subd. 3, provides in part: “In the case of any ditch situated in two or more counties and at the end of each year or other convenient period following its completion, the auditor of any county may present a statement, based on the original apportionment of cost made by the court following the establishment of the ditch, to each county affected showing the nature of the repairs made to the ditch and the costs and expenses thereof, and when allowed by the board, such statement shall be paid to the submitting county, and in the event of the failure of any county to pay such statement, the board of any county affected may petition the court having jurisdiction thereof. Such petition shall show the nature of the repairs made to the ditch in the county during the period and the necessity thereof, and the costs and expenses thereof, and shall pray the order of the court apportioning such costs and expenses among the counties affected. Upon the filing of the petition the court shall, by order, fix a time and place for hearing thereon and shall cause the clerk to give notice of the hearing to each county affected, by publication and by mailed notice to its auditor. At or prior to the time of hearing, the auditor of each county affected, except petitioner, shall file with the court a statement showing all repairs made to the ditch in his county, not previously reimbursed hereunder, together with the nature thereof, the necessity thereof, and the costs and expenses thereof. At such hearing the court shall have jurisdiction of the respective counties and shall hear all interested parties. If it ap
In pertinent part, § 106.471, subd. 2, provides: “(a) After the construction of a state, county or judicial drainage system has been completed, the county board shall maintain the same or such part thereof as lies within the county and provide the repairs required to render it efficient to answer its purpose. The board shall cause such drainage system to be annually inspected, either by a committee thereof, or a ditch inspector appointed by the board, and, if the committee or inspector shall report in writing to the board that repairs are necessary on any ditch system and such report is approved by the board, it shall cause such repairs to be made within the limits hereinafter set forth.
“ (b) If the board finds that the estimated cost of repairs and maintenance of one ditch system for one year will be less than $10,000, it may have such work done by hired labor and equipment without advertising for bids or entering into a contract therefor. In one calendar year the board shall not levy an assessment for repairs or maintenance on one ditch system in a sum greater than 20 percent of the original cost of construction thereof in that county, or the sum of $10,000 if the said 20 percent is less than $10,000, except as provided in subdivision 4.” (Italics supplied.)
The material portion of § 106.471, subd. 4, provides: “(a) Upon the filing of a petition by any party or corporation, municipal or otherwise, interested in or affected by a drainage system, with the auditor in the case of a drainage system lying wholly within the county, or with the clerk of the district court having jurisdiction over said ditch in the case of a drainage system affecting two or more counties, therein setting forth that the drainage system is out of repair, it shall be the duty of the auditor in the case of a drainage system lying wholly within the county to present the same to the county board at its next meeting, and of the clerk in the case of a drainage system affecting two or more counties, to present the petition to the judge of the court within ten days from the filing thereof. Thereupon, if it appears to the board or court that such ditch is out of repair, the board or court shall appoint an engineer to examine the ditch and make report of the necessary repairs, with the estimated cost thereof, and all details, plans and, specifications required to supply the necessary details to let a contract therefOT. * * *
“(b) Upon the filing of the engineer’s report, notice of hearing thereon shall be given as required by section 106.101. * * *
if: sjc í]c sj:
“(d) In all proceedings before the court, the judge shall, by order, apportion the costs and expenses between the several counties in the
§106.471, subd. 2(a).
§ 106.471, subd. 2(b).
§ 106.471, subd. 3.
§ 106.471, subd. 3.
See, §106.471, subd. 2(b).
§ 106.661.
§ 106.015.