873 P.2d 452 | Or. Ct. App. | 1994
Petitioners seek review of and Washington County cross-petitions from LUBA’s decisions remanding the county’s enactment of one ordinance, but affirming two others, that amended the county’s comprehensive plan provisions relating to transportation and roads. We affirm in part and reverse in part.
The principal issues that the parties dispute before us arise out of LUBA’s conclusions that the provisions of the ordinances establishing “road alignment corridors” and authorizing three rural road projects conflict with certain LCDC rules and have not been shown to comply with statewide planning goals 3, 4, 11 or 14.
Before the challenged ordinances were enacted, the county’s plan required that all but “insignificant” road alignment decisions had to be made through plan amendments, which must comply with and are reviewable for compliance with the statewide goals. The ordinances would eliminate that requirement for alignments or realignments within wide corridors at specified proximities to existing or proposed roadway centerlines. Petitioners contended to LUBA that that change eliminated the assurance that alignment decisions would comply with the goals, and was therefore impermissible. LUBA agreed, and rejected the county’s argument that its Community Development Code (CDC) and other local provisions provided adequate alternative safeguards that obviated the need for direct application of the goals. LUBA made it clear that it was not foreclosing all possibility that the county could substitute CDC standards for the goals as alignment approval criteria. It held, however, that the county had not sufficiently explained in its present findings “why application of those CDC standards is adequate to substitute for direct application of the goals,” or why the local standards “are sufficient to assure alignments selected under the Transportation Plan, as amended by ordinance 419, will comply with the goals.”
LUBA next concluded that the alignment provisions are also in conflict with the locational specificity requirement of LCDC’s Public Facilities Planning Rule. OAR 660-11-000 et seq. LUBA further concluded that, because the alignment
“[T]he county’s resolution on remand of the alignment corridor issue * * * will also resolve the only issue petitioners raise [in connection with the three roads]. * * * Therefore, this suhassignment of error provides no additional basis for remand.”
Because one of the assignments in the petition is affected by our disposition of the cross-petition, we address the cross-petition first. The county argues in the first assignment of the cross-petition that the goals should not be applicable to road alignment decisions, unless they have “system impacts.” According to the county, its own acknowledged legislation provides the planning framework, and particular “site specific” decisions can be made by reference to that legislation, rather than requiring plan amendments and application of the goals to particular alignment decisions. The county analogizes alignment decisions to decisions on shopping center applications. It posits that local comprehensive plans and land use regulations, which have already been acknowledged as complying -with the goals, provide the applicable criteria for allowing or disallowing such centers, and there is no need or requirement that the goals should be applied to every shopping center proposal. The county concludes that the same “plan-zone (regulate)-build model” should apply here, and that specific alignments should fall at the “zone” or “build” rather than the “plan” location on the continuum.
Petitioners answer:
“The County analogizes to the construction of subdivisions and shopping centers to argue that goal compliance need not be demonstrated for decisions relating to the specific location of such structures on given parcels. In making its analogy, however, the County has left out the fact that when the parcels were originally zoned for subdivisions or shopping centers, an analysis was completed demonstrating compliance with the Statewide Planning Goals for the entire parcel, regardless of the footprints of the future buildings.*317 Here, the County is trying to gain the benefit of having to avoid compliance with the goals at the ‘zone/regulate’ phase without demonstrating compliance with the goals at the ‘plan’ phase.
“LUBA did not say that the County could not adopt onémile and 1/3-mile corridors for its roads and highways. Rather, it gave the County a choice. If the County wants to adopt such corridors, and thereby eliminate the need to show compliance with the goals at the time of alignment and construction, it must demonstrate compliance with the goals at the time the corridors are incorporated into the comprehensive plan (i.e., at the time the County adopted [the ordinance challenged here] * * *).” (Emphasis petitioners’.)
Petitioners are correct. The county’s argument loses sight, among other things, of the fact that before the amendment by this ordinance, its acknowledged legislation required plan amendments and goal compliance for specific road alignment decisions. The ordinance eliminates the requirement that those decisions must comply with the goals directly, and the county has not provided an adequate showing that the planning mechanism that the ordinance establishes complies with the goals itself or lends any assurance that later specific alignment decisions will do so.
In its second assignment, the county challenges LUBA’s conclusion that the alignment corridor provisions violate the Public Facilities Planning Rule. We agree with LUBA’s analysis of this issue. The cross-petition does not demonstrate error, and we turn to the petition.
Petitioners first contend that LUBA erred by not remanding the county’s provisions pertaining to the three rural road projects. As we have explained above, LUBA held that those provisions required further consideration by the county, but declined to remand them independently of the alignment corridor provisions that present an overlapping issue for the county to resolve on remand. It is unclear to us
One of the challenged ordinances amends the county’s Goal 5 plan provisions in a number of respects, including the addition of the emphasized language to two of the county’s community plans:
“Design Element No. 2 for Southwest of Sherwood Subarea of the Sherwood Community Plan shall be amended as follows:
“2. Cedar Creek, its tributaries and their immediately adjacent riparian zone, as defined in the Community Development Code, shall be retained in their natural condition, including topography and vegetation consistent with the provisions of the Community Development Code. This land shall be dedicated as public open space for pedestrian access and recreational purposes whenever feasible. * * *
“Design Element No. 6 for Summit and Slopes Sub-area of the Bull Mountain Community Plan shall be amended as follows:
“6. Streams, seasonal waterways and immediately adjacent riparian zones, as defined in the Community Development Code, shall be preserved in their natural condition including topography and vegetation, consistent with the provisions of the Community Development Code. Where roads are required, bridges shall be preferred means of crossing streams and waterways rather than infill and piping or channelization of waterflow.”
Petitioners assign error to LUBA’s rejection of their argument that those amendments violate Goal 5. According to petitioners, the effect of the amendments is to diminish the protection that the Goal 5 resources previously enjoyed by
Although we agree with LUBA that petitioners have not demonstrated a basis for reversing the amendments, we reach that conclusion on narrower grounds. The amendments do not show an inconsistency with Goal 5 on their face. Whether future specific development proposals to which the amended provisions are applied will be compatible with Goal 5 is another question, which we cannot now reach. See ORS 197.829(4).
On petition, reversed and remanded for reconsideration of subassignment of error 2c; otherwise affirmed; affirmed on cross-petition.
Because the briefs reflect possible confusion on this point, we emphasize that the decisive issue in this assignment is not whether the goals or acknowledged local plan and regulatory provisions are to be applied to specific decisions. The question is whether an ordinance that amends a comprehensive plan complies with the goals. ORS 197.835(4); ORS 197.625.