170 F. 151 | 2d Cir. | 1909
The plaintiff testified that he had been ín the habit of working in and about the boiler room where.the explosion occurred, and that about two weeks before the accident he had assisted in making certain repairs and in putting flanges on one of the lengths of steam pipe. That at the time he noticed that there was a crack in one of the flanges extending from the outer rim down to the pipe, and that the pipe was rusty and the thread worn on both ends. That steam being then turned on through this length of pipe, it leaked a little from the flange and more from the pipe, whereupon he called attention to that fact, and they calked the leak by putting gasket between the flanges, winding the pipe with brass wire, and bracing it up with a wooden brace. That on December 3d while engaged in oiling a fan outside of the boiler room, one Johnson, a machinist who was at work inside, called him to come in and help fix, pipe on one of the boilers; he did so, and while at work there the blow-out or explosion occurred, he fell down, and a section of pipe was thrown against his legs, inflicting severe injuries. That he looked up and saw that the pipe had blown out from the flange, and that the flange was cracked as it was when he saw it two weeks before. A competent expert whom he called testified that a cracked flange was an element of weakness, because it would not grip the thread as a sound one-would, and that under a pressure of 75 pounds — which was not-unusual in this plant — it might be expected that at any time there would come a blow-out with such force as to scatter parts of the apparatus, in a manner dangerous to any one near by.
Several witnesses, who testified to the occurrences of November 19th, December 3d, and December 1st, contradicted plaintiff’s narrative, and there was a sharp conflict of evidence on several essential points. But the court would not have been warranted in taking the-case from the jury merely because defendant’s narrative of what took place did not accord with plaintiff’s, and upon this appeal, with a verdict in his favor, we must assume that the jury reached the conclusion that his narrative was the correct one. Believing it to be correct, they would be justified in finding defendant negligent in failingfor two weeks to substitute a sound flange for a cracked one. Defendant’s motion for a direction of verdict in its favor cannot be sustained on any theory that there was not enough evidence of its negligence to send the case to the jury.
Direction of a verdict was further- asked for on the ground that there was no evidence that Johnson (the machinist) had authority to-give any orders to the plaintiff, or to order him to work in assisting him (Johnson) in the boiler house on the Sunday when the plaintiff was hurt. We do not find error in the refusal to direct a verdict on that ground, because there was evidence tending to show that the.
The complaint charged that one of the “pipes” connected with furnaces and boilers and filled with hot steam under high pressure was “insecure, defective,” etc. Upon objection being made, when plaintiff offered evidence about the flange, the court allowed the complaint to be amended by adding the words “including the flanges.” The amendment was not necessary; the complaint used the word “pipe” as generally descriptive of a conduit for steam, and the word fairly included the flanges which connected sections of pipe. If defendant wished more specific information it could have asked, in advance of the trial, for a bill of particulars, which it failed tc do.
Defendant contends that plaintiff was allowed to recover on a cause of action not pleaded, to wit, the failure to comply with a promise to repair a dangerous defect. Plaintiff testified that, when he detected the cracked flange on November 19th, the superintendent was sent for, came, and said: “Fix it as best you can; a new pipe will come very soon.” The plaintiff’s own testimony, however, showed very plainly that this statement (assuming that it was made) had no effect on his mind nor induced him to assume, any risk, because he — an unintelligent man without a machinist’s experience — associated a cracked flange merely with a waste of steam through the leak, with no idea that the conditions which permitted such a leak were in any way dangerous.
Defendant assigns as error many statements in the charge and in refusals to charge, all covered by exceptions. It appears from the record that all these exceptions were reserved after the jury had withdrawn in custody of the bailiff. It is certainly surprising that in view of the opinions of this court in Park Brothers v. Bushnell, 60 Fed. 583, 9 C. C. A. 140, and Commercial Travelers’ Accident Co. v. Fulton, 79 Fed. 423, 24 C. C. A. 654, such a practice should still be followed in this circuit. In the case at bar defendant itself suggested it. As we pointed out in the case last above cited, if this course had been followed by express direction of the trial judge, defendant could have excepted to a ruling which deprived him of the opportunity to take his exceptions at the proper time and thus reserved his rights, but he did not do so, and these belated exceptions will not be considered.
By proper objection and exception defendant reserved the point, which he now presents, that the cross-examination of defendant’s witnesses was carried to such an extent and so conducted as to constitute reversible error. A similar point was argued before this court in N. Y. Transportation Co. v. Garside, 157 Fed. 521, 85 C. C. A. 285, where it was said:
■‘It must bo admitted tliat a continual interposition by the trial judge in the ■examination of witnesses may prejudice the jury to the extent claimed; still the tidal judge lias a right, and indeed it is his duty, to see that the facts of the ease aro brought intelligibly to the attention of the jury, and to what extent he will intervene for this end is a matter of discretion.”
The judgment is affirmed.