Benzing v. . Steinway and Sons

101 N.Y. 547 | NY | 1886

The evidence of the circumstances surrounding the accident, and the prior use of the platform occasioning the same, is quite meagre and unsatisfactory; but standing unexplained was quite sufficient to carry the question of plaintiff's contributory negligence to the jury. He was unexpectedly called from his work in another part of the factory, to assist in putting up girders to support a roof in course of erection over the boiler-room. This duty was not in the line of his general employment, and his evidence shows that he had no previous knowledge of the status of the work, or of the appliances used *551 in its prosecution. A platform, consisting of five pine boards painted red, and being one inch thick, fastened together by two hard-wood cleets attached to the boards with screws, and forming a flooring, about four feet six inches wide (the length is not shown), was placed in such a position as to be supported by the wall on one side, and an iron beam three feet therefrom on the other, and extending over a vault about eleven feet deep. It was raining on the day of the accident, and when the plaintiff appeared in the yard, about on a level with the platform, he was ordered by the foreman to get upon it for the purpose of aiding other servants of the defendant, who were then present and ready to proceed in the work of placing the girders in position. The plaintiff asked the foreman if it was safe, and was informed, that it was.

It is quite evident that the plaintiff, had no opportunity to inspect the platform, for the purpose of discovering defects in its material or structure before going upon it, and even if he had made such examination, it is quite doubtful whether he could have discovered them, on account of the painted surface, and the difficulty of inspecting its lower side as it was then situated. He advanced upon it to the place where his services were needed, when the board broke and precipitated him into the vault below, and a serious injury resulted.

This statement of the case does not show as matter of law, that the plaintiff was chargeable with negligence in going upon the platform. The complaint was not, however, dismissed at the circuit for that reason, but upon the ground that the evidence did not show the platform, to have been furnished by the defendants for the use to which it was put, and that it appeared to be an instrumentality adopted by a fellow servant without the knowledge or consent of the employer. The neglect, if any, was said to be that of a co-servant, for which the master was held not to be liable. The General Term seems to have taken a similar view of the case, and, therefore, affirmed the judgment. In this we think those courts erred, and that a new trial should be granted.

It has been repeatedly held that the risks of the service which *552 a servant assumes, in entering the employment of a master are those only which occur, after the due performance by the employer, of those duties which the law enjoins upon him, and that the negligence of the master co-operating, with that of a servant in producing injury to a co-servant, renders the master liable. (Stringham v. Stewart, 100 N.Y. 516 and cases cited.) It was said by Chief Judge CHURCH, in Flike v. B. A.R.R.Co. (53 N.Y. 549), that the true rule "is to hold the corporation liable for negligence in respect to such acts and duties as it is required to perform as master without regard to the rank or title of the agent intrusted with their performance. As to such acts the agent occupies the place of the corporation, and the latter is liable for the manner in which they are performed." Judge RAPALLO states the rule in Crispin v.Babbitt (81 N.Y. 521), to be that it depends "upon the character of the act in the performance of which the injury arises without regard to the rank of the employe performing it. If it is one pertaining to the duty the master owes to his servants he is responsible to them for the manner of its performance." The rule is unqualified that a master is bound to use all reasonable care, diligence and caution in providing for the safety of those in his employ, and furnishing for their use in his work safe, sound and suitable tools, implements, appliances, and machinery in the prosecution thereof, and keeping the same in repair. This is the master's duty and he cannot exempt himself from liability for its omission, by delegating its performance to another, or having required work to be done, by omitting precautions and inquiries, as to the time and manner of its performance. (Laning v. N.Y.C.R.R. Co., 49 N.Y. 521;Corcoran v. Holbrook, 59 id. 517; Slater v. Jewett, 85 id. 61; Pantzar v. Tilly Foster Mining Co., 99 id. 368.)

The master is chargeable ordinarily, with knowledge of the means necessary to be employed in performing his work, and when their procurement and selection, is delegated to a servant he stands in the place of the master in discharging those duties; and the servant's neglect in that office, is chargeable to the employer, as an omission of duty enjoined upon him. *553 (Ellis v. N.Y. Cent. R.R. Co., 95 N.Y. 546; Slater v.Jewett, 85 id. 61.)

Ignorance by the master of defects in the instrumentalities used by his servants, in performing his work, is no defense to an action by the employe who has been injured by them, when by the exercise of proper care and inspection, the master could have discovered and remedied the defects, or avoided the danger incident therefrom.

The evidence in the case, fails to disclose the previous history of the structure used as a platform, but it appears that it was already manufactured and had lain for some time previous to the accident over the boiler in the boiler-room. It was apparently made of sound lumber, and upon a casual examination would seem to have been safe, for the purpose for which it was used. An examination of it, however, after the accident disclosed, that the broken board had a knot of about two inches in diameter near its center, which must have impaired its safety for use as a platform. The under part of the board was unpainted, and the existence of the knot was presumably open to discovery upon a casual inspection of the platform, before it was placed in position.

We think that it was within the province of the jury, upon the evidence appearing in the record, to pass upon the question of the defendant's negligence, in using the structure described for a platform, and that it was error to dismiss the complaint. (Feltham v. England, L.R., 2 Q.B. 46; Coughtry v. GlobeWoolen Co., 56 N.Y. 124; Manning v. Hagan, 78 id. 615.)

The judgment of the court below should be reversed and a new trial ordered, with costs to abide the event.

All concur.

Judgment reversed. *554

midpage