78 Neb. 304 | Neb. | 1907
Lead Opinion
The plaintiff had judgment for damages on account of an injury sustained while in the employ of the defendants. The defendants appeal.
The facts concerning the injury are not disputed. The defendants were independent contractors engaged in the erection of a power house for the Omaha Street Railway Company, and were, at the time of the accident, putting-in a concrete floor in the second story. That portion of the floor at the point where the accident occurred was above a room 9 by 40 feet, with a 10 foot ceiling. To support the concrete steel I beams were placed crosswise of the room at a distance of 8, or 9 feet apart. They rested at either end upon a concrete wall, in which openings were left for that purpose. The steel beams were from 4 to 6 inches wide at the base and top, 10 inches deep, and weighed 150 pounds. The pockets into which the ends were placed were «about 10 inches wide. For the purpose of holding the concrete in position until it hardened, wooden forms were built so that they might be removed after the concrete became self-supporting. These'forms were constructed by placing a 2 by 12 inch plank lengthwise under each I beam, and were held in place by means of 4 by 4 inch pieces extending from the lower floor to the. under side of the plank, leaving a margin of from 3 to 4 inches on either side of the steel. The space between two I beams was called a section. Other planks were then placed crosswise of the section, the ends resting upon the edge of the 2 by 12 inch pieces. The forms were being-
On the day of the accident the plaintiff was engaged, during the forenoon and that portion of the afternoon up to the time the accident occurred, in another part of the building. Turner was employed constructing the forms at the place described. He commenced at the west end and was working east. He had completed 3 or 4 forms and was working, perhaps, on the fifth. The 2 by 12 at the east side of this form had been placed in position, and was supported by a 4 by 4 placed in the center of each end of the plank, leaving a projection of 4 inches of plank on each side of the support. Other planks had been laid crosswise to complete the bed of the form, with the exception of a single plank, when Turner left his work and went to the tool house for tobacco. Wooley called to the plaintiff to come and assist him in putting this last plank in place. Wooley was at the west side of the form and the .plaintiff at the east. The plank selected was a little wide for the opening, and in order to crowd it into place one edge of this plank and the edge of an adjoining plank were raised, placed together in a Y shape, and the plaintiff, in a stooping position, was attempting to crowd it into place. His weight and the pressure caused the 2 by 12 on the side where he was at work to tip, the steel beam turned over, and the form of that entire section fell with the plaintiff into the base
It is said that the accident was the result of a danger incident to the employment and was voluntarily assumed by the plaintiff; that it resulted from the incomplete condition of the form, and, if the the result of a negligent act, it was the negligence of a fellow servant. It appears that when the forms were completed, ready to bear the weight of the concrete, the 2 by 12 planks forming the base of the bed were supported each by 4 or 5 4 by 4 inch pieces, according to the weight to be carried, and that when the forms were all completed each extension of the plank beyond the base of the beam would carry an equal weight; that the dangerous condition of the form was open and obvious to all persons alike, and that the plaintiff, knowing of this condition, voluntarily assumed the risk of danger when he entered upon the form. It is true that to any person who knew the condition of the substructure the danger was obvious. It required no unusual power of observation and skill to determine, that fact; but the plaintiff did not know the condition of the substructure. He was at work on the floor then being laid. The bed of the form was all' in place with - the exception of a six-inch plank. The substructure was hidden from his view;. When he entered upon the superstructure at the command of Wooley, he would be justified in believing that the substructure was completed so that the element of obvious danger did not exist. It can not be said that the accident was the result of the negligence of a fellow servant.
It is true that one of the defendants, the only witness called on behalf of the defense, testified that either he or his partner were present all the time during the construction of the building and personally superintended' the work, and that they had no foreman; that they some
Where one servant is placed in a position of subordination to, and subject to the orders and control of, another servant of a common master, and the subordinate servant, without fault of his own, and while in the performance of his duty, is injured through the negligence of the superior servant, while acting in the common service, an action lies in favor of the inferior servant so injured against the master. The relation does not arise out of the fact that Wooley was the higher grade workman, but because of the fact that he was vested with authority to and did control and direct- the labor of the plaintiff. To a somewhat less extent this was also true of Turner, who disclosed by his own evidence that, when he desired the assistance of a common laborer, he called and directed him at his pleasure. The mischief of the case lies not alone in the incomplete condition of the form, but is rather due to the fact that the plaintiff was directed to enter upon it in its unsafe condition by his superior. The case is not to be tested by the rule that prevails where workmen are provided with material to erect a trestle upon which they are to work. Had the plaintiff himself constructed the form after being provided with suitable material for that purpose, or had he directed or controlled its construction, it may be conceded that he could not recover; but he was charged with no such duty. On the contrary, the defendants, through Wooley, assumed the supervision and control of its construction, and were bound to exercise ordinary care and make it reasonably safe and secure for those who might be called upon to use it.
The instruction complained of is as follows: “You are instructed that it is the duty of the master to use ordinary care to provide his servant with a reasonably safe working
We find no error in the record, and recommend that the judgment be affirmed.
By the Court: For the reasons stated in the foregoing opinion, the judgment of the district court is
Affirmed.
Rehearing
The following opinion on motion for rehearing was filed July 12, 1907. Rehearing denied:
This cause was submitted upon an oral argument of a motion for'rehearing. The former opinion by Jackson, C., ante p. 304, contains a statement of facts, which is accepted by counsel for both parties as sufficient.
1. It is urged that the infirmity which made the section unsafe at the moment it fell ivas due solely to its unfinished state, and therefore, that it was an inevitable risk of construction which the plaintiff assumed. This argument was met in the former opinion, and we are satisfied with the reasons there given. It is, however, proper to say that the case of Armour v. Hahn, 111 U. S. 313, cited by defendant in support of his argument, presents facts essentially different from those we are now considering. In that case, the timber which gave way was not a scaffolding or temporary structure intended to facilitate the execution of the work and then to be removed, but a component part of the building, insecure because incomplete, not intended to support the weight of the workman and upon which he was not instructed to go. In this case, the structure which gave way was a form designed to support the cement until it had hardened, and incidentally the weight of workmen during construction, after which it would, in the regular course of the work, be removed. Defects in scaffolds, forms and temporary structures, not forming part of the building, serving only as aids in construction, are not defects of the structure due to its unfinished state.
We are therefore of the opinion that the motion for a rehearing should be overruled, and we so recommend.
By the Court: For the reasons stated in the foregoing opinion, the motion for a rehearing is
Overruled.