282 Mass. 285 | Mass. | 1933
It was held in Parker v. Lowell, 11 Gray, 353, that a municipality could be held hable in tort for a negligent failure to keep a highway culvert in such condition as not to obstruct the flow of a natural watercourse, if damage was caused by a consequent flooding of the plaintiff’s premises. A similar decision was rendered in Perry v. Worcester, 6 Gray, 544, where a city had set back the water of a natural watercourse by building a bridge across it in such wise that the waterway was narrowed. The liability is not affected by the fact that the municipality is acting under authority conferred by statute, unless the statute contemplates that damage will necessarily result from the action authorized. If damage will necessarily result, then recourse must be sought by petition under the statute; and an action of tort is not the remedy. This is so because where damage necessarily results to the property of others there is, in substance, a taking of a right of the owners which under our Constitution entitles the owners to compensation. For this the statute must provide. Where, however, damage is not a necessary result, but occurs because of conduct of the municipality in performing or maintaining the authorized undertaking, there is no legitimate taking of property by legislative mandate; there is tortious action which entitles the injured person to redress from the wrongdoer. The assumption is that the Legislature intends that the work will be so carried on, and so dealt with in maintaining it, that injury will be avoided. Morse v. Worcester, 139 Mass. 389, 391, 392. These principles are enforced and illustrated in Pevear v. Lynn, 249 Mass. 486, Diamond v. North Attleborough, 219 Mass. 587, Daley v. Watertown, 192 Mass. 116, Aldworth v. Lynn, 153 Mass. 53, Bates v. Westborough, 151 Mass. 174, Stanchfield v. Newton, 142 Mass. 110, Manning v. Lowell, 130 Mass. 21. See also Washburn & Moen Manuf. Co. v. Worcester, 116 Mass. 458; Merrifield v. Worcester, 110 Mass. 216; Wilson v. New Bedford, 108 Mass. 261.
The measure of the damages recoverable where real estate is flooded differs with circumstances. If the injury is perma
It is immaterial whether the flooding is due to an overflow from the watercourse or to saturation from interrupted runoff of surface water or from a rise in the level of the water table of underground water. See Wilson v. New Bedford, 108 Mass. 261.
The case before us is to be decided in the light of the foregoing principles. The material facts are as follows: The plaintiff’s premises, lying at some distance from the borders of a natural watercourse, were flooded at various times within six years from the date of his writ, by water which backed up upon them or was raised in level and held back upon them in consequence of the raising of the level of the bottom of the watercourse or of the level of the flow in the watercourse due to blocking of the flow by pipes placed by the city under the bridge or culvert in the watercourse, and due, further, to failure to remove obstructions allowed by the city to accumulate in the bed of the watercourse. The plaintiff had no right to enter upon the watercourse to remove obstructions. In 1921, after a flooding of his cellar, he filled in the cellar bottom with cement so that the level of the cellar floor was raised. In 1926, after other floods, he put in additional cement and
The case was heard upon the report of an auditor whose findings of fact were to be final. The court awarded damages to the plaintiff for the cost of reinforcing the cellar in 1921 and 1926, $5,225.30, and for the impairment in market value, $5,142, and ordered judgment for $10,367.30 with interest from December 16, 1931. The plaintiff contends that he is entitled also to loss of rental of the basement for five years, and of stores in the building for a like period, which the auditor found to be $3,000 and $900, respectively, and, further, to interest from the date of the writ, June 10, 1927, rather than from December 16, 1931, the date of filing the auditor’s report. The defendant
There was no error in the failure to deal specifically with each of the defendant’s thirteen requests. The finding for the plaintiff for the items of damage stated established conclusively that the rulings of law requested were either denied or immaterial, and that so far as the requests involved findings of fact, the fact was immaterial or the judge found to the contrary.
A finding for the plaintiff was justified. There was no taking under the statute. The action authorized by the statute could be performed by the city without inflicting this damage. Its occurrence could be found to be due to negligence in allowing pipes to obstruct the flow of the stream, and in failing to clear the course made narrower and shallower through lack of care. An action of tort was thus a proper remedy where damage appeared. Inasmuch as the cause of trouble was not permanent and damage would cease on its removal, the diminished market value of the premises was not a proper measure of damage. Diamond v. North Attleborough, 219 Mass. 587.
The changes in the cellar effected a change in the earning power of the buildings. In so far as those changes were reasonably necessary to guard against continued flooding, the plaintiff was entitled to recover the reasonable expense, not exceeding the reduction in market value of the premises. As the premises were rendered less valuable for renting, and because the changes were found to be reasonably necessary, the loss of rental value while the flooding continued and up to the date of the writ was a proper element of damage. The rule is well illustrated in Matthews v. New York Central & Hudson River Railroad, 231 Mass. 10.
If the judge had thought proper he could have given interest from the date of the writ, Young v. New York, New Haven & Hartford Railroad, 273 Mass. 567, 571, 572, but he was not bound to do so. Peabody v. New York, New Haven & Hartford Railroad, 187 Mass. 489. We cannot properly say he was in error in his finding.
It follows that there was error in including the diminished market value of the building in the damages. The auditor reports findings of $3,000 for loss of rental value of the basement and of $900 for similar loss of value in the stores in the building during the years from 1921 to 1926. These we think should stand; and the amounts were recoverable since the cause of injury continued until the sale of the premises in 1926. Judgment should enter for the plaintiff in $9,125.30 with interest from December 16, 1931.
So ordered.