INTRODUCTION
¶ 1 Marlene Begaye appeals the district court’s grant of summary judgment in favor of Big D Construction Company (“Big D”). We conclude that Big D does not fall within the purview of the retained control doctrine because it did not exercise sufficient control over the method and manner of the injury-causing aspect of the work that caused Michael Begaye’s death. Accordingly, we affirm.
BACKGROUND
¶ 2 In 2003, Big D was hired as the general contractor on a large construction project (the “project”) at the University of Utah. In addition to managing the sequencing and work flow of the project, Big D also contracted to be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the project. Big D subsequently hired Preferred Steel, Inc. (“Preferred”) as the concrete and masonry subcontractor. Under the terms of the subcontract agreement between Big D and Preferred, Preferred was responsible for its own employеes, including providing them with the tools and equipment necessary for the job. Additionally, the subcontract agreement required Preferred to provide a safe workplace for its employees. 1
¶ 3 In early 2004, Kevin Burns, a Big D superintendent, directеd Preferred to begin building the inside face of a rebar wall known as Wall 39. Typically, the project’s walls were erected using one of two different methods. One method involved a process whereby Big D placed a concrete fоrm that provided a stable platform to which Preferred could tie steel rebar reinforcements as Wall 39 progressed. A second method involved a process whereby Preferred tied the steel rebar to an adjacent wall, which had already been poured and cured. As Preferred erected Wall 39, it supported it by a third method: using bracing only, without any concrete forms or wires in place. During the construction, the bracing broke loose, causing Wall 39 to collapse. Michael Be-gaye, a Preferred employee, was thrown to the ground and killed.
¶4 Following the accident, Marlene Be-gaye, the deceased’s wife, filed a wrongful death lawsuit against Big D. Big D moved for summary judgment on the basis that it did not have control over the manner and method of the work that caused Michael Begaye’s death, and, therefore, it could not be liable. Begaye opposed the motion and filed her own
ANALYSIS
¶ 5 Begaye raises one main issue on appeal. Begaye avers that the district court erred in granting summary judgment and concluding that Big D did not exercise sufficient control over the method and manner of Preferred’s work to have created a limited duty under the retained control doctrine.
2
“Summary judgment is appropriate only upon a showing ‘that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law.’ ”
Waddoups v. Amalgamated Sugar Co.,
¶ 6 Begaye contends that Big D is liable under the retained control doctrine because it controlled the workflow, timing, and sequencing of the construction of Wall 39. Furthermore, Begaye argues that because Big D directed Preferred to work on Wall 39 when there werе other walls it could have built that did not require bracing, Big D controlled the method and manner in which Wall 39 was constructed, bringing it within the exception to the general rule that primary employers are not liable for injuries sustained by independent contractors.
¶ 7 Big D, on the other hand, contends that summary judgment was properly granted because there was no evidence that it retained control over the specific method of bracing Wall 39 prior to its collapse. Despitе Big D’s control over the workplace generally, Big D asserts that it is not hable because it did not instruct Preferred “how to brace, where to tie off the rebar, whether to anchor the wall with guy wiring, or what equipment to use as they were putting up thе wall.” Accordingly, Big D insists, the retained control doctrine does not apply. We agree.
¶ 8 In the context of tort liability, the general rule is that “ ‘the employer of an independent contractor is not liable for physical harm caused to another by an act or omission of the contractor or his servants.’ ”
Thompson v. Jess,
a principal employer is subject to liability for injuries arising out of its independent contractor’s work if the employer is actively involved in, or asserts control over, the manner of performance of the contracted work_Such an assertion of control occurs ... when the principal employer directs that the contracted work be done by use of a certain mode or otherwise interferes with the mеans and methods by which the work is to be accomplished.
Id. ¶ 19 (emphasis added).
¶ 10 Furthermore, we noted that the requisite degree of control over the contractor’s work entails affirmatively interfering with the subcontractor’s method of performance оr instructing that a less safe method be used.
See id.
¶¶ 22, 23 (citing
Lewis v. N.J. Riebe Enters.,
¶ 11 We conclude that Big D simply did not exercise sufficient control over the method and manner of the construction of Wall 39 to bring it within the purview of the retained contrоl doctrine. Under Dayton and Thompson, Big D must have
exercised the right to ... control the work, not only with respect to the results, but also with reference to methods of procedure or means by which the result was to be accomplished, where the will and discretion of [Prеferred] as to the ... methods of accomplishing the results were subordinate to that of [Big D].
Dayton,
¶ 12 Finally, although Big D “ordered” Preferred to build Wall 39 when it could have sent the employеes home for the day or sent them to work on another wall, such direction is insufficient to bring it within the scope of the “active participation” standard articulated by this court. “ ‘It is not enough that [Big D] ha[d] merely a general right to order the work stopped or resumed.... Such a general right is usually reserved to employers, but it does not mean that [Preferred was] controlled as to [its] methods of work, or as to operative detail.’ ” Id. ¶ 20 (quoting Restatement (Second) of Torts § 414 cmt. c (1965) (emрhasis in original)).
¶ 13 Big D did not control the method by which Wall 39 was braced prior to construction, nor did it affirmatively interfere with Preferred’s work. Moreover, it did not insist that a certain method be used to construct Wall 39. As such, Big D does not fall within the narrow contоurs of the retained control doctrine.
CONCLUSION
¶ 14 We conclude that Big D did not actively participate in or control the specific method by which Wall 39 was built; therefore, it is not liable under the retained control doctrine. Accordingly, we affirm the district court’s grant of summary judgment in favor of Big D.
Notes
. Preferred's subcontract agreement states as follows:
At all times while any of your employees, agents, or subcontractors are on the Owner’s premises, you are solely responsible for providing them with a safe work place of employment, and you shall inspect all areas where they may work and shall promptly take action to correct conditions which are or may becоme unsafe.
. Begaye also argues that Big D had a contractual duty to provide a safe work environment and is therefore liable — as a matter of law — for injuries sustained by a subcontractor. Although Big D had a general supervisory role over the project, including a contractual obligation to oversee employee safety, this simply does not equate to exerting control over the method and manner of the injury-causing aspect of Preferred's work.
See Martens v. MCL Constr. Corp.,
. The following deposition testimony was given by Preferred employee Todd Jex:
Q: [T]his decision ... to go forward with [Wall 39] under the circumstances without forms in place ... and by using the braces only, who made that judgment?
[[Image here]]
A: I would say probably myself and then talking to everybody.
[[Image here]]
Q: Is that a decision that you depended on in any way for Big D to make for you[?]
A: No. That's what I decided we would do.
Q: If you had felt that you did not want to go forward ... without first having the forms in place, could you have made that choice?
[[Image here]]
A: Yes.
. We note that there are serious public policy concerns in hоlding a general contractor liable for injuries of a subcontractor simply because it has a supervisory role and has closely monitored safety on the job site as a responsible general contractor should. "Penalizing a general contractor's efforts to promote safety and coordinate a general safety program among various independent contractors at a large jobsite hardly serves to advance the goal of work site safety.”
Martens v. MCL Constr. Corp.,