128 A. 115 | Conn. | 1925
This is an action brought by the plaintiff corporation to recover an agreed compensation for work done and materials furnished in the repair of the roof of a building owned by the defendant. The defendant counterclaims for damage which he alleges he suffered by reason of the defective manner in which the repairs were made. The plaintiff seeks to have numerous corrections made in the finding, but as to most of the proposed changes the evidence or the inferences which might be drawn from it patently support the finding or were at least conflicting; the others would be immaterial, and only two require discussion. The court finds that the agreement between the parties was made about November 1st, 1920, and the plaintiff seeks to have the finding corrected so that the contract relationship would be based upon a letter which admittedly was sent by the plaintiff to the defendant under date of October 29th, and which is in form at least a proposal to do the work for a certain sum. Nothing appears in the evidence as to the circumstances under which this letter was written, and while the testimony as to the actual making of the oral agreement found by the court is somewhat sketchy, still there is no sufficient ground in the evidence to overturn the court's conclusion that the oral contract fixed the rights of the parties. If that is so, *154
whatever might have been the plaintiff's intent in sending the letter, it could not, unless assented to by the defendant, alter those rights. C. and C. ElectricMotor Co. v. D. Frisbie Co.,
The roof of the building in question was originally constructed by the use of pitch over which had been spread slag, and the repairs were made by applying more pitch. If pitch of a proper quality had been used and the work properly done, this method would have been effective. The repairs were made about November 1st, 1920. When the roof was subjected to summer heat, the pitch which had been poured over the roof ran down in considerable quantity to the entrance of a drainage pipe and clogged it, with the result that rain water accumulated, overflowed the flashings and penetrated into the interior of the building to its substantial injury. The finding states that the reason the pitch ran was that it was not applied upon a dry roof surface, as it should have been, and that a much larger amount than should have been applied was used, and the trial court concludes that *155
therefore the plaintiff should recover nothing but should compensate the defendant for the injury to his building by the overflow of the water. The repairs having been defectively made, the right of the plaintiff to recover, its default not being wilful, could only be based upon a finding that it had substantially performed its obligation. Pinches v. Swedish EvangelicalLutheran Church,
The defendant was entitled to recover damages for the injury to the interior of the building by reason of the plaintiff's defective performance of its obligation. "Of course, injury to a building from rain would be within the contemplation of the parties, and the proximate result of defective work under a contract the very object of which was to prevent that very injury."Gibson, Lee Co. v. Carlin,
The counterclaim concludes: "Defendant claims $800 damages." If this claim were defective in form, the plaintiff, not having raised the point below, would not now be heard to complain. It will be found, however, that our practice permits the claim for relief in a counterclaim to be stated in various ways; Practice Book, pp. 478, 493, 501, 502; and if in certain cases more might be required, that here used was sufficient for this case.
There is no error.
In this opinion the other judges concurred.