This сase involves a challenge under the Administrative Procedure Act, 5 U.S.C. §§ 551 et seq., to a change in the way the United States Forest Service (“Forest Service” or “agency”) classifies trails within the National Forest System. Plaintiff Back Country Horsemen of America (“BCHA”) claims that the revision, which was implemented without formal public participation, violated Sections 6 and 14 of the National Forest Management Act (“NFMA”), Pub.L. No. 94-588, 90 Stat. 2949 (codified as amended at 16 U.S.C. §§ 1604, 1612), and the National Environmental Policy Act of 1969 (“NEPA”), 42 U.S.C. §§ 4321 et seq. Currently before the Court are the parties cross-motions for summary judgment. Because the Court finds that the Forest Service failed to provide for public notice and cоmment as required by 16 U.S.C. § 1612, but complied with NEPA, it will grant each party’s motion for summary judgment in part and remand the case to the agency for further proceedings.
BACKGROUND
The Forest Service manages roughly 192 million acres of land within the National Forest System (“NFS”). 68 Fed.Reg. 33582 (June 4, 2003). Approximately 133,-000 miles of NFS trails are maintained by the Forest Service and available for use by the public. 70 Fed.Reg. 68264 (Nov. 9, 2005). Before the revision at issue in this case, the Forest Service’s Trail Classification System (“TCS”) identified trails as Primary/Mainline, Secondary and Way. (AR 1326.) In addition, the Forest Service assigned one of three difficulty levels to each of its trails: most difficult, more difficult, and easiest. (AR 11.) The difficulty levels were defined generally in the Forest Service Manual (“FSM”). (AR 11.) In addition, the Forest Service Handbook (“FSH”) sets out specific physical parameters for each difficulty level, including maximum pitch grade and length, clearing width and height, tread width and surface. (AR 63-65.) According to the agency, these two three-category classification systems did not correlate precisely with each other. (Fed. Def.’s Mem. in Opp. to PL’s Mot. for Summ. J. and Mem. in Supp. of its Cross-Motion for Summ. J. (“Def.’s Mot.”) at 4.) That is, any trail class could, in theory, be rated any difficulty level.
Since the early 1990’s the Forest Service has been working to improve its management of information related to the national trail system. (AR 1353.) In 1994, the Forest Sеrvice added a “trails module” to its national database (“Infra”) to collect information regarding the condition of its trail inventory nationwide. (Def.’s Mot. at 4.) In 1997, the Forest Service implemented Meaningful Measures (“MM”), a spreadsheet designed to apply “business management principles to recreation [management].” (AR 696.) MM is a “project and site-level management system” (AR 697) that tracks the costs of maintaining agency facilities, including trails. (AR 1353.) Infra and MM were intended to compliment one another: “Data contained in [Infra] should speak primarily to the facilities on the ground for trails,” while “[a]ny qualitative assessments or costing should ... be done through Meaningful Mеasures.” (AR 170.) The agency found, however, that information gathered through Infra and MM was not always readily integrated (AR 666-71, 695-96), making it difficult to gather “consistent, uniform data on real property inventory, condition of facilities, program priorities,
To remedy this problem, in 1998 the Forest Service began developing a five class trail system to replace the existing way, secondary and mainline trail system. (AR 172-75.) The new trail class system was incorporated into MM in 1999 and served to “stratify the Trail System for various projects including INFRA inventory, Forest Planning Objectives, Visitor Information, and helping to establish coefficients for MM costing.” (AR 1813.) In 2000, the agency formed the Trails Development Team (“TDT”) tо further refine the new trail class system. (AR 3.) The TDT introduced five “trail fundamentals” — (1) trail class, (2) trail type, (3) managed use, (4) designed use and (5) design parameters — “as cornerstones of Forest Service trail planning and management.” (AR 83.) Integrated into Infra and MM, these concepts, while “not entirely new, ... provide an updated -and expanded means to consistently record and communicate the intended design and management guidelines for trail design, construction, maintenance and use.” (AR 83.)
The five class trail system, which remains in effect today, is as follows: Trail Class 1 — Minimal/Undeveloped; Trail Class 2 — Simple/Minor Development; Trail Class 3 — Developed/Improved; Trail Class 4 — Highly Dеveloped; and Trail Class 5 — Fully Developed. The new trail classes are assigned to existing trails according to the current physical characteristics of the trail. (AR 81.) Relevant physical characteristics include tread and traffic flow, obstacles, constructed features and trail elements, signs, and typical recreation environs and experience. (AR 87-88.) The trail class matrix also includes additional criteria specific to pack and saddle trails. (AR 89.) Designation of a trail class is made “by local managers at the trail-specific level.” (AR 88.) Though the physical characteristics found in the trail class matrix (AR 87-92) “help[ ] guide the trail managеr’s decision-making process” (AR 81), local managers may take into account “Forest Plan direction and other considerations” when assigning a trail class. (AR 88.) Furthermore, the proper trail classification is intertwined with the managed and designed use of the trail under the Forest Plan.
2
(AR 81 (“There is a direct relationship between Trail Class and Managed Use ... and one cannot be determined without consideration of the other.”).) Local managers are instructed to “choose the [trail class] that most closely matches the managed objective of the trail.” (AR 84, 128, 165; see
also
AR 1540.) Once a trail class has been
It is undisputed that the Forest Service did not provide for any formal public participation in the creation of the new trail classification system. (Def.’s Answer ¶ 21.) The Forest Service’s failure to do so lies at the heart of BCHA’s complaint. BCHA alleges that the agency violated provisions of NFMA that require an agency to solicit and consider public comment in certain circumstances and failed to comply with NEPA. (Pl.’s Mot for Summ. J. (“Pl.’s Mot.”) at 6-7.) At issue for the Court is whether any of the statutory preconditions mandating formal notice and comment under NFMA were triggered by the Forest Service’s development and implementation of a new trail classification system and whether the implementation of the new trail classification system imposed any obligations on the agency under NEPA.
ANALYSIS
I. Standard of Review
Because neither NFMA nor NEPA creates a private right of action,
see Town of Stratford, Conn. v. F.A.A.,
II. Ripeness
As a preliminary matter, the agency contends that BCHA’s claims are not yet ripe for review. The ripeness requirement serves “to prevent the courts, through avoidance of premature adjudication, from entangling themselves in abstract disagreements over administrative poliсies, and also to protect the agencies from judicial interference until an administrative decision has been formalized and its effects felt in a concrete way by the challenging parties.”
Abbott Labs. v. Gardner,
Ohio Forestry differs from the instant case in several meaningful respects. First, Ohio Forestry involved a challenge to the substance of a land and resource management plan, which, it is significant to note, was developed subject to notice and comment proceedings. See 16 U.S.C. § 1604(d). Here plaintiff mounts a procedural challenge to the agency’s failure to engage in notice and comment. If plaintiffs opportunity to comment has been improperly denied, then delaying review will impose a substantial hardship by failing to vindicate plaintiffs procedural right. Second, in Ohio Forestry, several intermediate procedural steps, including ones involving public comment, remained for the agency to take before the substantive harm alleged by plaintiffs could become concrete. Thus, opportunity remained for plaintiffs to remedy the perceived harm at the administrative level prior to implementation. In contrast, the agency in this case is implementing the new trail classification system and accompanying design parameters. Even if plaintiff can contest a specific trail classification, it will have no further opportunity to participate in the formulation of the design parameters themselves. Third, because plaintiffs in Ohio Forestry were mounting a substantive challenge to the Plan, further factual development would be of assistance to the Court in ascertaining the scope of the alleged harm. Here, plaintiffs are not seeking a specific substantive outcome, but rather an opportunity to participate in the administrative process. Thus, further factual development does not serve the same purpose in this case as it did in Ohio Forestry. The Court therefore finds BCHA’s claims ripe for review and will proceed to the merits.
III. BCHA’s Challenge Under Section 14 of NFMA
BCHA’s first argument is that the agency’s failure to solicit public comment before implementing the new trail classification system violated Section 14 of NFMA, 16 U.S.C. § 1612. (PI.’s Mot. at 8-15.) That provision requires the Forest Sendee to “establish procedures ... to give ... the public adequate notice and an opportunity to comment upon the formulation of standards, criteria, and guidelines applicable to Forest Service programs.” 16 U.S.C. § 1612(a). The agency’s regula
The Forest Service makes three arguments to support its position that implementation of the new trail classification system did not trigger the public participation requirements of section 1612. First, it argues that the trail classification system was not published in the Forest Service Manual, and therefore it automatically falls outside the regulatory definition of “standards, criteria, and guidelines” found at 36 C.F.R. § 216.2(c), thereby eliminating the need for notice and comment. (Def.’s Mot. at 22.) The agency claims that its regulations are entitled to
Chevron
deference. (Def.’s Reply at 8 (citing
Chevron, U.S.A., Inc. v. Natural Res. Def. Council,
Since the phrase “standards, criteria, and guidelines” is ambiguous, under step two of
Chevron
the Court must consider the reasonableness of the distinction drawn in the agency’s regulations between the Forest Service Manual and the Forest Service Handbook. Even granting deference under
Chevron,
however, the agency’s choice of publication cannot, by itself, immunize the agency from the statutorily mandated requirement of notice and comment. Importantly, 16 U.S.C. § 1612 does not distinguish between materials published in the Manual and those published in the Handbook. Rather, it mandates notice
Second, drawing
on
the definition of “standards, criteria, and guidelines” found in the regulations, the agency argues that the trail classification system does not provide a “general framework for the manage
Understood in this way, the design parameters serve more than just the Forest Manual’s Inventory Directive (FSM § 2353.14, AR 32); they also implement Manual directives to local agency staff to “[m]anage National Forest System trails to carry out the objectives and direction established in the Forest Plans” (FSM § 2353.03, AR 27), to “manage each trail to meet the objective(s) developed for that trail or network of trails” (FSM § 2353.19, AR 33), and to “design the trail for the mode of travel requiring the most demanding construction specifications.” (FSM § 2353.2, AR 33.) Given the Forest Service’s intention that the new trail classification system and design parameters function as a “tool [for] local program managers” (AR 1174), and “guide the trail manager’s decision-making process” (AR 81), the agency’s action falls within the ambit of “written policies, instructions or orders ... which establish the general framework for the management and conduct of Forest Service programs,” 36 C.F.R. § 216.2(c), or more generally, of “standards, criteria, and guidelines applicable to Forest Service programs.” 16 U.S.C. § 1612(a).
Third, the Forest Service asserts that the new design parameters “have no on-the-ground impact on pack and saddle stock use and do not change the management direction of NFS trails.” (Def.’s Mot. at 23.) Even assuming that the agency is correct that there will be no changes on the ground, the relevance of that fact within the context of the statute-
IV. BCHA’s NEPA Challenge
Under NEPA, federal agencies must “examine the environmental effects of proposed federal actions and ... inform the public of the environmental concerns that were considered in the agency’s decisionmaking.”
Citizens Against Rails-to-Trails v. Surface Transp. Bd.,
Promulgating a CE requires an agency to comply with specific procedures established by the Council on Environmental Quality (“CEQ”), the administrative agency charged with implementing NEPA.
The Forest Service asserts that the develоpment and implementation of the new TCS falls within the categorical exclusion for “[r]ules, regulations or policies to establish Service-wide administrative procedures, program processes, or instructions.” 57 Fed.Reg. 43180; FSH § 1909.15, ch. 31.1. Examples of this CE are defined in the Handbook as “[proposing a technical or scientific methodology or procedure for screening effects of emissions on air quality related values in Class I wildernesses;” and “[establishing a Service-wide process for responding to offers to exchange land and for agreeing on land values.” Id. Plaintiff argues that the Forest Service’s assertion of a CE is a “posthoc” rationаlization because there was “no documentation” relating to the basis for the agency’s decision. (PL’s Mot. at 16.) Such an argument fails because the CE in question is one for which “no decision memorandum is required.” 57 Fed.Reg. 43180; FSH § 1909.15, eh. 31.12. Therefore, the agency had no obligation to formally document its decision. Plaintiff next argues that, at the time implementation of the new TCS began, Forest Service regulations prohibited the use of CE’s with respect to wilderness areas, steep slopes and other specified geographic areas. (PL’s Mot. at 17) (citing 67 Fed.Reg. 54622-23 (Aug. 23, 2002).) The regulation on which plaintiff relies, however, explicitly notes that “the mere presence оf these resource conditions does not necessarily preclude use of a categorical exclusion.” 67 Fed.Reg. 54623. Rather, “if uncertainty exists over the significance of environmental effects, a categorical exclusion would not be appropriate.” Id.
Thus, the critical issue is the reasonableness of the agency’s conclusion that the new trail classification system and design parameters “has no impact on the environment.” (Def.’s Mot. at 32.) The agency contends that the “TCS is an internal inventory and information management tool.... Trail classification, under both the prior and current systems, is driven by the development scale оf the trail and preexisting direction in the land management plan, travel management plan, and trail-specific decisions.” (Def.’s Mot. at 33 (citing AR 1529).) Plaintiff counters that “[b]ecause the new TCS applies to all trails within the National Forest System lands on a nationwide basis, ... it thereby constitutes a major federal action significantly affecting the quality of the human environment.” (PL’s Mot. at 18.) This argument obviously fails because it is not the scope of the agency action, but rather whether it “significantly affectfs] the quality of the human environment” that determines whether an EA or EIS is required. 42 U.S.C. § 4332(2)(C).
In its reply, plaintiff advances yet another argument; namely, that the design parameters “are the active maintenance criteria for trails, and thus directly determine
CONCLUSION
For the foregoing rеasons, the Court will grant plaintiffs Motion for Summary Judgment in part and deny it in part, and will grant defendant’s Cross-Motion for Summary Judgment in part and deny it in part. The case is remanded to the United States Forest Service for further proceedings consistent with this Memorandum Opinion. An appropriate Order accompanies this Memorandum Opinion.
ORDER
Upon consideration of plaintiffs Motion for Summary Judgment and Motion to Supplement the Administrative Record, defendant’s Cross-Motion for Summary Judgment, both parties’ written submissions pursuant thereto, and the administrative record, it is hereby
ORDERED that plaintiffs Motion for Summary Judgment [#17] is GRANTED IN PART and DENIED IN PART; it is further
ORDERED that defendant’s Cross-Motion for Summary Judgement [#18] is GRANTED IN PART and DENIED IN PART; it is further
ORDERED that plaintiffs Motion to Suрplement the Administrative Record [#23] is GRANTED; it is further
ORDERED that the case be remanded to the United States Forest Service for further proceedings consistent with the attached Memorandum Opinion.
SO ORDERED.
Notes
. For example, as noted supra, despite substantial overlap, the agency's trail classifications (mainline, secondary and way) did not correlate exactly with the trail difficulty designations (easiest, more difficult, most difficult). (See AR 168 ("Most often, the standards prescribed for Mainline trails are those defined for 'Easiest,' ... however some are 'More Difficult.’ ").) Additionally, confusion among field workers between "trail maintenance levels and trail class” undermined the reliability of data collected through Infra for MM's cost analysis purposes. (AR 170.)
. The managed uses of a trail are the "mode(s) of travel that are actively managed and appropriate, considering the design and management of the trail." (AR 85 (emphasis in original).) Thus, there may be more than one "managed use” for any given trail. (AR 85.) In contrast, the "designed use” of a trail is the single managed use that "determines the technical specifications for the trail." (AR 85.) Typically, the designed use is the managed use that "requires the highest level of development.” (AR 85.) The managed and designed uses of a trail are established "by individual forest staffs ... with the public's active assistance,” and any changes require "a public involvement prоcess in land management planning determinations, including appropriate [NEPA] review.” (AR 165.)
. Notably, the regulations do not provide a definition of a "Forest Service program.” At one time, the regulations defined "program” as "land and resource activities, or combinations of them, conducted by the Forest Service.” 36 C.F.R. § 216.1 (1983). This section was revised, and the definition was eliminated in 1984. 49 Fed.Reg. 16991-16994 (April 23, 1984);
see also Nat’l Wildlife Fed’n v. Coston,
. Of additional concern, the agency appears to have deviated, at least to a limited extent, from past practice with respect to the inclusion of trail classification information in the Forest Service Manual. While the prior trail classes — primary, secondary and way — are contained in the Forest Service Handbook (see AR 168), the difficulty levels are defined and published in the Forest Service Manual. (See AR 11, 13, 31 ("Difficulty is a function of trail condition and route location factors such as alignment, steepness of grades, gain and loss of elevation, availability of drinking water, and amount and kind of natural barriers that must be crossed.”).) The Handbook, recognizing that "[d]ifficulty level has design imрlications” (AR 58), fleshes out how to assign difficulty levels to specific trails. (See AR 63 (categorizing difficulty levels according to grade (steepness), clearing width and height, tread width and trail surface material).) According to the agency, the "Design Parameters are an associated management tool and are an update of the old difficulty level.” (AR 164.) Yet, despite the fact that the "Design Parameters are currently undergoing agency-wide application and validation” (AR 81), the agency appears to have updated neither the Forest Service Manual nor the Forest Service Handbook to reflect the new trail classification system and dеsign parameters. (See AR 18-38 (current Manual) and AR 39-79 (current Handbook).) Two problems with the agency’s approach are apparent. First, the Forest Service Manual and Handbook, which still reference "Difficulty Levels” (AR 31, 40), are now inconsistent with the Forest Service’s current policies regarding trail classes and design parameters. Second, to the extent that the agency intends to wait to update the Forest Service Manual and Handbook until it has fully implemented the new trail classification system, the intended benefits of public notice and comment will have been lost.
. The Court’s finding that the agency was required to follow notice and comment procedures under 16 U.S.C. § 1612 moots the plaintiff’s arguments under 16 U.S.C. § 1604. Therefore, the Court need not express any opinion on the merits of that claim.