Plaintiff Asher brought her action for personal injuries and property damage which she suffered when a portion of the shopping center parking lot pavement at 3600 Broadway collapsed beneath her car on March 3, 1979. Claims were made against the Broadway-Valentine Center, Inc., on various allegations of negligent failure to construct, maintain and repair the pavement and its subsurface in a reasonably safe condition and failure to warn of the unsafe condition. Similar allegations were made against the Broadway National Bank, but plaintiff dismissed her claim against it on the first day of trial. Plaintiff’s claim against the Tom Martin Construction Co. was on the theory of negligent back-filling and soil compaction after it installed pneumatic tubes running underground from the bank to and from its facility located in the southeast corner of the parking lot. The trial court directed a verdict in favor of Tom Martin Construction Co. on plaintiff’s claim against it at the close of her evidence.
The jury returned a verdict for plaintiff in the amounts of $75,000 for personal injuries and $500 property damage against Broadway-Valentine Center, but the trial court set aside the verdict and granted a new trial to it upon the stated ground “that the Court erred in granting the motion for directed verdict of Tom Martin Construction Company.”
Both plaintiff and Tom Martin Construction Co. say that the trial court’s granting of the new trial to Broadway-Valentine on the stated ground, not being a discretionary ground, was error. They reason thus: Plaintiff sued both Broadway-Valentine and Tom Martin Construction Company as co-defendants, i.e., joint tort-feasors. Broadway-Valentine never did file a cross-claim for indemnity against Tom Martin Construction Co. for a determination of the percentages of their fault as contemplated by
Missouri Pacific Railroad Company v.
Broadway-Valentine, under the posture of this case (lack of pleading of a cross-claim for indemnity), is not aggrieved or prejudiced by the direction of a verdict for Tom Martin Construction Co., which was done upon the ground that plaintiff had failed to introduce substantial evidence of the latter’s negligence. The ruling was on a matter of law, and was not therefore based upon any discretionary ground.
Swift v. Bagby,
Plaintiff does not appeal the judgment directing a verdict for Tom Martin Construction Co. She must therefore be deemed to be satisfied with her verdict against Broadway-Valentine, a defendant found to be liable. The trial court was in error in granting Broadway-Valentine a new trial on the ground that it erred in directing a verdict for Tom Martin, because under the above cited cases it has no cause to complain that a co-defendant has been absolved from liability to plaintiff.
Broadway-Valentine contends that the trial court erred in failing to grant its motion for judgment N.O.V. It says that there was no evidence presented by plaintiff that it knew or should have known that there was a void under its parking lot which could have caused it to be unsafe for business invitees such as plaintiff.
Robert Bosley testified by deposition that he was about four feet behind plaintiff’s car when it fell into the hole. He had dropped off his wife at the Safeway store on the west side of the parking lot, and then he drove around the lot trying to find a parking place. He described the parking lot as being in bad shape with chuckholes all over the driveway, “some in there maybe a foot round, maybe two foot round.” There was a lot of gravel scattered around everywhere from cars splashing it out of the holes. The sewer drains were all messed up by not being set properly in the ground, “Well, they were sticking up. One corner might have been pushed up and the other one might have been pushed down in the ground.” After the car was taken out of the hole he looked in it, it being 2¾⅞ to 3 feet round and probably 4 feet deep. There was gravel and blacktop in the bottom. There were puddles of water everywhere on the whole parking lot. There was a storm drain hole south of the hole where plaintiff’s car fell.
William McFall had worked for Broadway-Valentine for four years prior to 1980 in general maintenance and grounds-keeping. In the 2V2 years prior to March, 1979, there were always potholes showing up, the biggest of which would range from 3
Consulting engineer Willis E. Salyers testified as an expert witness for plaintiff. He was given a hypothetical question incorporating these facts: For 2¾⅛ years potholes were always showing up requiring on the average 500 pounds to a ton of asphalt to fill. The parking lot had a lot of cracks in it which had been a problem for about 2V2 years. Trucks driving over the lot would push the asphalt down, and after passage it would come back up. A previous hole 7 to 8 feet long, 4 feet wide and 3 feet deep, had formed requiring about 8 tons of material to fill it, and a maintenance man saw that the ground was washing out below the asphalt surrounding the hole. The area drains had a history of being clogged, and surface water would gather and seep down through cracks. He gave his opinion that the condition of the parking lot subsurface was that it was totally saturated with water, leaking and leaching, and probably channeling — running in open streams under the surface. It was a bad condition causing a considerable weakening of the bearing strata of the soil. As the soil yields, so does the asphalt, and it breaks allowing more water to get into it. A hole of the size hypothesized would require it to be imperative that one find out what caused it, at an engineering cost of $100 or less. Salyers also gave opinion that the collapse of the parking lot (he termed it a collapse not due to a pothole) was due to improper compaction of the corrugated metal tube (about 100 feet long and 4 feet in diameter) with back-fill material, and the lifting of the tube by the construction company (Tom Martin) during the construction process. As noted, the trial court absolved Tom Martin Construction Company by direction of the verdict as to it, from which plaintiff did not appeal, so improper compaction of the tube by it is not here an issue.
Plaintiff has not supplied this court with any authority that the facts of this case supply notice or knowledge to Broadway-Valentine of the dangerous condition of this parking lot, where the surface has collapsed into a void upon a vehicle traversing it. Nor has independent research revealed any such authority. General principles must apply. First, the duty of owners or occupants of lands or buildings to invitees (plaintiff being an invitee), generally, is to use ordinary care to have the premises in a reasonable, safe condition for use in the manner consistent with the purpose of the invitation. Anno.
It is true as stated in Broadway-Valentine’s cited cases that it must be shown that it had actual or constructive knowledge of the dangerous condition of its parking lot before it can be liable to plaintiff. Cf.
Pagano v. Kalbrener, Inc.,
For some 2½ years prior to the time that plaintiff’s vehicle fell into the hole, on the surface of the parking lot, potholes were always showing up requiring constant repair with large amounts of asphalt. There were cracks all over it, and water backed up onto it from storm drains. Large trucks passing over it caused the surface to pump up and down, indicating that the subsurface support was insufficient. According to McFall, the general condition of the lot was that the ground underneath it was washing away, and there had been a previous large hole formed which showed the ground washing away from its edges. The actual knowledge of Broadway-Valentine's employee, McFall, as to the condition of the paving and subsurface, is imputable to it.
Maybee v. Missouri Orpheum Corporation,
According to Salyer, the condition of the subsurface was that it was totally saturated with water seeping down through cracks, and then leaking, leaching and probably channeling in open streams. He testified that it would cost little to investigate and find out what caused the hole to form.
All of the facts and circumstances were sufficient to have given Broadway-Valentine actual and constructive knowledge that something was amiss with respect to the condition of its parking lot, giving rise to a duty of inspection and investigation to discover the existence of hidden danger, and to remedy the situation so as to make it reasonably safe for invitees such as plaintiff coming onto the property. The trial court did not err in failing to grant Broadway-Valentine’s motion for judgment N.O.V.
Plaintiff testified that after her injuries of March 3,1979, her condition was improving until she was involved in a rear-end collision in June, 1981. For that latter accident, she received a prescription for a TENS unit to assist in the control of pain. She also sustained injuries when she fell over her dog in September, 1981, which triggered a recurrence of pain. Then she was again in a rear-end accident, for which she sought medical treatment, one week prior to trial. Instruction No. 9 on damages submitted only “the occurrence mentioned in the evidence” in accordance with MAI 4.01 (1980 Revision). Broadway-Valentine contends that there was error in failing to modify Instruction No. 9, in accordance with Notes on Use “in any case where the evidence discloses more than one event which is claimed to have caused plaintiff’s injuries or damages.” Plaintiff pleaded only the collapse of the surface of the parking lot as the cause of her injuries, and her verdict directing instruction sub
Broadway-Valentine claims error in the trial court’s direction of a verdict against it on its cross-claim against Broadway National Bank, its lessee. The cross-claim pleads for indemnity based on the contractual agreement of the lease, the original of which contained this provision: “28. Lessee shall protect, indemnify, and save harmless the lessor against all damage or claims for damage and all loss, liability or expense, including all costs of attorneys’ fees, on account of claims for injuries of any kind whatever, including damage or destruction to property occurring in, on or about said leased premises, or on the sidewalks or approaches adjacent thereto and against any claim for any injury or damage resulting from any work done by lessee on the leased premises, even if undertaken with the consent of the lessor * * *.” On March 8, 1976, when the bank desired to build a drive-in facility on the southeast corner of the premises which involved the buried installation of a 48 inch corrugated metal pipe to carry pneumatic tubes to and from the facility to the main bank, this modification of the lease was made: “4. Upon approval of such plans and specifications by the respective parties, lessee at its sole cost and expense, shall diligently proceed to construct said drive-in facility in accordance with said plans and specifications. Lessee shall secure all permits requisite to the construction of said drive-in facility and shall, during the construction thereof, comply with all applicable legal requirements. Said drive-in facility shall be constructed in a workmanlike manner * * * >t
Broadway-Valentine pleaded in its cross-claim that if it should be found to be negligent as alleged by plaintiff, it is entitled to be indemnified and held harmless in keeping with the terms of the contractual agreement between it and the bank as hereinabove set forth. It prayed for complete indemnification as to any sums that might be assessed against it because of plaintiff’s claim for damages and for costs and attorneys’ fees.
In
Kansas City Power & Light Co. v. Federal Const. Corp.,
Broadway-Valentine argues further that it was entitled to be indemnified by reason of the bank’s alleged failure to perform the work of installing its facility in a workmanlike manner. That would be a breach of contract theory which Broadway-Valentine never did plead. Rather, it pleaded a theory of recovery based upon its claim of contractual indemnity. No proof was elicited that the bank, through its contractor, Tom Martin Company, performed the work of installation of the 48 inch corrugated pipe in an unworkmanlike manner. There was, however, some evidence that the corrugated pipe was installed in a negligent manner, but Broadway-Valentine never did plead that it as an alleged tort-feasor was entitled to contribution on a comparative fault basis under
Missouri Pacific Railroad Company v. Whitehead & Kales Company,
Plaintiff says that the trial court erred in not submitting her requested Instruction Z, on the issue of punitive damages. Where the pleadings and evidence so warrant, the issue of punitive damages should be submitted to the jury,
Hallmark v. Stillings,
The order granting Broadway-Valentine a new trial is reversed, and the case is remanded with directions to reinstate the verdict for plaintiff. In all other respects, the judgment is affirmed.
All concur.