R. D. ANDRUS аnd Virginia M. Andrus et al., Plaintiffs and Appellants, v. STATE of Utah et al., Defendants and Respondents.
No. 13716.
Supreme Court of Utah.
Sept. 5, 1975.
541 P.2d 1117
HENRIOD, C. J., and ELLETT, TUCKETT and MAUGHAN, JJ., concur.
mony, see Moore v. Prudential Insurance Company of America, 26 Utah 2d 430, 491 P.2d 227 (1971); Jensen v. Logan City, 96 Utah 522, 88 P.2d 459 (1939).
Merlin R. Lybbert, of Worsley, Snow & Christensen, Salt Lake City, for State and County.
Ralph L. Jerman and B. L. Dart, Jr., of Jerman & Dart, Salt Lake City, for Gibbons & Reed Co.
TUCKETT, Justice:
The plaintiffs initiated these proceedings in the District Court of Salt Lake County wherein they seek to recover for damage sustained by their рroperties from flood
The plaintiffs in this action are all home owners residing in an area immediately west of Wasatch Boulevard near 4500 South in Salt Lake County, Utah. The area is located on the slopes of Mt. Olympus, which rises sharply from the valley floor as a part of the Wasatch Range. In 1968, Gibbons & Reed Company was awarded a contract by the state of Utah to construct a segment of an interstate highway running north and south from Interstate 80 to approximately 4700 South Street. The highway followed Wasatch Boulevard which was relocated on a new alignment to the east of the new highway which was to serve as the Belt Route to and from Interstate 80. The highway as laid out runs on a downgrade from 3900 South to approximately 4600 South Street where there is a sharp uрgrade to a point where it joins Wasatch Boulevard. The depression in the grade of the highway is referred to in the record as a “grade sag.” In the construction of the highway a cut was made along the slope of the mountain in which the traveled portions and median strip were established. In the process of construction, the curb which ran along the western edge of Wasatch Boulevard was removed. As of April 3, 1969, the date of the first flood, the cut had been made along the slope of the mountain, but the storm drain system for the highway had not been completed. As of August 17, 1969, the date of the second flood, the concrete driving lanes had been laid and the highway drain system had been connected to the storm sewer system of Salt Lake County. Had the curb been in place along the Wasatch Boulevard it would have tended to divert the water which accumulated during heavy rainstorms from the slope of Mt. Olympus, away from the properties of the plaintiffs. On April 3, 1969, a heavy rainstorm washed earth and debris from the construction site onto the properties owned by Robert P. Kunkel and Frances Kunkel, they being the only plaintiffs who claim damages resulting from the effects of that storm. The proceedings in which Richard Grotepas is the plaintiff name only Gibbons & Reed Construction Company and the state of Utah as defendants.
On August 17, 1969, a heavy rainstorm occurred on the slopes of Mt. Olympus in the vicinity of 4500 South and Wasatch Boulevard during which approximately 2.5 inches of rain fell. The runoff from the slopes and residential areas above Wasatch Boulevard collected on the relocated street and with the west curbing being removed, flowed over the street and onto the Belt Route under construction. The newly constructed grade and driving lanes channeled the water southward, where it collected in the basin formed by the “grade sag” above referred to. The flood waters broke through the embаnkment on the west side of the freeway and flooded the homes of all the plaintiffs except the plaintiffs Robert and Frances Kunkel. Prior to the storm, gratings or other devices had not been placed at the entrances to the County‘s storm sewer laterals to prevent their being obstructed by boulders and other debris. During the course of the storm and the flooding, the storm sewers below the construction project became obstructed with debris and the hydrostatic pressure blew the caps from the manholes and water escaped from sewers which added to the flooding problem.
With respect to the liability of the State, the trial court submitted the following proposition to the jury: “The highway project of the state of Utah, including the storm drain system, was unreаsonably defective or dangerous.” The jury answered that interrogatory in the affirmative and the jury further found that the defective
The record supports thе proposition that the State created a dangerous condition by its design of the highway project which allowed large quantities of rain water to accumulate in the basin, the banks of which eroded and washed away causing the water collected to be cascaded upon the properties of the plaintiffs and without taking proper steps to providе for proper and adequate drainage of the surplus water.1 The State by its design and specifications for the highway which was being constructed under the supervision of the Highway Department resulted in diverting the water from former channels which had previously carried it to points beyond the plaintiffs’ properties. This conduct comes within the provisions of
Immunity from suit of all governmental entities is waived for any injury caused from a dangerous or defective condition of any public building, structure, dam, reservoir or other public improvement. Immunity is not waived for latent defective conditions.
It is a claim of the State that the plaintiffs’ action is barred by the provisions of
Immunity from suit of all governmental entities is waived for injury proximately caused by a negligent act or omissiоn of an employee committed within the scope of his employment except if the injury:
(1) arises out of the exercise or performance or the failure to exercise or perform a discretionary function, whether or not the discretion is abused, or . . .
The facts in this case do not bring it within the provisions of that section. The decision to build the highway and specifying its general location were discretionary functions, but the preparing of plans and specifications and the supervision of the manner in which the work was carried out cannot be labeled discretionary functions.
The defendants also claimed that the flooding of the plaintiffs’ properties resulted from an inevitable occurrence or an act of God. This issue was submittеd to the jury and the jury returned a finding against the defendants’ contentions.
We are of the opinion that evidence adequately supports the finding of the jury that the highway project of the State, including the storm drain system, was unnecessarily defective or dangerous. Action of the court entering judgment in favor of the plaintiffs and against the State is affirmed.
In respect to the claims of the plaintiffs against Salt Lake County, the jury returned the following findings: “Salt Lake County was negligent in failing to provide reasonable, adequate drainage facilities for the highway project.” The trial court declined to enter judgment against the County, and the plaintiffs have appealed from that ruling. We find no statutory duty on the part of the County to supply drainage facilities for the State highwаy project. Prior to the construction of the highway in question, the County had employed consulting engineers to study the problem of providing adequate storm sewers in the area. Based on the study of the consulting engineering firms, the County did construct a storm sewer system in the area which, until the occurrences here involved, was adequate to take care of the runoff from storms which hаd occurred on the slopes of Mt. Olympus above the proposed highway. The County by giving its permission to the State to empty the highway drainage system into the County‘s sewer would not create liability1 on the part of the County for the acts of the State or its contractor in failing to provide safeguards to prevent obstruction of the sewer system, nor was the County responsible for the action of the State in emptying a large conduit into the County‘s smaller conduit. In our review of the record we find no foundation for the assessment of liability upon the County. We are of the opinion that the action of the trial court in granting the motion of Salt Lake County for judgment notwithstanding the verdict was proper.
In dealing with the claims of the plaintiffs against Gibbons & Reed Company, the jury found that the contractor was negligent in failing to take reasonable precautions to protect the project during construction. They jury made further findings that Gibbons & Reed did not fail to take proper precautions to provide proper drainage during construction of the project; that Gibbons & Reed constructed the highway in conformance with the plans, sрecifications, and directions given it by the state of Utah. The jury further found that Gibbons & Reed did not negligently follow plans, specifications, and directions that were so obviously dangerous that no reasonable contractor would have followed them. The jury made the further finding that Gibbons & Reed was not negligent in failing to perform the work required by its contract with the state of Utah with that degree of skill and care ordinarily possessed and exercised by other contractors doing the same or similar work in this locality. Gibbons & Reed having performed its contract with the State in accordance with the plans, specifications, and directions given it by the State with a reasonable degree of skill, we find no basis upon which to find that the contractor was liable to the рlaintiffs.2 The action of the trial court in declining to enter judgment
In these proceedings the State filed a cross-complaint against Gibbons & Reed Company claiming that if the State is liable then it is entitled to a judgment over against Gibbons & Reed under the terms of the contract. The provisions of the contract relied on by the State are as follows:
The Contractor shall indemnify and sаve harmless the State, its officers, and employees, from all suits, actions, or claims of any character brought because of any injuries or damage received or sustained by any person, persons, or property on account of the operations of the said Contractor; or on account of or in consequence of any neglect in safeguаrding the work; . . . [Emphasis added.]
Another provision of the contract provides as follows:
The Contractor shall be responsible for all damage or injury to property of any character, during the prosecution of the work, resulting from any act, omission, neglect, or misconduct in his manner or method of execution of the work, or any time due to defective work or materials, and said responsibility will not be released until the project shall have been completed and accepted. The Contractor will not be responsible for damage to property due to design failure. [Emphasis added.]
In view of the jury‘s findings that the contractor carried out the work in a skillful manner and in accordance with the plans, specifications, and directions of the State, we are of the opinion that the State‘s claim that it is entitled to be indemnified is without basis. In this connection the State in answer to interrogatories submitted to it by Gibbons & Reed Company
The judgment of the court below is affirmed. No costs awarded.
HENRIOD, C. J., and ELLETT and CROCKETT, JJ., concur.
MAUGHAN, J., having disqualified himself, did not participate herein.
J. ROBERT BULLOCK, District Judge, filed dissenting opinion.
J. ROBERT BULLOCK, District Judge (dissenting):
I dissent upon the sole ground that plaintiffs ought to recover against the State under
In taking this position I recognize that the decisions of this court, unless overruled, preclude such result.1 However, I believe the law enunciated in those cases, to the extent that they deny the existence of a constitutional inverse condemnation right of action, independent of legislative enactments or executive grace, does not comport with the great weight of authority throughout the United States.3 For the reasons stated by Justice Wade in his dissent in the Fairclough case, and for the reasons advanced by plaintiffs in their briefs, in my opinion such cases should be reconsidered and overruled.
Private property shall not be taken or damaged for public use without just compensation. [Emphasis mine.]
The remedy which a property owner prosecutes to obtain compensation under a constitutional provision providing for payment of just compensation when his property has been taken or damages for public use is often referred to in the cases and legal periodicals as “inverse condemnation.” Such actions have also been called “reverse condemnation” an action or claim by reason of “de facto” or “сommon law taking“,4 or affirmative eminent domain. In such actions the owner whose property is taken or damaged for public use without the institution of a condemnation proceeding, himself takes the procedural initiative by bringing an action for damages.
My research indicates that at least 25 states have constitutional provisions similar to Utah‘s5 and all but three recognize and
J. ROBERT BULLOCK
DISTRICT JUDGE