This is a petition brought by the American Iron and Steel Institute and several individual steel companies to review regulations promulgated by the Administrator of the Environmental Protection Agency on June 28, 1974.
I
Petitioners’ first, and most basic, challenge is to the Administrator’s very power to promulgate nationwide single number effluent limitations for existing point sources.
Petitioners rely heavily on the fact that there is no section in the Act which explicitly authorizes the Administrator to establish single number effluent limi
In contrast to these sections, the only section explicitly authorizing the Administrator to establish any regulations pertaining to effluent standards for existing point sources — section 304(b) — merely authorizes the promulgation of “guidelines” rather than precise standards or single number limitations. While section 301(b) refers to “effluent limitations” for existing point sources, that section does not explicitly authorize the Administrator (or anyone else) to promulgate regulations establishing such limitations. Rather, using the passive voice, that section merely states that effluent limitations for such point sources “shall be achieved” by July 1, 1977 through the application of the “best practicable control technology currently available” (hereinafter, “BPCTCA”), and by July 1, 1983 through the application of the “best available technology economically achievable” (hereinafter, “BATEA”). Under petitioners’ construction of the Act, these effluent limitations are to be “achieved” through the permit process. They contend that the permit issuing authorities, under section 402, are to determine the effluent limitations to be achieved by applying, to individual point sources, the factors enumerated in the guidelines previously promulgated by the Administrator under section 304(b).
The two consolidated cases present graphic examples of the differing consequences of the two interpretations. Both Youngstown and CF&I contend that they have local problems which can be fully appreciated only by a local permit-issuing authority. Youngstown claims that its plants in the Mahoning Valley provide one third of the direct employment in that area and that they are indirectly responsible for a significant percentage of the remaining jobs. It also claims that its plants are very old (several were built before World War I), that many will be forced to close if the limitations promulgated by the Administrator are enforced, and that because of the heavy concentration of steel plants along the shores, the river is unavailable for recreational uses anyway. Youngstown claims that a local authority, in appreciation of these factors, might have required somewhat less stringent controls. CF&I points to a different problem. It contends that the installation of anti-pollution devices in its Colorado plants would cause a significant net loss of water through evaporation, which would have serious consequences in a state where water is a scarce and valuable resource. Contending that only a local authority would fully appreciate the impact of the anti-pollution devices on scarce water resources,
We acknowledge that these arguments are not without force, but we believe that the Administrator does have the authority to promulgate effluent limitations under section 301. While we admit that Congress did not express its intent
Perhaps the strongest indication in the Act that the Administrator has the power under section 301 to promulgate effluent limitations can be found in section 509(b)(1). This section provides for judicial review “of the Administrator’s action . . . (E) in approving or promulgating any effluent limitation or other limitation under section SOI . and (F) in issuing or denying any permit under section 402.” Not only does this section explicitly refer to the Administrator’s action in promulgating a section 301 effluent limitation, but its separate references, in subsections (E) and (F), to section 301 effluent limitations and section 402 permits indicates that the limitations and permits have independent significance.
The Eighth Circuit in CPC International discounted the importance of section 509(b)(1)(E) by contending that the section 301 limitation referred to must be one promulgated under section 301(c), which empowers the Administrator to “modify the requirements of subsection (b)(2)(A) of this section” with respect to an individual plant upon a stringent showing of hardship and good faith efforts at compliance. We cannot accept the Eighth Circuit’s reasoning on this point. In the first place, section 301(c) does pot authorize the Administrator to promulgate any effluent limitations. Rather, it merely authorizes him to relax the requirements of section 301(b) with respect to 1983 “BATEA” standards,
Petitioners attempt to explain away this redundancy by arguing that the separate references merely indicate that “the legislative draftsmen appreciated that a § 402 permit condition is not always an effluent limitation — it might be a monitoring or reporting requirement.” This contention fails to eliminate the redundancy, and it fails to explain why Congress did not consider it sufficient to include only a reference to a violation of a section 402 permit. While a permit may contain conditions other than section 301 limitations, petitioners’ position is that a section 301 limitation can only be established through the permit process. Thus, given the reference to violations of section 402 permits, any reference to violations of section 301 limitations would still be superfluous under petitioners’ view.
The Eighth Circuit in CPC International attempted to explain away the redundancy on a different ground. It viewed the independent reference to section 301 as being necessary to encompass section 301(f), which prohibits the discharge of radiological, chemical, or biological warfare agents and high-level radioactive wastes into navigable waters. However, section 301(f) is not an “effluent limitation,” but rather a flat prohibition on all such discharges. Section 301(b) is the part of section 301 which requires compliance with effluent limitations, and section 301(f) would seem to be a type of “other limitation” referred to in section 505(f)(2).
Section 401(a)(1)
“In the case of any such activity for which there is not an applicable effluent limitation or other limitation under sections 301(b) and 302, and there is not an applicable standard under sections 306 and 307, the States shall so certify . . . .”
This section, by requiring the State to certify the absence of a section 301 effluent limitation when someone has applied for a permit, seems to presuppose that section 301 limitations have an existence independent of the section 402 permits, and that they are generally expected to have been promulgated prior to the issuance of such permits.
There are a number of other sections in the Act which refer to the establishment of effluent limitations “under” or “pursuant to” section 301. While it is true that none of these sections specify how these limitations are to be established or who is expected to establish them, the repeated references to such limitations, when coupled with the complete absence of any qualification that such limitations are to be established through the permit process, is further support for the position that Congress intended the section 301(b) limitations to have an independent existence. If they are to have such an independent existence, it is reasonable for the Administrator to conclude that the promulgation of regulations establishing such limitations is within his inherent rule-making power.
Finally, we believe that a joint reading of sections 304 and' 301 lends support for the Administrator’s position and undercuts that of the petitioners. Sections 304(b)(1)(A) and 304(b)(2)(A) require that the Administrator’s regulations, which are to be applicable by the years 1977 and 1983, respectively, “identify the degree of effluent reduction attainable” through application of the best technology practicable or available. This meshes in very neatly with section 301(b), which requires the “achievement” of effluent limitations by those dates applying the same respective levels of technology. Reading the two sections together, it would seem inconsistent to require, on the one hand, both the achievement of effluent limitations applying certain levels of technology [section 301(b)] and the promulgation of regulations by the Administrator which “identify . . . the degree of effluent reduction attainable” through those levels of technology [section 304(b)], while at the same time allowing permit grantors to determine for themselves, bound only by section 304(b) guidelines, what levels of effluent limitation are to be achieved.
The Eighth Circuit in CPC International relied in part on the permit provisions of the Act, especially section 402(d)(2), which provides:
“No permit shall issue ... if the Administrator within ninety days of the date of transmittal of the proposed permit by the State objects in writing to the issuance of such permits as being outside the guidelines and requirements of this Act.”
The Eighth Circuit, emphasizing the phrase “as being outside the guidelines,” concluded that “[i]t is hard to imagine a
We also believe that a close reading of the legislative history supports the Administrator’s position. The Senate Report accompanying the bill stated:
“It is the Committee’s intention that pursuant to subsection 301(b)(1)(A), and Section 304(b) the Administrator will interpret the term ‘best practicable’ when applied to various categories of industries as a basis for specifying clear and precise effluent limitations to be implemented by January 1, 1976.”24
Virtually identical language was used by Senator Muskie, the principal author of the bill, in explaining the Report of the House-Senate Conference Committee.
Senator Bentsen, a member of the Senate Public Works Committee which drafted the bill, gave perhaps the clearest indication that Congress contemplated that the Administrator would establish section 301 limitations:
“In phase I, for point sources of pollutants, effluent limits shall be established not later than January 1, 1977 [now July 1, 1977], which comply with specifically defined levels of effluent controls and treatment. As defined in section 301(b)(1) of the bill, and as elaborated in the regulations which we anticipate the Administrator shall issue pursuant to section 301 and section 304, these 1976 [now 1977] goals shall be at least . . . the ‘best practicable control technology currently available’ for [industrial] point sources. ”26
The petitioners, as did the Eighth Circuit in CPC International, also rely on portions of the legislative history as support for their interpretation, but we believe that a close reading of the parts on which they rely does not contradict our analysis. Many of the statements indicating the need for flexibility, precise federal guidelines and a meaningful state role do not prove that the Administrator does not have the power to establish limitations under section 301. As we shall explain in greater detail in part II of this opinion, they merely indicate that the Administrator was empowered to promulgate guidelines in addition to limitations. Furthermore, some of the legislative history relied on by petitioners is ambiguous. One example is the following exchange between Senator Mathias and Senator Muskie:
“Mr. Mathias. Does section 301(b) (2)(A) on page 76 comtemplate that a State, or the Administrator if appropriate, might be able to set the 1981 [now 1983] effluent limitations almost on an individual point source by point source basis?
“Mr. Muskie. Section 301(b)(2)(A) as well as section 301(b)(1) anticipate individual application on point sources through the procedures under the permit program established under section 402.”27
The strongest statement in support of the view that effluent limitations were to be established, as well as applied, through the permit process appears in a letter from EPA Administrator William Ruckelshaus to Chairman Blatnik of the House Public Works Committee:
“Effluent limitations required by Section 301 would be established and applied to all point sources of discharges covered by the Act by means of permits issued under Title IV.”28
We believe that this statement should not be given great weight. This Act was predominantly a congressional product, with the Administration playing a relatively insignificant rule in its drafting, at least with respect to those parts of the Act at issue here. Consequently, we believe that the comments by the EPA Administrator reflecting his interpretation of then pending legislation should be given less weight in determining the meaning of the Act than statements by Senators such as Muskie and Bentsen who had a far greater responsibility for the Act’s drafting.
The Eighth Circuit in CPC International also relied heavily on the fact that several Representatives, principally Abzug and Rangel, were concerned about the lack of a federal veto power over the permit grantors in the early House version of the bill.
As a final point, we note that the Supreme Court has consistently stated that, where an Act of Congress is fairly susceptible of differing constructions, the interpretation made of it by the agency charged with its administration should be given considerable deference. Udall v. Tallman, 380 U.S. 1, 16-18, 85 S.Ct. 792, 13 L.Ed.2d 616 (1965); Power Reaction Co. v. Electricians, 367 U.S. 396, 408, 81 S.Ct. 1529, 6 L.Ed.2d 924 (1961); McLaren v. Fleischer, 256 U.S. 477, 480-81, 41 S.Ct. 577, 65 L.Ed. 1052 (1921). This position was most recently reiterated in Train v. NRDC, 421 U.S. 60, 87, 95 S.Ct. 1470, 43 L.Ed.2d 731 (1975), where the Supreme Court, in upholding the Administrator’s interpretation of section 110 of the Clean Air Act,
“We therefore conclude that the Agency’s interpretation of §§ 110(a)(3) and 110(f) was ‘correct’ to the extent that it can be said that any particular interpretation of a complex statute such as this is the ‘correct’ one. Given this conclusion, as well as the facts that the Agency is charged with administration of the Act, and that there has undoubtedly been reliance upon its interpretation by the States and other parties affected by the Act, we have no doubt whatever that its construction was sufficiently reasonable to preclude the Court of Appeals from substituting its judgment for that of the Agency.”
“Without going so far as to hold that the Agency’s construction of the Act was the only one it permissibly could have adopted, we conclude that it was at the very least sufficiently reasonable that it should have been acóepted by the reviewing courts.”31
For the reasons expressed earlier, we believe that the Administrator’s interpretation of this very complex Act — at least with respect to his power to promulgate effluent limitations under section 301 — is the more reasonable one, and should be given appropriate deference.
II
Having concluded that the Administrator does have the power to promulgate effluent limitations under section 301, we are now faced with the question of interpreting the nature of the Administrator’s powers and duties under section 304 and of reconciling our construction of section 304 with that of section 301. We begin by observing that the Administrator not only has the power, but the explicit obligation to promulgate “guidelines” under section 304. In these guidelines, the Administrator is specifically required (1) to “identify the degree of effluent reduction attainable through the application” of the relevant standard of technology [sections 301(b)(1)(A) and 301(b)(2)(A)], and (2) to “specify factors to be taken in to account in determining the control measures and practices to be applicable to point sources . . . within such categories or classes ” [section 304(b) (1) (B)]
Sections 304(b)(1)(B) and 304(b) (2) (B) also specify a number of factors to be taken into account in determining the control measures required for compliance with the respective 1977 and 1983 technological standards. These factors include cost, the age of the equipment and facilities involved, engineering aspects of application of various types of control techniques, and non-water quality environmental impact. The first question to address is who is to consider these factors — the Administrator in pro
The legislative history, however, indicates quite clearly that a full consideration of these factors at the permit-issuing stage was not intended. In Senator Muskie’s statement in support of the bill as approved by the House-Senate Conference Committee, he explained:
“The Conferees intend that the factors described in Section 304(b) be considered only within classes or categories of point sources and that such factors not be considered at the time of the application of an effluent limitation to an individual point source within such category or class.”34
Similarly, Representative Dingell, in discussing one of the factors (“cost”) enumerated in section 304(b), stated:
“The conference report emphasizes on page 121 a very important point. The report states:
‘The conferees intend that the Administrator or the State, as the case may be, will make the determination of the economic impact of an effluent limitation on the basis of classes and categories of point sources, as distinguished from a plant by plant determination.’
“Thus, a plant-by-plant determination of the economic impact of an effluent limitation is neither expected, nor desired, and, in fact, it should be avoided.”35
Nevertheless, it does appear that Congress contemplated that some degree of consideration of the enumerated factors was to be made by the permit grantors on a plant-by-plant basis. The Senate Report, after referring to the section 304(b) factors, stated:
“In applying effluent limitations to any individual plant, the factors cited above should be applied to that specific plant.”36
At first glance, this statement seems hard to reconcile with the previously quoted statements indicating that the factors were not to be considered on a plant-by-plant basis. We note, however, that the Senate Report just quoted said that the factors were to be “applied,” not that they were to be “considered.” We therefore believe that the statements quoted can be reconciled if we determine that any “consideration” to be given the specified factors by the permit grantors should be considerably less than de novo. Thus, it seems that the Administrator is to conduct the primary consideration of the enumerated factors for classes and categories and is to specify to the permit grantors how some variation in the standards should be made in light of those factors. In other words, the permit grantors are to have a limited and carefully circumscribed discretion to take into account factors as specified by the Administrator. To hold that they have no discretion does not make sense in light of the clear command in section 304(b)(1)(B) that the “guidelines” promulgated by the Administrator “specify
“Except as provided in Section 301(c) of the Act, the intent is that effluent limitations applicable to individual point sources be as uniform as possible. The Administrator is expected to be precise in his guidelines so as to assure that similar characteristics, regardless of their location or the nature of the water into which the discharge is made, will meet similar effluent limitations.”37
This indicates to us that, while uniformity was clearly a major congressional concern, some amount of local variation, carefully circumscribed by precise guidelines, was contemplated. In short, uniformity was to be achieved by effluent standards within a given category which were similar, rather than identical or unitary.
This conclusion is further buttressed by several indications in the legislative history that the guidelines were intended to provide permissible “ranges” of effluent limitations. With respect to the 1977 “BPCTCA” standards the Senate Report, for example, stated:
“The Administrator should establish the range of best practicable levels based upon the average of the best existing performance by plants of various sizes, ages, and unit processes within each industrial category.”39
With respect to the 1983 “BATEA” standards, the same Report continued:
“. . . [T]he Committee intends that effluent limitations be based upon application of best available technology as defined by the Administrator. In making the determination of ‘best available’ the Committee expects the Administrator to apply the same principles involved in making the determination of best practicable as outlined above except that rather than the range of levels established in reference to the average of the best performers in an industrial category the range should at a minimum be referenced to the best performer in any industrial category.”40
Similarly, Senator Muskie, in summarizing the bill as reported out of the House-Senate Conference, stated:
“The Administrator should establish the range of best practicable levels based upon the average of the best existing performance by plants of various sizes, ages, and unit processes within each industrial category.”41
Having concluded that the local permit-issuing authorities have a carefully circumscribed degree of discretion, as evidenced by Congress’ concern that the Administrator’s guidelines “specify factors to be taken into account” and that they provide “ranges,” we are then faced with the problem of reconciling this limited amount of discretion with out previous conclusion that the Administrator has the power to promulgate effluent limitations under section 301. The answer, in our view, lies in the fact that
“In defining best practicable for any given industrial category, the Committee expects the Administrator to take a number of factors into account. These factors should include the age of plants, their size and the unit processes involved and the cost of applying such controls. In effect, for any industrial category, the Committee expects the Administrator to define a range of discharge levels, above a certain base level applicable to all plants within that category. In applying effluent limitations to any individual plant, the factors cited above should be applied to that specific plant. In no case, however, should any plant be allowed to discharge more pollutants per unit of production than is defined by that base level.”42
In our view, the section 301(b) limitations represent a single number effluent limitation which prescribes the minimum amount of control (the “base level”), or conversely, the maximum amount of effluent discharge (a “ceiling”) that is permissible. In determining this “base level,” and concomitant pollutant ceiling, the Administrator is to consider the numerous differences in processes and capabilities of point sources.
Ill
We now turn to the regulations being challenged to see if they comply with our interpretation of the statutory scheme. It is immediately apparent that the regulations establish only single number effluent limitations for each of twelve subcategories within the iron and steel industry.
“The Agency considers that the limitations already represent ranges, taking into account differences in processes used and other factors. Subcategorization has been used to take these factors into account with different limitations for each subcategory. Within subcategories, exceptions to the limitations have been provided where appropriate, thus constituting a range. Each numerical limitation represents a maximum value over a given period of time. This, in effect, represents a range from zero up to the specific limitation.” 39 Fed.Reg. 24117 (comment # 25). '
We believe that this response is insufficient. We do not agree that the “exceptions” referred to satisfy the “range” requirement, since only one of the twelve subcategories — By-Product Coke —contains any such exception. The statement that a range exists from zero up to the limitation is unsupportable since for all of the subcategories the Administrator concluded, with respect to the new source standards, that a “zero discharge” level was not feasible at this time. Thus, the “range” admittedly encompasses standards that cannot be met. More important, the regulations provide absolutely no guidance to the permit-issuing authorities as to what factors to consider or how to set the particular discharge level within a feasible range below the ceiling established under Section 301(b). Finally, we disagree with the Administrator’s contention that “sub-categorization” provides a range. The Administrator’s subeategorization merely divided the entire iron and steel making industry by means of the types of processes employed, and it does not reflect any of the innumerable differences within the particular subcategories. No guidance is given with respect to the remaining section 304(b) factors, such as age, costs and engineering aspects, which we previously concluded must be “specified” in order to guide the permit grantors in exercising their carefully circumscribed discretion in setting precise standards for individual point sources.
The Administrator contends that sufficient flexibility in the regulations is provided through the “variance” procedure, which allows individual discharges to obtain variances from the limitations upon a showing that the factors relevant to a particular point source are “fundamentally different from the factors considered in the establishment of the guidelines.” Our responsibility, however, is not to determine whether the Administrator has provided for flexibility, but whether he has followed the statutory scheme established by Congress. Regardless of whether the establishment of a variance procedure is within the Administrator’s discretion, we do not believe that the Administrator can ignore his obligation to promulgate guidelines specifying factors* to be considered and ranges above a base level. We also note that the variance procedure provides for less flexibility than we believe Congress contemplated, since it permits deviations from otherwise rigid and unitary limitations only where the circumstances of the particular plant are “fundamentally different” than those from which the effluent limitation was derived.
Having concluded that the regulations failed to constitute valid “guidelines” (despite their title), since they failed to provide meaningful ranges or guidance in considering individual factors, the question then arises as to the scope of our remand. Should we merely remand for promulgation of guidelines, leaving the single number limitations intact, or should we also remand for reconsideration of the limitations? We conclude that the latter approach is preferable. The guidelines can serve a meaningful purpose under our analysis only if they are coupled with limitations which represent the “ceiling” or maximum degree of effluent discharge permissible. In promulgating these regulations, the Administrator appears to have considered it his duty to establish uniform nationwide limitations, rather than es
IV
Petitioners raise several other contentions with respect to the process by which the Administrator determined the 1977 “BPCTCA” and 1983 “BATEA” standards in his regulations. As noted in part II of this opinion, we believe it was clearly Congress’ intent, despite the ambiguous wording in section 304(b), that the Administrator consider the enumerated factors in setting standards for classes and categories of industries. Petitioners contend that the Administrator failed to give sufficient consideration to these factors or to articulate his reasoning with sufficient clarity.
At the outset, it is important for us to articulate our standard of review. As in other cases involving review of an administrative agency’s rule-making actions we are governed by an “abuse of discretion” standard — in other words, we must not substitute our judgment for that of the agency, but must determine whether the Administrator’s actions were “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” Administrative Procedure Act § 10(e), 5 U.S.C. § 706(2); Citizens to Preserve Overton Park v. Volpe, 401 U.S. 402, 416, 91 S.Ct. 814, 28 L.Ed.2d 136 (1971); Delaware Citizens for Clean Air, Inc. v. Administrator, 480 F.2d 972, 975-76 (3d Cir. 1973). In order to facilitate meaningful judicial review, we should require administrative agencies to “articulate the standards and principles that govern their discretionary decisions in as much detail as possible.” Environmental Defense Fund, Inc. v. Ruckelshaus, 142 U.S.App.D.C. 74, 439 F.2d 584, 598 (1971). See also Greater Boston Television Corp. v. FCC, 143 U.S.App.D.C. 383, 444 F.2d 841, 851 (1970), cert. denied, 403 U.S. 923, 91 S.Ct. 2229, 29 L.Ed.2d 701 (1971). However, we should not reverse an agency’s decision that is not fully articulated where we can reasonably discern the basis for the agency’s action. Bowman Transportation, Inc. v. Arkansas — Best Freight System, Inc., 419 U.S. 281, 286, 95 S.Ct. 438, 42 L.Ed.2d 447 (1974). Furthermore, the Administrator’s conduct is entitled to a “presumption of regularity.” Citizens to Preserve Overton Park, supra, 401 U.S. at 415, 91 S.Ct. 814.
A. “Age.” — The first factor enumerated in section 304(b) which petitioners contend the Administrator did not fully consider was that of “age.” Petitioners contend that the Administrator, faced with the statutory mandate to consider age, concluded that age was not relevant. However, this inaccurately states
“The Agency has subdivided the steel making segment primarily along operational lines because the waste water volumes and pollutant parameters vary with the type of operation being conducted. In addition, the processes reflect the age of the technology employed. Subcategorization of coke making by the older beehive and the newer by-product operations and steel making by the older open hearth and the newer basic oxygen and electric arc furnace operations is indirectly subcategorization by age.
“The treatment technology to be applied is primarily a function of the' pollutants present and hence is a function of the type of operation conducted. The type of pollutants present is not a function of the size or age of the operating facilities. Land availability for application of the treatment technology is not a function of size or age since many new as well as old mills are limited on the area available for installation of treatment facilities and vice versa . . . Many of the older mills have better treatment than some of the newer ones and vice versa.” 39 Fed.Reg. at 24116, comment # 16 (emphasis added).
We believe that this quotation shows that the Administrator did consider age and did sufficiently articulate his reasoning, to the extent that he concluded that age was not by itself relevant to the type of treatment technology or processes to be installed, and that.'separate and explicit categorization by age was not warranted. We further believe, after examining the data in the Final Development Document, that the Administrator’s conclusions in this respect are fully supportable. Where we believe the Administrator erred, however, was in his failure to consider age as it had a bearing on the cost or feasibility of retrofitting plants. While all the plants in a certain older subcategory (e. g., beehive coke) may require the same technological processes to reduce effluent discharges, the fact that all the plants within that subcategory were built long before plants in another subcategory may present special problems in installing anti-pollution devices. Similarly, in a subcategory where there is considerable variation in age, the fact that the processes are similar may mean that the same type of control technology can be installed, but it does not necessarily mean that the ease with which that technology can be installed, or the ability to comply with effluent limitations once it has been installed, is not affected by age. Since we see no evidence that the Administrator considered age in this light, remand is appropriate. If he concludes on remand that age is not relevant to the cost or feasibility of retrofitting plans, as well as to the processes and treatment system, that conclusion will be valid to the extent it is supported by the record.
B. “Engineering Aspects. ” — Petitioners raise several points here in contending that the Administrator did not sufficiently consider this factor. They contend, inter alia, that for several subcategories the Administrator has suggested technology which is not currently available; that virtually all of the limitations are based on reduced flow rates which have not been demonstrated; and that many of the limitations are based on transfer technologies but lack guidelines on the engineering requirements for such transfers. Instead of considering these points as they affect the regulations in their entirety, we will defer any consideration of them until part VII of
The only contention we shall consider here is that in each of two subcategories — vacuum degassing and continuous casting — the Administrator surveyed only two plants which were not representative of the subcategories as a whole. In particular, they contend that the plants surveyed were built on “green field sites,” which enabled them to construct large lagoons for the treatment of waste materials, and that the treatment systems were built simultaneously with the production facilities, thereby making it easier for them to meet effluent limitations than plants which must be retrofitted. The Administrator’s response to petitioner’s challenge is that given the extraordinary complexity of promulgating uniform guidelines and limitations, he cannot be expected to consider all the engineering factors in specific situations. He further contends that, to the extent that a particular plant’s inability to comply with an effluent limitation is attributable to the fact that it is operating under conditions “fundamentally different” than the surveyed plants, it could obtain a variance. Petitioners in support of their challenge have failed to document their assertions that reliance on studies of plants with “unrepresentative” engineering characteristics has resulted in unrealistic limitations. They refer to no record deficiency that would overcome a presumption of regularity in the Administrator’s conduct. Accordingly we are convinced that the regulations cannot be declared arbitrary or capricious on this ground.
C. “Non-water quality environmental impact (including energy requirements).” — Petitioners contend that there is no evidence in the record to indicate that the Administrator considered these factors. We disagree, however, and believe that the Final Development Doeument accompanying the regulations (especially section VIII of the Document, found in Appendix at 1522a — 1581a) clearly shows that he did consider them in some detail. For each category, and for each level of technology (1977 “BPCTCA” and 1983 “BATEA” standards), the Administrator considered both the problems of air pollution and solid waste disposal, as well as the problem of additional energy requirements caused by installation of the necessary anti-pollution devices. In the by-product coke subcategory, for example, the Document identified the types of air pollution emissions likely to occur and concluded that “[i]f a vapor recirculation or solvent extraction facility for dephenolization is added to the system, significant reductions in both parameters are achieved.” (Appendix at 1534a). Similarly, the Document identified the solid wastes likely to be generated by treatment systems, and concluded that they could either be internally consumed through reuse in the mill, incinerated, or used as landfill (Id.). With respect to additional energy requirements, the Document estimated the additional annual operating costs in terms of power for each of the two treatment alternatives — $2,175.00 for alternative I, and $31,500.00 for alternative II (Appendix at 1523a). The Administrator then evaluated the overall impact of the limitations on air quality, solid waste problems and energy requirements for all subcategories (Appendix at 1583a — 1584a, 1629a and 1630a), and concluded that “[t]he enhancement of water quality management provided by these proposed effluent limitations substantially outweighs the impact on air, solid waste, and energy requirements” (Appendix at 1584a). Given the failure of petitioners to present contrary evidence as to the effects of the limitations in these areas,
D. “Costs. ” — The final factor which petitioners contend the Administrator did not sufficiently consider was that of “costs.” We have already concluded that the Administrator did not sufficiently consider the problem of age as it pertained to the cost and feasibility of retrofitting existing plants, and our present discussion of the cost factor will not repeat what was said previously. Our first task here is to clarify what Congress intended when it directed the Administrator to take costs into account. It is immediately apparent that Congress contemplated that the Administrator should give greater consideration to the cost of compliance when defining 1977 “BPCTCA” technology levels than he should when defining the 1983 “BATEA” levels. Section 304(b)(1)(B), states that the factors relating to an assessment of “BPCTA” “shall include consideration of the total cost of application of technology in relation to the effluent reduction benefits to be achieved from such application.” This is in contrast to section 304(b)(2)(B), which merely requires that the assessment of the factors “shall take into account . . the cost of achieving such effluent reduction.”
Nevertheless, while costs were intended to be given greater weight in defining “BPCTCA”, it is clear that even with that 1977 standard, the cost of compliance was not a factor to be given primary importance. Furthermore, Congress clearly intended that the Administrator consider costs on a class or category basis, rather than as a plant-by-plant basis. As Senator Muskie stated in support of the House-Senate Conference Committee Report:
“The modificátion of subsection 304(b)(1) is intended to clarify what is meant by the term ‘practicable.’ The balancing test between total cost and effluent reduction benefits is intended to limit the application of technology only where the additional degree of effluent reduction is wholly out of proportion to the costs of achieving such marginal level of reduction for any class or category of sources.
“The Conferees agreed upon this limited cost-benefit analysis in order to maintain uniformity within a class and category of point sources subject to effluent limitations and to avoid imposing on the Administrator any requirement to consider the location of sources within a category or to ascertain water quality impact of effluent controls, or to determine the economic impact of controls on any individual plant in a single community.”50
With respect to the 1983 “BATEA” standards, Senator Muskie intended that the type of assessment should be basically the same, except that there should be no cost-benefit analysis. Although there is some ambiguity as to precisely how much weight should be given to cost, it seems that the Administrator would be governed by a standard of “reasonableness”:
“In making the determination of ‘best available’ for a category or class, the Administrator is intended to apply the same principles involved in making the determination of ‘best practicable’ (outlined above), except as to cost-benefit analysis .
“While cost should be a factor in the Administrator’s judgment, no balancing test will be required. The Administrator will be bound by a test of reasonableness. In this case, the reasonableness of what is ‘economically achievable’ should reflect an evaluation of what needs to be done to move toward the elimination of the discharge of pollutants and what is*1052 achievable through the application of available technology — without regard to cost.”51
With respect to the overall impact of the legislation, Congress clearly contemplated that cleaning up the nation’s waters might necessitate the closing of some marginal plants. As Senator Bentsen stated:
“There is no doubt that we will suffer some disruption in our economy because of our efforts; many marginal plants may be forced to close.”52
In sum, while it is clear that the Administrator must consider cost, some amount of economic disruption was contemplated as a necessary price to pay in the effort to clean up the nation’s waters, and the Administrator was given considerable discretion in weighing costs.
With these expressions of legislative, intent in mind, we turn to consider the specific points raised by petitioners. Their contentions are essentially twofold: (1) that the Administrator’s consideration of costs was insufficient and incomplete, in part because he excluded certain cost factors and because his promulgation of regulations for only “primary” (or “phase I”) operations
With respect to the first contention, we believe it is clear that the Administrator did consider the cost impact of the regulations. The EPA contractor developed operating and capital cost estimates for each level of technology within each subcategory, and cost-benefit diagrams were prepared for each subcategory.
“The Agency believes that the benefits of thus reducing the pollutants discharged justify the associated costs, which though substantial in absolute terms, represent a relatively small percentage of the total capital investment in the industry.”55
Given our standard of review of agency action and the relative weights we believe Congress intended the Administrator to assign as between the need for pollution abatement and costs, we conclude that this assessment, when coupled with the economic impact analysis to be discussed below, was neither arbitrary nor capricious.
A troublesome question is presented by petitioners’ contention that the costs estimated by the Administrator were artificially low because certain factors were excluded. Petitioners point to the fact that the Final Development Document listed several factors which admittedly affected costs, but which were excluded from the cost analysis. Petitioners contend that these factors, which include such things as land acquisition and site clearance costs, generate costs which are as large as those which the Administrator included in his estimates. However, petitioners have pointed to no data which would support their allegation as to the magnitude of these excluded costs. factors.
Petitioners’ chief objection here is that since regulations for only primary (or phase I) operations were promulgated, no cost consideration was given to the impact of the yet-to-be-promulgated regulations for secondary operations. The “Kearney Report” estimated that those costs would be very substantial, and that the total water pollution-control costs would be three to five times as high as those for primary operations (Appendix at 214a, 314a). However, we believe that the Administrator acted within the permissible scope of his discretion in dividing the steel industry into two phases. Nothing in the Act precludes him from doing so,
Nevertheless, we are concerned that the Administrator be required at some point to assess the overall impact of his regulations in both phases. Otherwise, it is possible that the Administrator might consider the costs reasonable for each phase separately, without ever considering whether the aggregate costs on a particular industry warrant such strict standards. We thus believe that the competing interests can best be served by requiring the Administrator, when he promulgates the phase II regulations, to evaluate the total costs involved for those regulations as well as for phase I regulations.
Turning to petitioners’ other main contention, we are satisfied that the Administrator considered the problem of the industry’s capability of meeting these costs, and we cannot say that his conclusion was arbitrary or capricious. Petitioners rely heavily on the “Kearney Report,” which was commissioned and adopted by the EPA.
“Generally, it cannot be stated that the problems and costs of pollution control are the only, or even the principal reasons for the potential curtailments of closures of these plants. They have had a history of problems and were considered marginal operations before the impact of pollution control was felt. Rather it can be stated that pollution control is the final blow, like the ‘straw that broke the camel’s back.’ It is entirely probable that some of those plants would ultimately have been partially or entirely close, even without pollution control requirements . . . ” Appendix at 305a.
The Report further stated that, on the basis of past experience, it was probable that a significant number of laid off workers (roughly 50%) would be rehired at other plants within the industry. (Appendix at 307a).
Petitioners also rely on another report (the “Booz, Allen Report”) as well as on the Kearney Report as support of their contention that they could not raise the necessary capital to finance the expenditure. However, both reports relied in part on the fact that the steel industry at the time was under price controls (Appendix at 258a, 284a, 349a). Subsequent to the publication of
Youngstown makes a special appeal based on the allegedly disproportionate impact that enforcement of the regulations would have on its plant and on the surrounding community in the Mahoning Valley. However, as the quotation in text accompanying footnote 50 indicates, the Administrator is not required “to consider the location of sources within a category.” Furthermore, the “Ernst and Ernst Report,” which was primarily concerned with the impact in the Mahoning Valley of more stringent water quality standards,
V
In this portion of the opinion, we shall discuss several other contentions raised by petitioners which pertain to alleged deficiencies in the process of estab
We believe that these objections have merit. While we do not think it practical or necessary at this stage to require the recalculation of the limitations to place them all in a net basis, we believe that any individual point source should be entitled to an adjustment in an effluent limitation applicable to it if it can show that its inability to meet the limitation is attributable to significant amounts of pollutants in the intake water. Such an adjustment would seem required by due process, since without it a plant could be subjected to heavy penalties because of circumstances beyond its control. Furthermore, such a plant may risk incurring penalties even though it had installed precisely the same pollution abatement equipment as another plant which, because its intake waters were cleaner, could meet the limitation and thus avoid any fines.
The Administrator has recognized this problem and has proposed regulations specifying those situations in which the Regional Director “may” allow a credit for pollutants already present in the intake waters.
Petitioners’ remaining contentions are without merit. They first contend that the regulations are arbitrary and capricious because the “variance” procedure has not yet been established. It is clear, however, that the Administrator did introduce into the regulations for each subcategory a provision which would allow the permit issuers to modify the effluent limitation applicable to a particular point source upon a showing that the factors relating to that source’s ability to comply with the limitations are “fundamentally different from the factors considered in the establishment of the guidelines.” Petitioners nevertheless claim that because the Administrator subsequently requested public comment on how the váriance provision should be applied and interpreted,
Petitioners also argue that the Administrator erred in failing to establish the monthly average of effluent loads permissible on a long-term (preferably, a yearly) basis. While conceding that the regulations permit a daily variation of up to three times the monthly average, petitioners contend that the failure to premise a monthly average on a long-term basis does not sufficiently recognize the possibility of monthly variations in effluent discharges that are bound to occur even with the best technology. However, we do not see how the failure to establish a monthly average in this fashion constitutes an abuse of discretion, especially considering the statutory time constraints on the Administrator which would have precluded a year-long sampling effort.
Finally, we reject petitioners’ contention that the regulations are invalid because the Administrator failed to use an adequate data base from which to promulgate them. Given the Administrator’s clear mandate to press the development of technology,
VI
Thus far, we have been addressing petitioners’ various contentions pertaining to the Administrator’s promulgation of regulations for existing point sources under sections 301 and 304 of the Act. In this section we shall consider petitioners’ challenge to the Administrator’s interpretation of his power to promulgate effluent limitations for new point sources under section 306. As noted previously,
The Act refers to three distinct levels of technology which must be attained. For existing sources, the standard to be applicable in 1977 is the “best practicable control technology currently available,” or “BPCTCA.” The 1983 standard for existing sources is the “best available technology economically achievable,” or “BATEA.” The standard applicable to new sources is the “best available demonstrated control technology,” or “BADCT.” It is unquestioned that the 1977 “BPCTCA” is the least stringent of the three. The dispute focuses on the relative degree of stringency between the 1983 “BATEA” standards and the
We reject petitioners’ contention that it was necessarily error for the Administrator to equate the two standards. While it is true that the new source standards, unlike the 1983 standards for existing sources, must be based on technology whose present availability is “demonstrated,” it is clear that Congress did not intend by that phrase to limit the technology to that which is widely in use. As the House Report stated:
“It will be sufficient, for the purpose of setting the level of control under available technology, that there be one operating facility which demonstrates that the level can be achieved or that there is sufficient information and data from a relevant pilot plant or semi-work plant to provide the needed economic and technical justification for such new source.”69
Furthermore, Congress was clearly appreciative of the fact that the most effective and least expensive approach to water pollution would be to prevent new water pollution problems by requiring “maximum feasible control of new sources, at the time of their construction.”
“In section 306, the Committee recognizes two of the most significant factors in the attainment of clean water. These factors are (1) the need to preclude the construction of new sources or the modification of existing sources which use less than the best available control technology for the reduction or elimination of the discharge of pollutants, and (2) the recognition of the significantly lower expense of attaining a given level of effluent control in a new facility as compared to the future cost of retrofitting a facility to meet stringent water pollution control measures.”71
This awareness of the lower costs that would be incurred by new sources led Congress to require that less weight be given to costs under section 306 than under section 304. As Senator Muskie stated with reference to the Administrator’s requirement to consider costs under section 306:
“The Conferees would expect that this cost test would be considerably more restrictive than the test which would be applied to ‘best available technology’ because pollution control alternatives are available to a new source which are not available to existing sources.”72
In sum, given Congress’ clearly expressed belief that it would be easier for new sources to attain a particular level of effluent control than it would be for existing sources, and given the fact that the Administrator was permitted to rely on pilot projects (or “transfer tech
Petitioners also contend that the Administrator failed to consider factors which section 306 required him to consider in establishing new source standards. These factors are basically the same as those which must be considered under section 304, with one obvious and notable exception — the factor of age. Since we concluded in part IV of this opinion that age was the only factor that the Administrator did not sufficiently consider,
VII
In this section of the opinion we consider petitioners” arguments that the specific limitations for both new and existing point sources are too stringent. It is first necessary to explain how our consideration of these contentions is affected by our earlier discussion. With respect to the new source standards promulgated under section 306, we found no error in the process by which those stan
With respect to the existing source standards, we have previously indicated that, in addition to the necessity to promulgate regulations pertaining to credits where the intake waters are polluted, remand is necessary to promulgate guidelines under section 304, to reconsider the limitations in light of the “base level” and “ceiling” concepts and to consider more fully the factor of age. See parts III and IV(A) of this opinion. In many cases, it might be preferable to defer considering the technological challenges to existing source limitations until the proceedings on remand are completed, since the limitations might be relaxed somewhat in light of the “base level” and “ceiling” concepts. We believe, however, that it is appropriate to consider them now. As a matter of judicial economy, and given Congress’ desire to move expeditiously in attacking the problems of water pollution, we do not think it would be advisable to postpone consideration of the technological challenges until the remand proceedings are completed several months hence. Furthermore, we note that the challenges to the 1977 “BPCTCA” levels of technology are very few in number, and the challenges to the 1983 “BATEA” standards are of a general rather than specific nature. Finally, we note that under petitioners’ own construction of the statute, any limitation which is sufficiently “demonstrated” to be a valid new source standard must also be a valid 1983 “BA-TEA” limitation. Thus, our consideration of the technological challenges to the new source standards (which we must make) will necessarily have considerable bearing on the validity of the 1983 “BATEA” standards. We emphasize, however, that our holding that whether limitations have been sufficiently demonstrated for purposes of “BA-TEA” and “BPCTCA” standards merely means that those limitations represent achievable points within a feasible range and that the Administrator must not automatically assume that the present limitations can represent permissible “ceilings.”
A: The 1977 “BPCTCA” Limitations
Petitioners challenge the 1977 limitations with respect to only two subcategories: by-product coke and sintering. They make two points regarding the by-product coke limitations. First, they contend that an effluent “flow rate”
Petitioners’ second point is that the 1977 limitations regarding ammonia discharge from by-product coke plants are without support. Petitioners contend that use of a bio-oxidation facility as recommended by the Administrator will actually increase the amount of ammonia in the effluent. However, biological treatment is only one of two alternative treatment systems. Two of the other plants surveyed which used the other treatment alternative (one which provides for physical and chemical treatment) achieved the effluent limitation. So long as the limitation can be achieved through the use of one of the alternatives, it is valid. Furthermore, even in the one plant using the bio-oxidation process, ammonia was removed from the waste water at a rate of 28.8% (Appendix at 1469a), thus undercutting petitioners’ claim that the process increased ammonia discharge. While that removal rate was not sufficient to meet the 1977 “BPCTCA” limitation, the Administrator noted that the plant “was not employing the ammonia removal step ahead of the biological system as proposed in the treatment schematic.”
Petitioners' challenge to limits in the sintering subcategory is based on the fact that the sampled plants had a wet cleaning system only on the “deduster” end, whereas the limitations were applicable to sintering plants with wet cleaning systems on both the “deduster” and the “wind-box.” They therefore contend that the limitations were based on unrepresentative plants and were thus too restrictive. The Administrator responds by claiming that any sinter plant with wet systems on both ends can obtain a variance under 40 C.F.R. § 430.32 on the ground that such plants operate under conditions “fundamentally different” than the tested plants. This response is satisfactory to us and would appear to fully meet petitioners’ objection.
B: The 1983 “BATEA” Limitations
As noted previously, petitioners’ objections to the 1983 “BATEA.” standards are very general. Essentially, they repeat their allegations with respect to the new source standards, which are discussed in part VII(C) of this opinion. They also contend that reliance on transfer technology was improper. However, given the Act’s mandate to the Administrator to press the development of technology,
“The distinction between ‘best practicable’ and ‘best available’ is intended to reflect the need to press toward increasingly higher levels of control in six-year stages. Through the research and development of new processes, modifications, replacement of obsolete plans and processes, and new improvements in technology, it is anticipated that it should be possible, taking into account the cost of controls, to achieve by 1983 levels of control which approach and achieve the elimination of the discharge of pollutants.”78
Furthermore, since we have concluded that reliance on pilot plant technology was proper in establishing limitations for new sources, it should also be proper in establishing 1983 “BATEA” limitations for existing sources.
Finally, petitioners contend that because the 1983 standards are not to be applicable for another eight years and because they were published under severe time pressures and were based on
C: The New Source Standards
1. Flow Rates. — Petitioners first challenge the 100 gallon per ton flow rate for new by-product coke plants. As noted previously, we are satisfied that the Administrator did not act arbitrarily and capriciously in using a 175 gallon per ton flow rate for 1977 “BPCTCA” limitations in the by-product coke subcategory. However, we agree with petitioners that a 100 gallon per ton flow rate has not been “demonstrated.” None of the sampled plants achieved such a flow rate, and the Administrator has not pointed to any transfer technology indicating that such a flow rate is achievable for by-product coke. The Administrator instead relies on the Koppers Report, claiming that the Report’s recommendation supports a 100 gallon per ton rate. The Koppers Report, however, merely makes a recommendation, and even that is for a 300 gallon per ton rate. Even if the Administrator is correct in saying that a 1:1 dilution is not necessary and that certain effluents were improperly included in the Koppers Report, we do not believe that the “recommendation” there can satisfy the requirement in section 306 that the technology be “demonstrated.” We see no evidence in the record that an actual plant — pilot project or otherwise — has achieved a 100 gallon per ton flow rate. Thus, the new source standards for byproduct coke should be reconsidered in light of a new and “demonstrated” flow rate.
Petitioners also contend that the flow rates for the sintering, blast furnace, basic oxygen furnace (“BOF”) and continuous casting subcategories were not supported by the record. Petitioners contend that the flow rates have not been demonstrated, but were based on the Administrator’s belief as to the viability of “recycle systems.” Petitioners contend that such systems are not viable because of problems of plugging, scaling and corrosion. While the evidence in the record as to the severity of the plugging and scaling problem is quite sketchy, we believe that petitioners have raised a valid point and that remand is appropriate for further consideration of this problem. In the sintering subcategory, for example, the “BATEA” and “BADCT” flow rates were set at 50 gallons a ton, but the only plant on which full data were obtained (Plant J, which already used a recycle system) had a flow rate of 114 gallons per ton. In the Final Development Document, the Administrator concluded that this figure was “excessive” and could be reduced by more than 50 per cent simply by “tightening up the recycle loop.” However, he then noted: “In doing this, more attention may have to be paid to control of heat buildup and scaling and/or corrosive conditions in the recycle systems.”
The Administrator also relies on the results obtained from Plant “V,” another BOF plant, which allegedly attained a flow rate of 33 gallons per ton
We thus believe that there are a number of serious questions concerning the viability of recycle systems as they pertain to the sintering and BOF subcategories. With respect to the blast furnace and continuous casting subcategories, we are satisfied from the record that the “BATEA” and “BADCT” flow rates of 125 gallons per ton were demonstrated,
Petitioners’ challenge to the alkaline chlorination process is basically two-fold: that it has never been demonstrated on by-product coke wastes, and that the chlorination process gives off chlorinated organics which are potentially more dangerous than the pollutants sought to be removed. With respect to the first point, the Administrator relied on transfer technology from other industries (particularly the electroplating and water treating industries),
With respect to the problem created by chlorinated organics, the Administrator responds that the addition of the carbon adsorption process after chlorination was prescribed specifically to remove such chlorinated organics. Furthermore, carbon adsorption has been applied on a large-scale basis in the petroleum industry for years,
Petitioners’ next challenge is to the “BATEA” and “BADCT” limitations for suspended solids in the continuous casting subcategory. However, an examination of the record shows that one plant (Plant “AE”) clearly achieved the limitations. Petitioners contend that the results from that plant are not achieved on a continuous basis and thus did not reflect the varying characteristics of the intake waters. We have already held, however, that the Administrator must make a provision in the regulations which entitles a point source to a credit when it shows that its inability to meet an effluent limitation is attributable to substances in the intake waters. See part V of this opinion. We believe that such a provision would meet petitioners’ objection to this limitation and would protect them from the imposition of penalties because of circumstances beyond their control.
Petitioners also challenge the “BATEA” and “BADCT” suspended solid limitations for the BOF and vacuum degassing subcategories, contending that
Finally, petitioners challenge the 20 mg/1 fluoride limitation for the BOF subcategory. The one BOF plant studied had what was equivalent to a 63 mg/1 fluoride discharge.
In addition to challenging the above limitations as not being demonstrated, petitioners contend that no justification has been given for the 20 mg/1 fluoride limitation in the sintering, blast furnace, BOF, open hearth and electric arc subcategories, or for the 5 mg/1 zinc limitation in the open hearth, electric arc and . vacuum degassing subcategories. However, it appears that these two elements were both present in the discharge of existing plants in those subcategories, and thus it was reasonable to assume that they would also be present in the discharge of new sources using the same raw materials. The Final Development Document also discusses the adverse environmental impact of fluoride and zinc.
VIII
Accordingly, the matter will be remanded to the Environmental Protection Agency for further proceedings consistent with this opinion.
ADDENDUM
Relevant parts of the Federal Water Pollution Control Act Amendments of 1972, 86 Stat. 816, 33 U.S.C. § 1251, et seq. [Those portions which are of special importance have been italicized for emphasis.]
SECTION 101
§ 1251. Congressional declaration of goals and policy.
(a) The objective of this chapter is to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters. In order to achieve this objective it is hereby declared that, consistent with the provisions of this chapter—
(1) it is the national goal that the discharge of pollutants into the navigable waters be eliminated by 1985;
(2) it is the national goal that wherever attainable, an interim goal of water quality which provides for the protection and propagation of fish, shellfish, and wildlife and provides for recreation in and on the water be achieved by July 1, 1983;
(3) it is the national policy that the discharge of toxic pollutants in toxic amounts be prohibited;
(4) it is the national policy that Federal financial assistance be provided to construct publicly owned waste treatment works;
(5) it is the national policy that area-wide waste treatment management planning processes be developed and implemented to assure adequate control of sources of pollutants in each State; and
(6) it is the national policy that a major research and demonstration effort be made to develop technology necessary to eliminate the discharge of pollutants into the navigable waters, waters of the contiguous zone, and the oceans.
(b) It is the policy of the Congress to recognize, preserve, and protect the primary responsibilities and rights of States to prevent, reduce, and eliminate pollution, to plan the development and use (including restoration, preservation, and enhancement) of land and water resources, and to consult with the Administrator in the exercise of his authority under this chapter. It is further the policy of the Congress to support and aid research relating to the prevention, reduction, and elimination of pollution and to provide Federal technical services and financial aid to State and interstate agencies arid municipalities in connection with the prevention, reduction, and elimination of pollution.
******
SECTION 301
§ 1311. Effluent limitations.
(a) Illegality of pollutant discharges except in compliance with law.
Except as in compliance with this section and sections 1312, 1316, 1317, 1328, 1342, and 1344 of this title, the discharge of any pollutant by any person shall be unlawful.
(b) Timetable for achievement of objectives.
In order to carry out the objective of this chapter there shall be achieved—
(1)(A) not later than July 1, 1977, effluent limitations for point sources, other than publicly owned treatment works, (i) which shall require the application of the best practicable control technology currently available as defined by the Administrator pursuant to section 1314(b) of this title, or (ii) in the case of a discharge into a publicly*1067 owned treatment works which meets the requirements of subparagraph (B) of this paragraph, which shall require compliance with any applicable pretreatment requirements and any requirements under section 1317 of this title; and
(B) for publicly owned treatment works in existence on July 1, 1977, or approved pursuant to section 1283 of this title prior to June 30, 1974 (for which construction must be completed within four years of approval), effluent limitations based upon secondary treatment as defined by the Administrator pursuant to section 1314(d)(1) of this title; or,
(C) not later than July 1, 1977, any more stringent limitation, including those necessary to meet water quality standards, treatment standards, or schedules of compliance, established pursuant to any State law or regulations (under authority preserved by section 1370 of this title) or any other Federal law or regulation, or required to implement any applicable water quality standard established pursuant to this chapter.
(2)(A) not later than July 1, 1983, effluent limitations for categories and classes of point sources, other than publicly owned treatment works, which (i) shall require application of the best available technology economically achievable for such category or class, which will result in reasonable further progress toward the national goal of eliminating the discharge of all pollutants, as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(2) of this title, which such effluent limitations shall require the elimination of discharges of all pollutants if the Administrator finds, on the basis of information available to him (including information developed pursuant to section 1325 of this title), that such elimination is technologically and economically achievable for a category or class of point sources as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b)(2) of this title, or (ii) in the case of the introduction of a pollutant into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, shall require compliance with any applicable pretreatment requirements and any other requirement under section 1317 of this title; and
(B) not later than July 1, 1983, compliance by all publicly owned treatment works with the requirements set forth in section 1281(g)(2)(A) of this title.
(c) Modification of timetable.
The Administrator may modify the ■requirements of subsection (b)(2)(A) of this section with respect to any point source for which a permit application is filed after July 1, 1977, upon a showing by the owner or operator of such point source satisfactory to the Administrator that such modified requirements (1) will represent the maximum use of technology within the economic capability of the owner or operator; and (2) will result in reasonable further progress toward the elimination of the discharge of pollutants.
(d) Review and revision of effluent limitations.
Any effluent limitation required by paragraph (2) of subsection (b) of this section shall be reviewed at least every five years and, if appropriate, revised pursuant to the procedure established under such paragraph.
(e) All point discharge source application of effluent limitations.
Effluent limitations established pursuant to this section or section 1312 of this title shall be applied to all point sources of discharge of pollutants in accordance with the provisions of this chapter.
(f) Illegality of discharge of radiological, chemical, or biological warfare agents or high-level radioactive waste.
SECTION 302
§ 1312. Water quality related effluent limitations.
(a) Whenever, in the judgment of the Administrator, discharges of pollutants from a point source or group of point sources, with the application of effluent limitations required under section 1311(b)(2) of this title, would interfere with the attainment or maintenance of that water quality in a specific portion of the navigable waters which shall assure protection of public water supplies, agricultural and industrial uses, and the protection and propagation of a balanced pollution of shellfish, fish and wildlife, and allow recreational activities in and on the water, effluent limitations (including alternative effluent control strategies) for such point source or sources shall be established which can reasonably be expected to contribute to the attainment or maintenance of such water quality.
(b) (1) Prior to establishment of any effluent limitation pursuant to subsection (a) of this section, the Administrator shall issue notice of intent to establish such limitation and within ninety days of such notice hold a public hearing to determine the relationship of the economic and social costs of achieving any such limitation or limitations, including any economic or social dislocation in the affected community or communities, to the social and economic benefits to be obtained (including the attainment of the objective of this chapter) and to determine whether or not such effluent limitations can be implemented with available technology or other alternative control strategies.
(2) If a person affected by such limitation demonstrates at such hearing that (whether or not such technology or other alternative control strategies are available) there is no reasonable relationship between the economic and social costs and the benefits to be obtained (including attainment of the objective of this chapter), such limitation shall not become effective and the Administrator shall adjust such limitation as it applies to such person.
(c) The establishment of effluent limitations under this section shall not operate to delay the application of any effluent limitation established under section 1311 of this title. (June 30, 1948, ch. 758, Title III, § 302, as added Oct. 18, 1972, Pub.L. 92-500, § 2, 86 Stat. 846.)
SECTION 304
§ 1314. Information and guidelines.
(a) Criteria development and publication.
% * ¡H * sfs *
(b) Effluent limitation guidelines.
For the purpose of adopting or revising effluent limitations under this chapter the Administrator shall, after consultation with appropriate Federal and State agencies and other interested persons, publish within one year of October 18, 1972, regulations, providing guidelines for effluent limitations and, at least annually thereafter, revise, if appropriate, such regulations. Such regulations shall—
(1)(A) identify, in terms of amounts of constituents and chemical, physical, and biological characteristics of pollutants, the degree of effluent reduction attainable through the application of the best practicable control technology currently available for classes and categories of point sources (other than publicly owned treatment works); and (B) specify factors to be taken into account in determining the control measures and practices to be applicable to point sources (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best practicable control technology currently*1069 available to comply with subsection (b)(1) of section 1311 of this title shall include consideration of the total cost of application of technology in relation to the effluent reduction benefits to be achieved from such application, and shall also take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate;
(2) (A) identify, in terms of amounts of constituents and chemical, physical, and biological characteristics of pollutants, the degree of effluent reduction attainable through the application of the best control measures and practices achievable including treatment techniques, process and procedure innovations, operating methods, and other alternatives for classes and categories of point sources (other than publicly owned treatment works); and
(B) specify factors to be taken into account in determining the best measures and practices available to comply with subsection (b)(2) of section 1311 of this title to be applicable to any point source (other than publicly owned treatment works) within such categories or classes. Factors relating to the assessment of best available technology shall take into account the age of equipment and facilities involved, the process employed, the engineering aspects of the application of various types of control techniques, process changes, the cost of achieving such effluent reduction, non-water quality environmental impact (including energy requirements), and such other factors as the Administrator deems appropriate; and
(3) identify control measures and practices available to eliminate the discharge of pollutants from categories and classes of point sources, taking into account the cost of achieving such elimination of the discharge of pollutants.
SECTION 306
§ 1316. National standards of performance.
(a) Definitions.
For purposes of this section:
(1) The term “standard of performance” means a standard for the control of the discharge of pollutants which reflect the greatest degree of effluent reduction which the Administrator determines to be achievable through application of the best available demonstrated control technology, processes, operating methods, or other alternatives, including, where practicable, a standard permitting no discharge of pollutants.
(2) The term “new source” means any source, the construction of which is commenced after the publication of proposed regulations prescribing a standard of performance under this section which will be applicable to such source, if such standard is thereafter promulgated in accordance with this section.
sfc :fc cfc He He *
(b) Categories of sources; Federal standards of performance for new sources.
(1)(A) The Administrator shall, within ninety days after October 18, 1972, publish (and from time to time thereafter shall revise) a list of categories of sources, which shall, at the minimum, include:
s|« sfc sfs * sfc *
iron and steel manufacturing;
sfc He H: sfc H: H=
(B) As soon as practicable, but in no ease more than one year, after a category of sources is included in a list under subparagraph (A) of this paragraph, the Administrator shall propose and publish regulations establishing Federal standards of performance for new sources within such category. The Administrator shall afford interested persons an opportunity for written comment on such proposed regulations. After considering such comments, he shall promulgate,
(2) The Administrator may distinguish among classes, types, and sizes within categories of new sources for the purpose of establishing such standards and shall consider the type of process employed (including whether batch or continuous).
(3) The provisions of this section shall apply to any new source owned or operated by the United States.
* * * * * *
SECTION 316
§ 1326. Thermal discharges.
* * * * * *
(b) Cooling water intake structures.
Any standard established pursuant to section 1311 of this title or section 1316 of this title and applicable to a point source shall require that the location, design, construction, and capacity of cooling water intake structures reflect the best technology available for minimizing adverse environmental impact.
(c) Period of protection from more stringent effluent limitations following discharge point source modification commenced after October 18, 1972.
Notwithstanding any other provision of this chapter, any point source of a discharge having a thermal component, the modification of which point source is commenced after October 18, 1972, and which, as modified, meets effluent limitations established under section 1311 of this title or, if more stringent, effluent limitations established under section 1313 of this title and which effluent limitations will assure protection and propagation of a balanced, indigenous population of shellfish, fish, and wildlife in or on the water into which the discharge is made, shall not be subject to any more stringent effluent limitation with respect to the thermal component of its discharge during a ten year period beginning on the date of completion of such modification or during the period of depreciation or amortization of such facility for the purpose of section 167 or 169 (or both) of Title 26, whichever period ends first. (June 30, 1948, ch. 758, title III, § 316, as added Oct. 18, 1972, Pub.L. 92-500, § 2, 86 Stat. 876.)
SECTION 401
§ 1341. Certification.
(a) Compliance with applicable requirements; application; procedures; license suspension.
(1) Any applicant for a Federal license or permit to conduct any activity including, but not limited to, the construction or operation of facilities, which may result in any discharge into the navigable waters, shall provide the licensing or permitting agency a certification from the State in which the discharge originates or will originate, or, if appropriate, from the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provisions of sections 1311, 1312, 1316, and 1317 of this title. In the case of any such activity for which there is not an applicable effluent limitation or other limitation under sections 1311(b) and 1312 of this title, and there is not an applicable standard under sections 1316 and 1317 of this title, the State shall so certify, except that any such certification shall not be deemed to satisfy section 1371(c) of this title. Such State or
* % * * ^ *
SECTION 402
§ 1342. National pollutant discharge elimination system.
(a) Permits for discharge of pollutants.
(1) Except as provided in sections 1328 and 1344 of this title, the Administrator may, after opportunity for public hearing, issue a permit for the discharge of any pollutant, or combination of pollutants, notwithstanding section 1311(a) of this title, upon condition that such discharge will meet either all applicable requirements under sections 1311, 1312, 1316, 1317, 1318, and 1343 of this title, or prior to the taking of necessary implementing actions relating to all such requirements, such conditions as the Administrator determines are necessary to carry out the provisions of this chapter.
(2) The Administrator shall prescribe conditions for such permits to assure compliance with the requirements of paragraph (1) of this subsection, including conditions on data and information collection, reporting, and such other requirements as he deems appropriate.
(3) The permit program of the Administrator under paragraph (1) of this subsection, and permits issued thereunder, shall be subject to the same terms, conditions, and requirements as apply to a State permit program and permits issued thereunder under subsection (b) of this section.
% !(s
(b) State permit programs.
At any time after the promulgation of the guidelines required by subsection (h)(2) of section 1314 of this title, the Governor of each State desiring to administer its own permit program for discharges into navigable waters within its jurisdiction may submit to the Administration a full and complete description of the program it proposes to establish and administer under State law or under an interstate compact. In addition, such State shall submit a statement from the attorney general (or the attorney for those State water pollution control agencies which have independent legal counsel), or from the chief legal officer in the case of an interstate agency, that the laws of such State, or the interstate compact, as the case may be, provide adequate authority to carry out the described program. The Administrator shall approve each submitted program unless he determines that adequate authority does not exist:
(1) To issue permits which—
(A) apply, and insure compliance with, any applicable requirements of sections 1311, 1312, 1316, 1317, and 1343 of this title;
$ Sfc % # % *
(d) Notification of Administrator.
(1) Each State shall transmit to the Administrator a copy of each permit application received by such State and provide notice to the Administrator of every action related to the consideration of such permit application, including each permit proposed to be issued by such State.
******
SECTION 501
§ 1361. Administration.
(a) Authority of Administrator to prescribe regulations.
The Administrator is authorized to prescribe such regulations as are necessary to carry out his functions under this chapter.
******
SECTION 505
§ 1365. Citizen suits.
(a) Authorization; jurisdiction.
Except as provided in subsection (b) of this section, any citizen may commence a civil action on his own behalf—
(1) against any person (including (i) the United States, and (ii) any other governmental instrumentality or agency to the extent permitted by the eleventh amendment to the Constitution) who is alleged to be in violation of (A) an effluent standard or limitation under this chapter or (B) an order issued by the Administrator or a State with respect to such a standard or limitation, or
(2) against the Administrator where there is alleged a failure of the Administrator to perform any act or duty under this chapter which is not discretionary with the Administrator.
The district courts shall have jurisdiction, without regard to the amount in controversy or the citizenship of the parties, to enforce such an effluent standard or limitation, or such an order, or to order the Administrator to perform such act or duty, as the case may be, and to apply any appropriate civil penalties under section 1319(d) of this title.
******
(f) Effluent standard or limitation.
For purposes of this section, the term “effluent standard or limitation under this chapter” means (1) effective July 1, 1973, an unlawful act under subsection (a) of section 1311 of this title; (2) an effluent limitation or other limitation under section 1311 or 1312 of this title; (3) standard of performance under section 1316 of this title; (4) prohibition, effluent standard or pretreatment standards under section 1317 of this title; (5) certification under section 1341 of this title; or (6) a permit or condition thereof issued under section 1342 of this title, which is in effect under this chapter (including a requirement applicable by reason of section 1323 of this title).
******
SECTION 509
§ 1369. Administrative procedure and judicial review.
******
(b)(1) Review of the Administrator’s action (A) in promulgating any standard of performance under section 1316 of this title, (B) in making any determination pursuant to section 1316(b)(1)(C) of this title, (C) in promulgating any effluent standard, prohibition, or pretreatment standard under section 1317 of this title, (D) in making any determination as to a State permit program submitted under section 1342(b) of this title, (E) in approving or promulgating any effluent limitation or other limitation under section 1311, 1312, or 1316 of this title, and (F) in issuing or denying any permit under section 1342 of this title, may be had by any interested person in the Circuit Court of Appeals of the United States for the Federal judicial district in which such person resides or transacts such business upon application by such person. Any such application shall be made within ninety days from the date of such
. 39 Fed.Reg. 24114, 40 C.F.R. § 420.10 et seq.
. 33 U.S.C. § 1362(14) defines “point source” as “any discernible, confined and discrete conveyance, including but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, from which pollutants are or may be discharged.”
. Regulations for “secondary” (or finishing) operations have not yet been promulgated.
. 33 U.S.C. § 1251 et seq. (Supp. II 1972). The relevant sections of the Act are set out in full in the appendix to this opinion.
. 33 U.S.C. § 1369(b)(1).
. The power of the Administrator to establish such limitations for new point sources under § 306 of the Act, 33 U.S.C. § 1316, is unquestioned. Thus, petitioners’ challenge to the new source regulations, discussed in parts VI and VII of this opinion, takes a different approach.
. 33 U.S.C. § 1311.
. Id. § 1314.
. Id. § 1342.
. Id. § 1316(b)(1)(B).
. Id. § 1317(a)(2).
. Id. § 1317(b).
. Id. § 1313(b).
. It is undisputed that the Administrator did not even consider this evaporation problem. But see Part IV(c) of this opinion.
. See part I of Judge Adams’ opinion in which Judge Garth and I join. As part I of that opinion aptly notes, Congress’ failure to express more clearly its intent on such a crucial matter is indeed disturbing and we hope that Congress will heed our admonition to draft its legislation with greater clarity. The admitted ambiguities in this Act, however, cannot be an excuse to avoid deciding the case before us, and we are satisfied that our resolution of the Act’s ambiguities is the one most consistent with Congress’ expressed intent.
. In fact, § 301(c) itself seems to support the Administrator’s position by presupposing the existence of a section 301 effluent limitation which the Administrator can relax. Petitioners, noting that § 301(c) empowers the Administrator to “modify the requirements” of § 301(b)(2)(A), contend that this merely means that the Administrator may relax the requirement that “BATEA” technology be used. However, it is clear from Senator Muskie’s statement in support of the Conference bill that Congress contemplated the relaxation of limitations:
“The Conferees have provided, however, a mechanism for individual point-source-by-source consideration in section 301(c). That section provides that the Administrator may modify any effluent limitation based on ‘best available technology’ to be achieved by July 1, 1983 . . . [Emphasis added].”
Environmental Policy Division of the Library of Congress, A Legislative History of the Water Pollution Control Act Amendments of 1972, 93d Cong., 1st Sess. (Comm. Print 1973), at 172 [hereinafter, “Leg.Hist.”].
. In the original Senate bill, S. 2770, § 509(b)(1) contained essentially the same language it does now [see Leg.Hist. at 1713], while § 301(c) was what is now § 301(d), and no subsection in § 301 contained what is now § 301(c) [see Leg.Hist. at 1610]. It is clear that what is now § 301(c) was added during the House-Senate Conference. See Leg.Hist. at 172 and 304.
. 33 U.S.C. § 1365.
. The Senate Report states, with reference to section 505, that “[i]n addition to violations of Section 301(a), citizens are granted authority to bring enforcement action for violations of effluent limitations under section 301 . and any condition of any permit issued under section 402.” Leg.Hist. at 1500.
. 33 U.S.C. § 1341(a)(1).
. See § 501(a), 33 U.S.C. § 1361(a), which provides: “The Administrator is authorized to prescribe such regulations as are necessary to carry out his functions under the Act.”
. 33 U.S.C. § 1312(c).
. Id. § 1326(b).
. Id. § 1326(c).
. Leg.Hist. at 1468 (emphasis added). The bill as enacted, of course, had a date of July 1, 1977 instead of January 1, 1976.
. Leg.Hist. at 169.
. Id. at 1283 (emphasis added).
. Id. at 1391.
. Id. at 844.
. Such a veto power was eventually provided in section 402(d)(2), 33 U.S.C. § 1342(d)(2).
. 42 U.S.C. § 1857c — 5.
. 421 U.S. at 75, 95 S.Ct. at 1479.
. We also reject the argument made by Youngstown that differing language in §§ 301(b)(1)(A) and 301(b)(2)(A) indicates that the administration of the Act differs as between 1977 and 1983 limitations. Noting that § 301(b)(1)(A) requires the achievement of “effluent limitations for point sources,” whereas § 301(b)(2)(A) requires the achievement of “effluent limitations for categories and classes of point sources,” Youngstown appears to argue that the 1983 limitations can only be established on a category or class basis while conceding that they can be established on an individual basis for 1977. However, we see nothing in the legislative history indicating that the regulatory scheme was to be so radically different as between the 1977 and 1983 limitations. Furthermore, it makes little sense to have the limitations applied on a point source by point source basis in 1977, while permitting limitations on a category-wide basis six years later. We thus conclude that any ambiguity created by §§ 301(b)(1)(A) and 301(b)(2)(A) on this point was inadvertent and was a result of imprecise legislative drafting.
. Substantially similar language is included in section 304(b)(2)(B), pertaining to guidelines for 1983 standards.
. Leg.Hist. at 172.
. Id. at 254-55.
. Id. at 1468.
. Id. at 172.
. As the Eighth Circuit in CPC International stated, “[t]his preoccupation with the precision of the guidelines as a means of achieving uniformity makes no sense in a regime where the permit-issuing authorities are to look, not to the guidelines, but to regulations promulgated under § 301.” Where we disagree with the Eighth Circuit is its conclusion that the permit grantors were not also constrained by § 301 limitations. As explained below, we conclude that they are bound to follow both § 301 limitations and § 304 guidelines.
. Leg.Hist. at 1468 (emphasis added).
. Id. (emphasis added).
. Id. at 169 (emphasis added).
. Id. at 1468 (emphasis added).
. While Congress used the term “base level,” henceforth in our discussion of limitations we will refer to a ceiling of effluent discharge which the polluter cannot exceed, since we believe that the latter term more clearly expresses Congress’ intent.
. Those twelve subcategories are: by-product coke, beehive coke, sintering, blast furnace (iron), blast furnace (ferromanganese), basic oxygen furnace (semi-wet air pollution control methods), basic oxygen furnace (wet methods), open hearth furnace, electric arc furnace (semi-wet methods), electric arc furnace (wet methods), vacuum degassing, and continuous casting.
. While it is true that the Final Development Document accompanying the regulations makes some references to “base levels,” it is clear that the Document used the term in a very different sense than the one in which we believe Congress used it. As we noted earlier (see notes 42 and 42a supra and accompanying text), we believe that Congress in referring to “base level” meant a “ceiling” on the permissible amount of effluent discharge. Page 257 of the Development Document (Appendix at 1521a), however, states that the Agency first determined the “base or minimum level of treatment . . . already in existence for practically all plants within the industry in any given subcategory,” and then “added on” to that base level to reach the levels required by the “BPCTCA” and “BATEA” standards. Thus, the “base level” referred to in the Final Development Document was in reference to the level of treatment “already in existence,” rather than to the maximum degree of effluent discharge the Administrator determines is permissible under the Act. We see nothing in the Development Document indicating a consideration of the type of “base level” or “ceiling” about which we are concerned.
. Final Development Document at 107, Appendix at 1401a.
. For example, after noting that the Administrator determined that the additional energy requirements for alternative I treatment technology for by-product coke in 1977 would be 0.22 kwh/kkg, petitioners claim: “Nowhere is it shown how this number was established, whether it is good, bad or indifferent.” Petitioners, however, have pointed to no evidence
. CF&I estimates that at present its plant causes the loss of 4.65 million gallons of water per day and that, upon installation of the necessary anti-pollution devices, this amount would increase by an additional 7 million gallons per day. The Administrator, however, disputes these estimates.
. Besides CF&I plant in Colorado, those plants are a United States Steel plant in California. Appendix at 1343a-1344a.
. CF&I contends that the Administrator should have been aware of the water shortage problem because of the Federal Government’s funding and sponsorship of water resource projects throughout semi-arid regions of the country, such as the Fryingpan-Arkansas Project, and because the EPA was specifically advised of Colorado’s water shortage problem with respect to effluent guidelines for the beet-sugar industry. However, the fact that the Administrator perhaps should have been aware of the water scarcity problems in Colorado does not mean that it should have known that recycling systems required to meet effluent limitations for the steel industry would have had a potentially serious effect on the water supply.
We also reject CF&I’s contention that the regulations are invalid because they conflict with state law requiring water conservation. To the extent that these federal regulations are valid and are in conflict with state law, they take precedence under the Supremacy Clause of the Constitution. Cf. Florida Avocado Growers v. Paul, 373 U.S. 132, 83 S.Ct. 1210, 10 L.Ed.2d 248 (1963).
. Leg.Hist. at 170 (emphasis added).
. Id. (emphasis added). The ambiguity here is created by the evident inconsistency between the statements that “cost should be a factor” and that reasonableness should be determined “without regard to cost.” Nevertheless, it is clear that for “BATEA” standards, cost was to be less important than for the “BPCTCA” standards, and that for even the “BPCTCA” standards cost was not to be given primary importance.
. Id. at 1282.
. See note 3 supra and accompanying text.
. Petitioners challenge the cost-benefit studies as being inadequate and conclusory. As we noted before, however, a cost-benefit analysis is not. required at all for any technology level other than the 1977 “BPCTCA” standards, and even there it is supposed to be only a “limited” analysis. See text accompanying footnote 50 supra. Also, Congress well recognized the impossibility of obtaining a mathematically accurate cost-benefit analysis in the area of pollution control. The portion of the Senate Report discussing § 302 of the Act, which requires a more specific cost benefit analysis for “water quality standards” than does § 304, states:
“The Committee recognizes that no mathematical balance can be achieved in considering relative costs and benefits nor would any precise formula be desirable, but in each case the Administrator or the State will be able to determine whether there is any reasonable connection at all between the costs which a particular effluent limitation would impose and any benefits (including the attainment of natural water quality) which might be derived.”
Leg.Hist. at 1466. This difficulty in quantifying such a balance has also been discussed in Note, The Federal Water Pollution Control Act Amendments of 1972: Ambiguity as a Control Device, 10 Harv.J.Legis. 565, 587-88 (1973). Cf. Portland Cement Association v. Ruckelshaus, 158 U.S.App.D.C. 308, 486 F.2d 375, 387 (1973). The necessarily subjective nature of such an analysis supports the view that the Administrator must have broad discretion in weighing the costs and benefits.
. 39 Fed.Reg. 24118.
. Their brief merely cites the conclusory and undocumented statement which they had made in a report to the agency during the rule-making proceedings. Appendix at 1098a.
. Petitioners argue that the Administrator’s consideration of the costs for only phase I operations was contrary to the mandate in § 304(b)(1)(B) that he consider “total cost.” We note initially that there is no such requirement in § 304(b)(2)(B), pertaining to 1983 “BATEA” standards. More important, we note that Congress intended by the phrase “total cost” only to require consideration of both “internal” and “external” costs; there is no. indication that Congress intended by this phrase to preclude separate cost studies for separate regulations governing two or more broad types of operations within a particular industry. As Representative Jones stated:
“The term ‘total cost of application of technology’ as used in section 304(b)(1)(B) is meant to include those internal, or plant costs sustained by the owner or operator and those external costs such as potential unemployment, dislocation, and rural area economic development sustained by the community, area, or region.”
Leg.Hist. at 231. As discussed later in this opinion, we believe that the Administrator gave sufficient consideration to these factors.
. National Resources Defense Council, Inc. v. Train, 6 ERC 1033 (D.D.C.1973), rev’d in part, 166 U.S.App.D.C. 312, 510 F.2d 692 (1974).
. We also do not see much merit to petitioners’ contention that the failure to promulgate phase II regulations deprives them of the ability to plan rationally in determining which plants cannot be operated economically and should be closed rather than retrofitted with pollution abatement equipment. Petitioners have presented no evidence to show that the design of treatment works for one phase would be dependent on the other. Furthermore, petitioners have been participating actively in the rule-making proceedings now under way for phase II regulations, and thus have a general idea as to what will be required of them. While petitioners do not yet know the precise numerical figures to be established in the limitations and guidelines, we believe they have sufficient knowledge to be able to make informed business decisions.
. 39 Fed.Reg. 24116 (comment # 23); Appendix at 1692a.
. While these developments occurred subsequent to the promulgation of the regulations in question, we believe that we should not close our eyes to such evidence where it has an important bearing on agency assumptions and predictions. See Amoco Oil Co. v. Environmental Protection Agency, 163 U.S.App.D.C. 162, 501 F.2d 722, 729 n.10 (1974). While this evidence was not in the nature of sworn testimony, as in Amoco Oil, it consisted of the companies’ own announcements as to their earnings and plans, and thus can be treated as equally reliable. Furthermore, the petitioners do not contest the accuracy of this evidence.
. The Kearney Report also concluded that pollution control equipment could be financed through the use of tax-exempt bonds. Appendix at 290a-293a. See 26 U.S.C. § 103(c)(4)(E) & (F).
. The validity of the water quality standards is not before us in this case. Such standards are more stringent than effluent limitations, since they are intended to maintain water quality where effluent limitations are insufficient. See § 302 of the Act, 33 U.S.C. § 1312.
. 39 Fed.Reg. 24115, comment #11.
. The Administrator’s response was that “the agency is currently developing amendments to its NPDES permit regulations (40 CFR Part 125) which will specify the situations in which the Regional Administrator may allow a credit for the pollutants present in the plant’s intake waters.” 39 Fed.Reg. 24115, comment #11 (emphasis added).
. 39 Fed.Reg. 28926 (Aug. 12, 1974).
. The Senate Report stated:
“The Administrator will have the capability and the mandate to press technology and economics to achieve those levels of effluent reduction which he believes to be practicable in the first instance and attainable in the second. .
. . It is acknowledged that in those industrial categories where present practices are uniformly inadequate, the Administrator may determine best practicable to require higher levels of control than any currently in place if he determines the technology to achieve those higher levels can be practicably applied.”
Leg.Hist. at 1460, 1468.
. See note 4 supra.
. Leg.Hist. at 798.
. Id. at 1476 (Senate Committee Report).
. Leg.Hist. at 797.
. Id. at 172.
. “Transfer technology” refers to technology which has been developed in one process or industry but which the Administrator believes can be successfully “transferred” to other processes or industries which operate under similar conditions.
. We thus reject as frivolous petitioners’ contention that “the entire study of the new source standards of performance comprises only five pages of the final development document prepared to support the Regulations,” since the study underlying the “BATEA” levels served also as the basis for the “BADCT” levels.
. In part IV(c) of this opinion, we concluded that, while CF&I could not raise in this petition the Administrator’s failure to consider the evaporation problem, it could do so on remand in the context of the proceedings spelled out in part III of this opinion. Since we see no error in the establishment of the § 306 limitations which would require remand to reconsider those limitations in their totality, CF&I will be unable to raise the evaporation problem with respect to any new sources it may be planning to construct.
. The “flow rate” refers to the amount of waste water discharged (in terms of gallons) for each ton of product (e. g., coke or steel) produced. Since the limitations are expressed in terms of pounds of pollutants per 1000 pounds of product and are derived from a multiplication of flow and concentration, tradeoffs can occur between flow and concentration provided the limitation is not exceeded.
. This figure means one part fresh water added to each part of waste water.
. 39 Fed.Reg. 24116 (comment #22).
. Petitioners make the same contention, and the Administrator makes the same response, with respect to the new source standards. We believe the response is equally sufficient there.
. See note 67 supra and accompanying text.
. Leg.Hist. at 170.
. Section 301(d), 33 U.S.C. § 1311(d).
. Similarly, we see no evidence that the technology for achieving such a flow rate is “available” within the meaning of § 301(b)(2)(A), and thus we likewise remand for further consideration of the BATEA limitations for byproduct coke.
. Final Development Document at 336 and 387 (Appendix at 1599a and 1650a).
. Id.
. Id. at 218 (Appendix at 1496a).
. Appendix at 1114a.
. 39 Fed.Reg. 24115 (comment # 10).
. Final Development Document at 226, Appendix at 1501a.
. Appendix at 1115a.
. Fed.Reg. 24115 (comment # 10). Furthermore, his response still does not indicate whether a 50 (rather than a 60) gallon per ton flow rate was demonstrated.
. Id. (comment # 13).
. With respect to petitioners’ contention that the flow rates were established based on a sintering plant having a wet scrubber system only on the “dedusting” end, we have already indicated that plants having scrubbers on both ends would be entitled to a variance if they show that their inability to achieve the flow rate is attributable to their “fundamentally dif
. Our skepticism as to the Administrator’s belief that this technology has been demonstrated is based on the rather equivocal support for that alternative given in the Final Development Document itself, which stated that such treatment was “possible” (Appendix at 1467a). Furthermore, the Administrator’s reliance on transfer technology involving nitrification and denitrification processes (based on demonstrated success of nitrogen removal from municipal wastes) seems inconsistent with his recognition that a transfer of the biological denitrification process from municipal waste treatment to the open hearth and vacuum degassing subcategories was inappropriate. See 39 Fed.Reg. 24118 (comment # 7).
. 39 Fed.Reg. 6495.
. Plant L, Final Development Document at 203 (Appendix at 1486a).
. For this reason, we also reject petitioners’ challenge to the “BADCT” limitations established for the blast furnace subcategory.
. 39 Fed.Reg. 6495.
. Final Development Document at 404, Appendix at 1667a. This limitation, however, is based on a flow rate of 50 gallons per ton and thus may not be valid if, on remand, the evidence shows that the plugging and scaling problems are of such magnitude that the viability of recycle systems cannot be termed “demonstrated.”
. Final Development Document at 410, Appendix at 1673a.
. Id. at 405, Appendix at 1668a.
. See note 96 supra.
. Final Development Document at 404, Appendix at 1667a.
. Id. at 388, Appendix at 1651a.
. Id.
. Id. at 159-61, Appendix at 1452a-54a.
. Id. at 160, Appendix at 1453a.
. We also deny as moot the stay sought by petitioners’ pending appeal.
Concurrence Opinion
(concurring):
Although I subscribe completely to the majority’s decision to remand to the Environmental Protection Agency this administrative action, two concerns compel additional comment. The more troubling one is that the Court has been obliged to find the power of the Administrator to issue effluent limitations by a series of subtle inferences, rather than by reference to clear statutory language. Also disturbing is the manner in which the Administrator has exercised his statutory duty to consider the costs of pollution control technology in relation to the benefits of abating pollution. This aspect of the Administrator’s decision would seem to constitute another ground for remanding the Phase I iron and steel operation controls to the Administrator for further consideration.
I.
The Water Pollution Control Act of 1972 is an important environmental protection measure, one of several such critical laws enacted in recent years. It holds promise for the American people that within a reasonable time the lakes and rivers of this country will no longer be threatened by unpurified discharges of industrial and residential waste. The undertaking Congress proposed was technologically uncertain and likely to prove costly as new facilities would have to be installed and old practices would have to be abandoned in order to achieve the desirable objectives set forth in the law. Congress, nonetheless, viewed the problem of water pollution with a sense of urgency. It provided that effluent limitations for point sources compatible with the “best practicable control technology currently available” were to be achieved by J uly 1,1977
The states were chiefly responsible for the administration of the prior Act.
The Eighth Circuit has interpreted the Act as imposing the effluent limitations as conditions in each permit issued by a state authority, albeit congruent with the federal guidelines. Judge Hunter, in his able analysis, demonstrates that effluent limitations are to be a separate set of regulations, distinct from the permits, and that these regulations are to issue from the EPA, not from the states.
Regardless of the merits of the respective positions of the Eighth Circuit and this Court, both have had to arrive at their divergent interpretations of this fundamental aspect of the Act by inferences from ancillary provisions, and by deciphering the legislative intent from reading scraps and bits of a convoluted legislative history.
The failure to provide a clear procedural structure on so basic a matter in the administration of the Act is disquieting. In one sense, the difficulty of interpretation imposed here is of little consequence; it is the work of the courts to explicate the laws, no matter how complex their structure. In this instance, however, statutory vagueness inflicts harm on the purposes of the Act and impels the courts to determine the allocation of authority between the national and state governments in the administration of this program. The conflict of interpretation between the Circuits does not initiate, but certainly perpetuates confusion in the administration of the legislation. Under these circumstances, neither the states nor the Administrator, nor the industries and municipalities which are to be regulated by the Act, may be confident which agency possesses the legal authority to promulgate effluent limitations. The result of such incertitude is delay in the implementation of the substantive provisions of the Act while the concerned parties engage in costly litigation to determine the legal powers of each enforcement agency. Such controversy postpones the achievement of the Act’s lofty objectives, and imposes a burden on the Courts of Appeals and the Supreme Court which they might have been spared by careful drafting.
In addition, the difficulty in interpretation impinges on the powers of the coordinate branches of government within the federal system. Ours is a cooperative federalism in which the states and the national government share responsibilities for many programs. The definition of the roles of the state and national governments in areas where they share concurrent powers is essentially a matter for Congress, not for the courts.
The Administrator’s exercise of his discretion in connection with the cost analysis is the nub of my second concern. Congress has delegated to the Environmental Protection Agency a far-reaching power to strike a balance between water quality and the economy. In framing the guidelines for 1977 effluent limitations for existing point sources, the Administrator is directed by law to consider the costs of pollution control technology in relation to the benefits of pollution abatement. A reviewing court, asked by petitioners to declare an administrative action “arbitrary” or “an abuse of discretion,” is not to substitute its judgment for that of the agency. The Court must make a careful inquiry, however, to ascertain whether the decision of the agency was “based on a consideration of the relevant factors and whether there has been a clear error of judgment.”
Section 304(b)(1)(B) instructs the Administrator to consider “the total cost of application of [the best practicable control technology currently available] in relation to the effluent reduction benefits to be achieved from such application . ” when establishing guidelines for the 1977 effluent limitations.
Having accounted for the total costs of applying the requisite technology, the Administrator must consider those costs in relation to the benefits to be achieved from the application of the technology. The Act does not mandate an exacting quantitative comparison in the form of a technical benefit/cost analysis. Nevertheless, from the remarks of Senator Muskie in support of the conference bill it appears that, with respect to the 1977 guidelines, the Act does require the Administrator to make an analysis sufficient to indicate that “the additional degree of effluent reduction is [not] wholly out of proportion to the costs of achieving such marginal level of reduction. . . . ”
There is no doubt that Congress understood the difficulty and perhaps even the impossibility of reducing to monetary terms all, or even many, of the benefits from moderating pollution.
Costs and benefits could not be accurately compared, if the Administrator were to omit significant benefits, or significant costs, in evaluating pollution control technologies for 1977. Only on the basis of a comprehensive survey could the Administrator conscientiously determine that the costs and benefits of reducing pollution were in some way proportionate. Without the aid of such a survey, decisions might be rendered which distort the priorities intended by Congress.
In this ease, the Administrator has considered the plant costs of applying the control technology; however, his calculations in this respect are incomplete. In particular, he has assumed that all treatment facilities will be constructed on “green field” sites. Consequently, he has neglected to estimate any average costs for site clearance and preparation. Sites are assumed to need no extensive preparation such as rock excavation, pilings, drainage, grading, or tree removal. In addition, “[l]and acquisition costs are not included in cost estimates.” Other costs not considered in the Administrator’s calculations include the costs of expanding utility support systems and interconnecting utility runs. Although the steel companies have presented only conclusory assertions regarding the significance of these excluded costs, the Administrator would seem to be obliged by the Act to consider these items-as part of “the total cost of technology.”
If the Administrator is required to consider the external or secondary costs of applying the best practicable pollution control technology, it appears that he has also failed to satisfy the Act in this respect. Although a report commissioned by the Administrator
Where costs are to be evaluated “in relation to” the benefits of reducing pollution, as in the case of the 1977 guidelines, the Administrator should survey the extent of the benefits as well as the costs that the pollution control technology may be expected to provide. The Final Development Document, however, describes only the types of harm that pollution control technology will help to abate. It does not account for the extent of the injury to be alleviated by the control technology. Consequently, it cannot be ascertained from the record whether the benefits to be attained are substantial.
The Administrator has concluded that “the benefits of reducing the pollutants discharged justify the associated costs .” of applying pollution control technology to Phase I iron and steel op-©rations.
It is no small matter to which the Administrator is to direct his attention. A decision to protect the environment necessarily imposes heavy costs on the accustomed ways of production, employment, and consumption in this country. In passing the Water Pollution Control Act of 1972, Congress attempted to balance the improvement in the quality of
. § 301(b)(1)(A), 33 U.S.C. § 1311(b)(1)(A) (Supp. Ill 1973).
. Id. (b)(2)(A).
. § 101(a), 33 U.S.C. § 1251(a) (Supp. Ill 1973).
. 33 U.S.C. 1151 et seq. (1970), as amended 33 U.S.C. § 1251 et seq. (Supp. Ill 1973).
. § 402(a), 33 U.S.C. § 1342(a) (Supp. Ill 1973).
. § 510, 33 U.S.C. § 1370 (Supp. Ill 1973).
. § 401(a)(1), 33 U.S.C. § 1341(a)(1) (Supp. Ill 1973).
. § 402(c)(2), 33 U.S.C. § 1342(c)(2) (Supp. Ill 1973).
. Id. (b), (c).
. Id. (d).
. Id. (c)(3).
. CPC International, Inc. v. Train, 515 F.2d 1032 (8th Cir. 1975).
. See Franklin Nat’l Bank v. New York, 347 U.S. 373, 378-79, 74 S.Ct. 550, 98 L.Ed. 767 (1954); Palmer v. Massachusetts, 308 U.S. 79, 84, 60 S.Ct. 34, 84 L.Ed. 93 (1939). Cf. Douglas v. City of Jeannette, 319 U.S. 157, 162-63, 63 S.Ct. 877, 87 L.Ed. 1324 (1943).
. Citizens to Preserve Overton Park v. Volpe, 401 U.S. 402, 416, 91 S.Ct. 814, 824, 28 L.Ed.2d 136 (1971); Duquesne Light Co. v. EPA, 522 F.2d 1186, 1192 (3d Cir. 1975).
. 33 U.S.C. § 1314(b)(1)(B) (Supp. Ill 1973). We note that the specific mandate to consider costs in relation to benefits is limited to the 1977 existing point source standards and does not appear to apply to the 1983 standards under subsection (b)(2)(B) or to new sources under section 306(b)(1)(B). In those sections the Administrator is, however, admonished to take costs “into account” or “into consideration.” The admonition may be taken to imply some kind of comparison of costs and benefits, although the proportionality between costs and benefits, indicated by section 304(b)(1)(B), would not seem to be required for these other sections.
. See Library of Congress, Environmental Policy Division, A Legislative History of the Water Pollution Control Act Amendments of 1972, 93d Cong., 1st Sess. 231 (Comm. Print 1973). (Remarks of Rep. Jones).
. See id. 170 (Remarks of Sen. Muskie). Cf. id. 1466 (Senate Report discussing the analysis of costs and benefits required by § 302).
. See id. 1466.
. Senator Muskie’s references to the “additional degree of effluent reduction” and to “such marginal level of reduction” seem to indicate that the comparison required by Congress is not between total benefits and total costs, but between the costs and benefits attributable to each significant step in pollution abatement. Presumably an incremental analysis would avoid the risk of hidden imbalances between cost and benefit. Such imbalances could be of serious magnitude where, as here, major industries are the subjects of regulation. An incremental analysis would, of course, be more complex than a simple comparison of total costs and benefits. To the extent that estimates of total costs and benefits are aggregates of the costs and benefits of each step in the pollution abatement process, however, the basic data for incremental analysis should be readily available.
. The costs in question will vary according to the conditions of each site, and the Administrator cannot be expected to produce exact costs for each site. He may, however, resort to estimated average figures.
. The Administrator appears to adopt the report and its supplement by his statement at 39 Fed.Reg. 24118 (1974) that “[t]he total cost of implementing the effluent limitations guidelines includes . . . the indirect economic costs identified in the supplementary report entitled “Economic Analysis of the Proposed Effluent Guidelines for the Integrated Iron and Steel Industry” (February 1974). The Administrator does not appear to engage in any more detailed discussion of indirect costs in the Final Development Document.
. As justification for a determination that there is no need for an investment choice between expansion of capacity and pollution control, the Administrator submits newspaper articles on the financial condition of the steel industry that have appeared subsequent to the promulgation of the regulations. The Court accepts those materials, relying on the reasoning of Amoco Oil Co. v. EPA, 163 U.S.App.D.C. 162, 501 F.2d 722, 729 n.10 (1974). In the circumstances of this case, where the regulations are to be remanded to the Administrator for reconsideration in many respects, it appears to be unnecessary and perhaps inappropriate for the Court to take notice in this fashion of subsequently developed information.
As a general principle, moreover, it is disturbing that courts should consider subsequently developed information to determine whether an administrative decision is “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” To entertain such information may encourage the use of the courts as mere extensions of a continuous administrative process. It may also encourage some administrators to issue decisions that may well be arbitrary at the time of promulgation, hoping like Micawber that “something will turn up.” Neither of these consequences would appear to enhance the efficiency of the courts or the confidence of citizens in the fairness of the administrative process. See SEC v. Chenery Corp., 332 U.S. 194, 196, 67 S.Ct. 1760, 91 L.Ed. 1995 (1947); SEC v. Chenery Corp., 318 U.S. 80, 94-95, 63 S.Ct. 454, 87 L.Ed. 626 (1943).
. 39 Fed.Reg. 24118 (1974).
. 401 U.S. at 416, 91 S.Ct. 814.
. See Bowman Transportation, Inc. v. Arkansas-Best Freight Systems, Inc., 419 U.S. 281, 285-86, 95 S.Ct. 438, 442, 42 L.Ed.2d 447 (1974).
. See id. 286, 95 S.Ct. 438.