ORDER GRANTING DEFENDANTS’ MOTION FOR SUMMARY JUDGMENT
Plaintiff Donnie Allen (“Plaintiff’) brings this action against BP Corporation North America, Inc., BP Amoco Corporation, and BP Exploration & Production, Inc. (collectively, “BP” or “BP Defendants”) alleging that the BP Defendants are partially responsible for the injuries Plaintiff sustained while working offshore. Now before the Court is BP’s Motion for Summary Judgment, and the timely Response thereto. For all of the reasons. *655 articulated below, BP’s Motion is GRANTED and the Court hereby DISMISSES WITH PREJUDICE all of Plaintiffs claims against the BP Defendants only.
I. FACTUAL BACKGROUND
Plaintiff was employed by Seacor Marine, Inc. (“Seacor”) as a deckhand/unlicensed engineer on one of its oil field support vessels, the MTV RON PAUL (the “Vessel”). On November 2, 2001, the day of Plaintiffs injury, the Vessel was alongside one of BP’s fixed platforms offshore of Louisiana assisting an offloading of an “x-ray building” from such platform to the Vessel. The cargo was being offloaded from the platform by one of BP’s cranes-the crane was attached to the platform but the crane was actually operated by Defendant Lenny Miller, who was employed by Defendant C & D Production Specialists Co., Inc. (“C & D”)-the independent contractor that BP hired to operate that particular platform.
The injury occurred while Plaintiff was attempting to release the crane hook and stringer from the offloaded cargo. Plaintiff alleges that the “crane operator allowed the headache ball to fall, causing the ball to crash into the x-ray building and jerking the stringer and hook up and out of Plaintiffs hand causing severe and disabling injuries to his wrist, elbow, arm, and shoulder.” As a result, Plaintiff has undergone three surgeries to date, and he anticipates that future surgeries will be necessary.
BP has moved for summary judgment on the grounds that: (1) there were no BP employees on the Vessel or the platform at the time of injury; (2) there is no evidence of a mechanical problem with BP’s crane; and (3) the Master Service Contract between BP and C & D (“Contract”) identified C & D and its employees as independent contractors. Specifically, the relevant section of the Contract provides:
Independent Contractor. Contractor shall be an independent contractor with respect to all Work furnished hereunder, and neither Contractor nor anyone used or employed by Contractor shall be deemed for any purpose to be the agent, servant, employee, or representative of Company in the performance of such Work or any part thereof, or in any matter dealt with herein, and Company shall have no right to direct or control Contractor or its employees and agents, except in the results to be obtained.
(emphasis added). In response, Plaintiff contends that the Contract’s provision identifying C & D as an independent contractor is not dispositive, and that a genuine issue of material fact exists as to BP’s exercise of control over C & D’s employees on that particular platform.
II. ANALYSIS
Summary Judgment Standard
The BP Defendants move for summary judgment on all claims against them. When considering a motion for summary judgment, the Court accepts the nonmovant’s evidence and draws all justifiable inferences in that party’s favor.
See Matsushita Elec. Indus. Co. v. Zenith Radio Corp.,
The Court assumes that BP’s fixed platform (where Lenny Miller worked) is on the Outer Continental Shelf offshore of Louisiana.
1
As such, the Outer Continental Shelf Lands Act, 43 U.S.C. § 1331,
et al.
(“OCSLA”), defines what law applies to Plaintiffs claims against BP. OCSLA provides that courts should apply the law of the adjacent state as surrogate federal law to the extent that it is not inconsistent with federal laws and regulations.
See
43 U.S.C. § 1333(a)(2)(A);
see also Bartholomew v. CNG Producing Co.,
The first factor is the only factor in the PLT test that the Court believes presents a close question. In
Hollier v. Union Tex. Petroleum Corp.,
the Fifth Circuit held that the situs factor in the PLT test was satisfied when a plaintiff was killed while transferring from a stationary crew boat to a platform-he slipped between the boat and the platform and drowned-because the plaintiff was in “physical contact with the platform at the time of his injury.”
*657 BP Did Not Exercise Sufficient Control Over C & D or Its Employees to Lose BP’s Independent Contractor Defense
Generally, under Louisiana law, a principal “is not liable for the offenses an independent contractor commits in the course of performing its contractual duties.”
Ainsworth v. Shell Offshore, Inc.,
Plaintiff argues that the following acts collectively demonstrate that BP exercised sufficient operational control over C & D’s activities to subject BP to liability: (1) BP had a field coordinator (Johnny Morgan) that led daily safety meetings on the primary platform, which Miller attended; (2) Miller would periodically check in with Morgan to discuss the plans for particular tasks; (3) BP requires Miller to perform an inspection of the crane before each lift in accordance with BP’s safety forms, and then return those forms to BP; (4) Miller indicated that he had performed the inspection, but no records of such inspection exists; (5) the Contract required C & D to meet BP’s minimum safety standards; (6) BP had a safety representative offshore on the primary platform (although not on Miller’s platform); and (7) BP had a policy of not allowing more than 5,000 pounds on the fast line, and the x-ray building weighed approximately 6,500 pounds. Further, Plaintiff attaches his expert’s report, wherein Edward Ziegler concludes that BP is partially responsible for Plaintiffs injuries because by a “lack of coordination, supervision, planning, and failures in safety programming, the Defendants failed to perform at an acceptable level and to the standard of care in the industry.” Last, Plaintiff attaches an internal email among BP employees wherein George Tappin suggests that BP should reemphasize the importance of performing pre-lift inspections and communication between the lift team and the crane operator to prevent future injuries similar to Plaintiffs injuries.
At the outset, the Court observes that Zeigler’s report is unpersuasive because he fails to distinguish among Seacor, C & D, Miller, and the BP Defendants in his conclusion. Presumably, by referring to “Defendants,” Zeigler concluded that all of the Defendants-including BP-failed to adequately communicate, plan, and supervise the lifting of the x-ray building. Regardless, Zeigler’s substantive conclusion cuts against Plaintiffs arguments. Zeigler’s report says that the BP Defendants are liable because they failed to plan and supervise the project; however, Plaintiff now argues that the BP Defendants are liable for Miller’s actions because they exercised control over the details of his work sufficient to strip them of their independent contractor defense. Plaintiff cannot have it both ways. Likewise, the internal email does not support Plaintiffs contention concerning BP’s control over C & D since the email argues for more control, not less.
Second, the Court fails to see how Miller’s lack of compliance with two of BP’s *658 safety proeedures-alleged failure to turn in his pre-lift inspection report and failure to adhere to the policy of not lifting cargo over 5,000 pounds-evinces BP’s control over Miller. Plaintiff is apparently looking to BP’s standards and C & D’s failure to adhere to them as evidence that BP fell below the applicable standard of care. Again, Plaintiffs proffered evidence cuts against Plaintiffs assertion that BP exercised control over C & D and its employees-BP apparently did not exercise enough control since Miller did not follow BP’s guidelines. Thus, in the end, Plaintiff asks this Court to deny BP’s Motion based on daily safety meetings at the primary platform, a contract provision requiring C & D and its employees to conform to BP’s minimum safety standards, the presence of a BP safety representative at the primary platform, and the fact that Miller occasionally checked signals with the BP representative on particular jobs. After reviewing all of the evidence now before it, and after careful thought and considerable deliberation, the Court concludes, as it must, that Plaintiff has failed to raise a genuine issue of material fact that suggests BP or its employees retained or exercised any right of control substantial enough for BP to lose its independent contractor defense.
Initially, the Court must look to the relevant contractual provision between BP and C & D. In Louisiana, the determination of whether C & D should be treated as an independent contractor “depends in great measure upon whether and to what degree the right to control the work has been contractually reserved by the principal.”
Hemphill v. State Farm, Ins. Co.,
retained at least some degree of control over the manner in which the work is done. It is not enough that he has merely a general right to order the work stopped or resumed, to inspect its progress or to receive reports, to make suggestions or recommendations which need not necessarily be followed, or to prescribe alterations and deviations. Such a general right is usually reserved to employers, but it does not mean that the contractor is controlled as to his methods of work, or as to operative detail. There must be such a retention of right of supervision that the contractor is not entirely free to do the work in his own way.
See McCormack v. Noble Drilling Corp.,
The Court speculates that if BP had a representative or company man actually on the platform where Miller worked at or near the time that the accident took place, all of the aforementioned evidence taken together with the actual presence of a BP employee would present a very close question as to whether BP exercised operational control. However, since no BP employee was on the Vessel or the platform where Miller worked, it is hard for the Court to fathom that BP was directing Miller’s work and asserting operational control over the offloading that ultimately led to Plaintiffs injuries. Thus, for all of the aforementioned reasons, the Court GRANTS BP’s Motion and DISMISSES WITH PREJUDICE all of Plaintiffs claims against the BP Defendants only.
III. CONCLUSION
Before concluding, the Court compliments the Parties’ Counsel on their zealous advocacy and thanks them for their hard work and excellent lawyering. For all of the reasons set forth above, the Court hereby GRANTS Defendants’ Motion for Summary Judgment and DISMISSES WITH PREJUDICE all of Plaintiffs claims against the BP Defendants only. Each Party is to bear its own taxable costs and expenses incurred herein to date, regarding any matter treated in this Order.
IT IS SO ORDERED.
Notes
. The Parties failed to specify whether the platform at issue is affixed to the Outer Continental Shelf's seabed; however, BP did cite 43 U.S.C. § 1333(a)(2)(A) as the basis for applying Louisiana law to the instant matter, which Plaintiff did not refute. If Plaintiff believes that the Court erred in its determination of what law applies, then Plaintiff may move for reconsideration of the Court’s Order on the basis that other substantive law should be applied, and such application will materially alter the Court's analysis in this Order.