Opinion
These certified appeals arise out of an action brought by the plaintiffs,
1
the owners of a certain property located in the town of Southington, against the defendant, the city of Bristol, challenging the statement of compensation filed by the defendant in connection with its taking by condemnation of certain interests in the plaintiffs’ property. Before they brought this action, the plaintiffs had brought an action against the defendant in the United Stated District Court for the District of Connecticut (federal court) raising numerous statutory claims, common-law claims and a claim of inverse condemnation, all pertaining to the defendant’s maintenance of a landfill abutting their property which, the plaintiffs alleged, had contaminated the groundwater under their property. The federal court found for the plaintiffs on most of their statutory and common-law claims but denied the plaintiffs’ inverse condemnation claim. Subsequently, the trial court in the present case rejected the plaintiffs’ claim that the valuation of the property interests taken by the defendant should be measured by comparing the value of the land in its uncontaminated state to the value of the land in its contaminated state on the ground that the federal court previously had decided that issue in favor of the defen
*429
dant. The plaintiffs appealed to the Appellate Court, which concluded that although the plaintiffs had a right, in principle, to be compensated in this condemnation proceeding for the pretaking contamination of their property, the trial court properly had concluded that, under the circumstances of this case, the plaintiffs were barred by principles of collateral estoppel from making such a claim.
Albahary
v.
Bristol,
The opinion of the Appellate Court sets forth the following facts and procedural history. “The plaintiffs are joint owners of 87.6 acres of unimproved property in Southington. The property, which is almost entirely in a residential zone, is taxed as open space land. Its northerly part, which abuts [a landfill operated by the defendant], consists of approximately forty-six acres that, since 1992, have been used for the mining of good quality sand and gravel. Its southerly part, approximately forty-two acres, consists of unimproved land.
*430 “The defendant’s abutting landfill was operational from 1946 to 1997, when it was closed down by the state department of environmental protection (department) because of contaminating leachate generated at the site. The leachate polluted the groundwater on the plaintiffs’ property so that it is not potable.
“On October 24, 1995, the department and the defendant entered into a consent order in which the defendant conceded that ‘[t]he operation of a solid waste disposal area at the [landfill resulted] in a discharge of water, substance or materials, including but not limited to leachate, into the waters of the State.’ The consent order required the defendant to undertake certain investigations and studies with regard to the landfill and to propose plans in order to remediate the leachate contamination that the landfill had caused. The consent order did not require the defendant to clean up the contamination. Instead, it gave the defendant the option to acquire control over all of the polluted groundwater rights or interests therein that were located within a certain ‘zone of influence’ that included the property of the plaintiffs.
“In 1996, the legislature enacted No. 96-12 of the 1996 Special Acts, to permit the defendant to acquire or to condemn property outside of its borders. This special act was intended to enable the defendant to comply with the consent order.
“On July 30, 1997, relying on the special act, the defendant began condemnation proceedings to take an easement over twenty-five acres of the plaintiffs’ property. For a thirty-one year period, the easement permits the defendant to access the property to withdraw groundwater, to collect environmental data and to pump and treat groundwater so as to remediate the *431 existing contamination. 2 The defendant filed a certificate of taking with the clerk of the Superior Court and recorded the certificate in the Southington land records on September 17, 1997. In accordance with a statement of compensation, the defendant made a deposit of $50,000.
“On January 26, 1998, the plaintiffs filed an appeal in the trial court to challenge the adequacy of the proffered compensation award. They made two claims. Their first claim was that, as a matter of law, their damages should be measured by a valuation formula compensating them for the pollution of their groundwater both before and after the taking of their property rights through eminent domain. Their second claim was that, as a matter of fact, the valuation of their property should take into account possible future uses of their property for purposes other than its present use for mining. The defendant disputed both of these claims.
“The trial court rendered a judgment deciding the plaintiffs’ claim of law in favor of the defendant.
3
It agreed with the defendant that the damages suffered by the plaintiffs as a result of the condemnation of their property were to be measured by comparing the value of their property at the time of the taking, in its polluted condition, with its value after the condemnation. It also agreed with the defendant that monetary compensation awarded to the plaintiffs for the easement that the
*432
defendant has taken should be based on the likelihood that the plaintiffs would continue to use their property for mining.”
Albahary
v.
Bristol,
supra,
“Before the present state court condemnation proceedings had begun, the plaintiffs filed an action against the defendant in [federal court]. They sought damages and injunctive relief for the injury that they had suffered as a result of the landfill’s contamination of the groundwater on their property prior to the condemnation.
“The federal case was decided after the filing of the complaint in this present condemnation case. The federal court held that the plaintiffs had proven most of their statutory and common-law claims, but not their claim of inverse condemnation. 4 With respect to that claim, the court found that the plaintiffs’ receipt of $2.65 million from their mineral extraction contracts demonstrated that the contamination caused by the defendant had not deprived the plaintiffs of the reasonable use of their property. The court denied the plaintiffs any damages even for the claims that they had proven because ‘the legal remedy of money damages to compensate the current landowners for diminished value of their property is inadequate and highly speculative . . . .’ Instead, the court ordered the defendant to provide the plaintiffs with an alternate potable water *433 source and to indemnify the plaintiffs against claims of environmental liability that might be raised by third persons. No appeal was taken from this judgment.” Id., 337-38.
In the present case, the trial court determined that the damages suffered by the plaintiffs from the condemnation of their property were to be measured by comparing the value of their property at the time of the taking, in its polluted condition, with its value after the condemnation. The trial court stated, in support of its conclusion, that “[t]he record before this court demonstrates that the plaintiffs [in their federal court action] have sought and obtained damages for the [past] contamination to their property caused by the city’s landfill. They are therefore barred from litigating the same issues in this proceeding.”
The plaintiffs appealed to the Appellate Court claiming, inter alia, that the trial court “improperly [had] confined its analysis of the damages they had suffered to a comparison between the value of their property in its polluted condition and its value after the taking of the easement.”
Albahary
v.
Bristol,
supra,
Because our resolution of the issue raised in the defendant’s appeal guides our resolution of the plaintiffs’ appeal, we first address that issue.
5
The defendant claims that the Appellate Court improperly concluded that, in determining the amount of the plaintiffs’ just compensation, the plaintiffs had a right, in principle, to be compensated for the totality of the damage caused to their property by the defendant’s contamination of the plaintiffs’ groundwater. In support of this claim, the defendant cites our decision in
ATC
and a number of other cases for the proposition that personal liability for damages incurred before the taking cannot be liti
*435
gated in a condemnation proceeding, but must be litigated in an independent suit for damages.
6
The plaintiffs counter that
ATC
is inapplicable here because it did not involve damages caused by the condemnor. They further argue that, because the defendant, by depositing contaminants on their property, physically took possession of it before filing its notice of condemnation, the property should be valued as of the date that the defendant took possession. See
Slavitt
v.
Ives,
At the outset, we set forth the standard of review. Whether a claim for compensation for the pretaking contamination of a property by the condemning entity may be raised in an eminent domain proceeding is a question of law over which our review is plenary. See
Kelly
v.
New Haven,
In order to address the substance of the defendant’s claim on appeal, it is necessary first to clarify the nature of the plaintiffs’ underlying claim. The defendant’s principal argument is premised on its characterization of the plaintiffs’ claim for damages for the pretaking contamination of their property as an action for in personam liability. The plaintiffs argue in their brief on their appeal that their claim is an action for just compensation for the taking of their property under well settled eminent domain principles. In their brief on the defendant’s appeal, however, the plaintiffs argue that they are entitled to compensation based on the value of the property in its uncontaminated condition because “the taking occurred when the defendant began its physical occupation of the easement area” and “the defendant physically took possession of the ‘property’ it later condemned by depositing chemical contaminants in the easement area before filing its notice of condemnation.” Accordingly, we conclude that, as the Appellate Court
*437
suggested, the plaintiffs’ claim implicates principles of inverse condemnation.
9
See
Albahary
v.
Bristol,
supra,
Although this court previously has not had occasion to consider the specific issue in this case—whether
prelaking
property damages caused by a condemnor are recoverable in a condemnation proceeding—we have considered a related issue. In
Plunske
v.
Wood,
Thus, in
Plunske,
this court concluded that a plaintiff can receive just compensation in a condemnation proceeding for damage to land that has not been formally taken if the damage is the necessary, natural and proximate result of a taking for a public use. Id., 284-85. In other words, we effectively concluded that, if damage to the untaken land is the necessary, natural and proximate result of a public use, then the land, or at least certain interests in it, have been taken by inverse condemnation and the plaintiff is therefore entitled to just compensation.
10
If the damages are caused by the con
*439
demnor’s negligence, however, then the plaintiff is relegated to an action sounding in tort. Accordingly, we
*440
agree with the Appellate Court that, if the damage to the plaintiffs’ property was the necessary, natural and proximate result of a public use, and the claim for compensation was not otherwise barred, the trial court could consider the pretaking contamination in determining the amount of the compensation award. See
Albahary
v.
Bristol,
supra,
*441
The defendant argues, however, that “the legal principles [precluding the litigation of personal liability issues in condemnation proceedings] that drove the outcome of
ATC
apply with equal force in inverse condemnation actions.” In support of this argument, the defendant relies on
Shealy
v.
Athens-Clarke,
We do not agree with the court in
Shealy
that an inverse condemnation claim relating to a formally taken property cannot be raised in an ongoing condemnation proceeding. Requiring separate proceedings would be both unnecessarily duplicative and inconsistent with our case law. See
Plunske
v.
Wood,
supra,
The defendant also argues that allowing the plaintiffs to recover property damages in a condemnation proceeding would expand improperly the scope of the proceeding as defined by General Statutes § 8-132.
11
In support of this argument, the defendant cites our statement in
Research Associates, Inc.
v.
New Haven Rede
*443
velopment Agency,
Implicitly recognizing this exception to § 8-129, the defendant in the present case next argues that the plaintiffs are barred from claiming a different date of taking before this court, thereby implicitly raising a claim of inverse condemnation, because they never made such a claim before the trial court.
14
We agree that the plaintiffs are barred from bringing this claim, but for a different reason. Specifically, we conclude that the Appellate
*444
Court properly determined that the claim for diminution in property value in the present case, which implicates principles of inverse condemnation, was barred by principles of collateral estoppel because the federal court concluded that the contamination of the plaintiffs’ property was a result of the defendant’s negligence and granted relief designed to restore the plaintiffs to the position that they would have been in had the contamination never occurred. See
Albahary
v. Bristol, supra,
“[C]ollaterai estoppel, or issue preclusion, is that aspect of res judicata that prohibits the relitigation of an issue when that issue was actually litigated and necessarily determined in a prior action between the same parties or those in privity with them upon a different claim. ... An issue is
actually litigated
if it is properly raised in the pleadings or otherwise, submitted for determination, and in fact determined.” (Citations omitted; emphasis in original; internal quotation marks omitted.)
Efthimiou
v.
Smith,
In the federal case, the court concluded that the “plaintiffs have proven that the [defendant] was negligent in its operation of the [l]andfill and that its negligence caused [the] plaintiffs’ property damage.” The court also determined that “the legal remedy of money damages to compensate [the plaintiffs] for [the] diminished value of their property [was] inadequate and highly speculative,” and that the plaintiffs’ injury was “ ‘otherwise irremediable.’ ” Accordingly, “in order to put [the] plaintiffs in the same position they would have been in had the leachate contamination emanating from the [l]andfill not been permitted to pollute the ground *445 water beneath the . . . [pjroperty and render it unusable,” the court ordered injunctive relief, including an order that the defendant provide the plaintiffs with a potable water source for the property and file on the land record documentation that the defendant will indemnify, hold harmless and defend the plaintiffs and subsequent owners against any claims of environmental liability. The court stated that “[t]his injunctive relief . . . restores to the affected property that which it lost, removes, in part, the stigma of known contamination as it affects financing and willingness of lending institutions to finance a sale of the property, and protects future landowners from strict liability for leachate plume migration, for which they bear no responsibility.” Finally, the court held that “no monetary damages for [the] defendant’s negligent operation of the [l]andfill . . . are warranted.”
In the present case, the plaintiffs again seek to recover monetary damages for the diminution in their property value as a result of contamination from the defendant’s operation of the landfill. As we have indicated, in order to bring this claim within the context of a condemnation proceeding, the plaintiffs must establish that the damage to their property was the necessary, natural and proximate result of the operation of the landfill, and not the result of the defendant’s negligence.
Plunske
v.
Wood,
supra,
*447 The plaintiffs claim, however, that the federal court did not hold that the plaintiffs were not entitled to monetary compensation for the diminution in the value of their property. In support of this claim, they point out that the court explicitly stated in its memorandum of decision that “the injunctive remedy ordered is in addition to the monies ordered to be paid in the state law condemnation action, which are intended to pay for the acquisition of rights to the groundwater beneath [the] plaintiffs’ property. It is the intention of the [c]ourt that those funds not be used to offset the costs of providing water to the . . . [property. The form of injunctive relief ordered permits the state court condemnation and challenge to proceed without interference, direct or indirect, by the federal court, thus satisfying this [c]ourt’s comity concerns.” (Emphasis in original.) The court concluded that “no monetary damages for [the] defendant’s negligent operation of the [l]andfill, beyond the injunctive relief ordered and the compensation for the groundwater taking, are warranted.” (Emphasis added.)
We are not persuaded by the plaintiffs’ claim. First, the certificate of taking filed by the defendant affected property interests not at issue in the federal case. It allowed the defendant, for the duration of thirty-one years, to enter onto the plaintiffs’ property for the purpose of withdrawing groundwater, to transport machinery and materials over the plaintiffs’ land for the purpose of monitoring and treating the groundwater, to pump and treat groundwater, and to perform related activities. We interpret the federal court’s statements to mean that, because the value of the plaintiffs’ property as a result of the taking of these interests was not at issue in the federal case, its decision should not affect the state action. Second, the federal court did not conclude that the plaintiffs were not entitled to monetary damages for diminution in property value *448 because they would receive such compensation in the present case. Rather, it declined to award such damages because it believed that they would be “inadequate and highly speculative, in light of many variables such as likelihood of zoning changes for [the] plaintiffs’ property, permissible forms of access through its protected wetlands, availability of remaining sand and gravel resources on site, and real estate market interest” and because the court could restore the plaintiffs to the position that they would have been in if the contamination had not occurred by granting injunctive relief.
The plaintiffs also argue that the issue litigated in the federal court was not the same as the issue raised in the present case because the inverse condemnation claim in the federal court case involved the value of the property as a whole, while the present action involves the value of limited interests in the property. 17 We have not concluded, however, that the claim in the present case is duplicative of the inverse condemnation claim in the federal case. Rather, we have concluded that it is duplicative of the negligence claim in that case. 18
*449 Finally, the plaintiffs argue that the Appellate Court, in determining that they were not entitled to recover the diminution in their property value, improperly ignored the fact that the defendant’s easement allows it to continue contaminating the property. Specifically, they argue that, because the easement deprived them of their right under General Statutes § 22a-452 19 to remediate the property at the defendant’s expense, and because the easement allows the defendant to continue the contamination, “clean groundwater will be legally unavailable to the plaintiffs for [thirty-one] years more than it would have been if the easement had not been taken; and, consequently . . . the value of the easement must be measured by comparing clean land to polluted land.” (Emphasis in original.)
We are not persuaded. In support of their claim, the plaintiffs argue that “whatever ‘damages’ the plaintiffs *450 might have recovered for the pollution existing prior to the date of the taking would not have prevented them, after the date of the taking, from cleaning up the groundwater at [the] defendant’s expense . . . .” (Emphasis in original.) Thus, the plaintiffs implicitly argue that the relief ordered by the federal court was intended to compensate them only for the pretaking contamination. 20 As we have indicated, however, the federal court granted a permanent injunction designed to “put [the] plaintiffs in the same position they would have been in had the leachate contamination emanating from the [l]andfill not been permitted to pollute the groundwater beneath the . . . [property . . . .” Regardless of when the contamination occurred, the harm that it caused was depriving the plaintiffs of a source of potable water on the property and exposing them to environmental claims by third parties. The relief ordered by the federal court fully compensated the plaintiffs for these injuries.
This becomes clear if we hypothesize a situation in which the pretaking contamination was caused by a third party and was of a more ephemeral nature, such as the discharge of pollutants into a stream running through the plaintiffs’ property. If a court entered a permanent injunction requiring the third party to provide a source of potable water and to indemnify the plaintiffs from environmental claims in order to place the plaintiffs in the same position that they would have been in if the stream had never been polluted, the plaintiffs would not be entitled to additional compensation from a successor polluter on the ground that the stream would have been clean in the absence of the continuing pollution. Rather, the third party would be entitled to *451 claim that the permanent injunction against it should be lifted because the successor polluter should now be held responsible for the pollution.
This court’s decisions in
Avery
v.
White,
The judgment of the Appellate Court is affirmed.
In this opinion the other justices concurred.
Notes
The plaintiffs are Mary L. Albahary, Patricia N. Gilbertson, J. Harwood Norton, Jr., Nancy S. Norton, Janet N. Sonstroem, Dawn B. Norton, NortonLazenby, LLC, and Irving H. Norton.
The consent order provided that “[e]ach instrument establishing any right of possession to the zone of influence shall, at a minimum, provide . . . the right to discharge pollutants to the ground water within the zone . . . .’’In accordance with that directive, the easement also allowed the defendant to “release and deposit contaminants and pollution directly or indirectly, into, on or in the groundwaters and subsurface soils and formations within the Zone of Influence Easement Area.”
Although the trial court, adopted the defendant’s valuation formula, it determined that the defendant had undervalued the plaintiffs’ damages and increased the compensation award. See
Albahary
v.
Bristol,
supra,
“The federal court decided that the plaintiffs had proven all but three of the claims contained in their ten count complaint. It held that the defendant had violated two federal environmental statutes, the Resource Conservation' Recovery Act, 42 U.S.C. § 6901 et seq. and the Clean Water Act, 33 U.S.C. § 1251 et seq. It also held that the contamination of the plaintiffs’ property was both a public and private nuisance, a trespass, an act of negligence and a violation of General Statutes §§ 22a-427 and 22a-16. It held, however, that the plaintiffs had not proven their claim of inverse condemnation and strict liability. Also, because the plaintiffs had not undertaken any remediation of their property, it dismissed their claims for remediation and containment costs under General Statutes § 22a-452.”
Albahary
v. Bristol, supra,
Although the parties have not raised the issue in their briefs to this court, there is some question as to whether the defendant was aggrieved by the Appellate Court’s decision and, therefore, has standing to raise this claim on appeal. See
Jolly, Inc.
v.
Zoning Board of Appeals,
See
Northeast Ct. Economic Alliance, Inc.
v.
ATC Partnership,
supra,
This court concluded in
Slavitt
that the date of the taking of the plaintiffs property was the date that the defendant took possession of an ac[jaeent property that was subject to a right-of-way to the plaintiffs property and was the plaintiffs sole means of access to his property, rather than the date that the defendant condemned the plaintiffs property de jure.
Slavitt
v.
Ives,
supra,
“The usual rule is that if the United States has entered into possession of the property prior to the acquisition of title, it is the former event which constitutes the act of taking. It is that event which gives rise to the claim for compensation and fixes the date as of which the land is to be valued
*436
and the Government’s obligation to pay interest accrues. ” (Internal quotation marks omitted.)
Carl Roessler, Inc.
v.
Ives,
supra,
“Inverse condemnation is a cause of action against a governmental defendant to recover the value of property which has been taken in fact by the governmental defendant, even though no formal exercise of the power of eminent domain has been attempted by the taking agency.” (Internal quotation marks omitted.)
Cumberland Farms, Inc.
v.
Groton,
The primary difference between Plunske and the present case is that, in Plunske, the untaken land was damaged because of operations on the portion of the plaintiffs land that formally had been taken for a public use, while, in the present case, no portion of the plaintiffs’ land had been taken prior to the damage. It could be argued that the issue that we addressed in Plunske was how to determine the scope of a formal taking, rather than how to determine whether land was taken by inverse condemnation, and that Plunske is inapplicable when the scope of a formal taking is not at issue. We can perceive no reason, however, to read Plunske so narrowly. If the scope of a formal taking is subsequently expanded by the operations *439 of the condemnor, it only can be by way of inverse condemnation. Accordingly, the standard applied to determine whether the scope has been expanded is equally applicable to claims of inverse condemnation when there has been no prior taking.
Numerous courts have confronted the problem of how to characterize a claim for damage to property caused by a government entity when there has been no formal taking of the damaged property. They generally have agreed that such actions fall into two categories: actions for inverse condemnation and common-law actions for damages. See
Columbia Basin Orchard
v.
United States,
132 F. Sup. 707, 708-709 (Ct. Cl. 1955) (whether contamination of spring waters and subsequent damage to plaintiffs orchard as result of government’s actions was taking or tort);
Robinson
v.
Ashdown,
The courts have adopted a wide variety of standards, however, for determining into which category a particular claim should fall. Several New
*440
York courts have held that
“defacto
appropriation, in the context of physical invasion, is based on showing that the government has intruded onto the citizen’s property and interfered with the owner’s property rights to such a degree that the conduct amounts to a constitutional taking requiring the government to purchase the property from the owner; only at that point does title actually transfer. [T]he taking occurs when interference with the owner’s use has occurred to such an extent that an easement by prescription will rise by lapse of time .... In effect,
de facto
appropriation may be characterized as an aggravated form of trespass. . . . The basic distinction lies in the egregiousness of the trespass and whether it is of such intensity as to amount to a taking.” (Citation omitted; emphasis in original; internal quotation marks omitted.)
O’Brien
v.
Syracuse,
supra,
Other courts have held that “[a] tort action may lie in the proper forum for . . . an incidental or consequential injury, but not a suit for just compensation. There must have been an intent on the part of the defendant to take [the] plaintiffs property or an intention to do an act the natural consequence of which was to take its property.”
Columbia Basin Orchard
v.
United States,
supra, 132 F. Sup. 709; see also
Robinson
v.
Ashdown,
supra,
General Statutes § 8-132 (a) provides: “Any person claiming to be aggrieved by the statement of compensation filed by the redevelopment agency may, at any time within six months after the same has been filed, apply to the superior court for the judicial district in which such property is situated for a review of such statement of compensation so far as the same affects such applicant. The court, after causing notice of the pendency of such application to be given to the redevelopment agency, may appoint a judge trial referee to make a review of the statement of compensation.”
General Statutes § 8-129 provides in relevant part: “The redevelopment agency shall determine the compensation to be paid to the persons entitled thereto for such real property and shall file a statement of compensation, containing a description of the property to be taken and the names of all persons having a record interest therein and setting forth the amount of such compensation, and a deposit as provided in section 8-130, with the clerk of the superior court for the judicial district in which the property affected is located. . .
We note that §§ 8-129 and 8-132 apply to takings by a redevelopment agency. The defendant has provided no authority for the proposition that they are applicable in the present case. Cf.
Stocker
v.
Waterbury,
The defendant also claims that it did not take the plaintiffs’ property before it filed the statement of compensation because it did not physically possess the property to the plaintiffs’ exclusion prior to that date. We have concluded, however, that damage to property may constitute an inverse condemnation if the damage is the necessary, natural and proximate result of a public use.
Cf.
Electro-Jet Tool & Mfg. Co.
v.
Albuquerque,
The plaintiffs argue that “all of the factors that would enter into the determination of value became fixed as of [September 17, 1997, the date of the taking].” Because the federal court had not yet issued injunctive relief as of that date, they argue, “the proper valuation of the interests taken by [the defendant] could not be affected by that relief.” The point, however, is not that the value of the property was affected by the federal court’s order—although, of course, it almost certainly was. The point is that the plaintiffs cannot recover damages under both a negligence claim and an inverse condemnation claim arising from the same conduct.
We are not entirely convinced that this is an accurate characterization of the federal court’s decision. The federal court recognized that, under the federal constitution, “property rights are severable, that is, an unconstitutional taking may occur where one property right in the . . . bundle of property rights is infringed.’’ It concluded that the “plaintiffs have not proved that they have been deprived of the reasonable use of their land where the evidence shows that drinking water could be brought to the property . . . .” Read together, these statements reasonably may be interpreted as meaning that the plaintiffs had not proved that their interest in uncontaminated water had been taken.
We recognize that the Appellate Court concluded that “the plaintiffs are precluded from relitigating the federal court’s denial of their
inverse condemnation
claim.” (Emphasis added.)
Albahary
v.
Bristol,
supra,
General Statutes § 22a-452 (a) provides: “Any person, firm, corporation or municipality which contains or removes or otherwise mitigates the effects of oil or petroleum or chemical liquids or solid, liquid or gaseous products or hazardous wastes resulting from any discharge, spillage, uncontrolled loss, seepage or filtration of such substance or material or waste shall be entitled to reimbursement from any person, firm or corporation for the reasonable costs expended for such containment, removal, or mitigation, if such oil or petroleum or chemical liquids or solid, liquid or gaseous products or hazardous wastes pollution or contamination or other emergency resulted from the negligence or other actions of such person, firm or corporation. When such pollution or contamination or emergency results from the joint negligence or other actions of two or more persons, firms or corporations, each shall be liable to the others for a pro rata share of the costs of containing, and removing or otherwise mitigating the effects of the same and for all damage caused thereby.”
This argument appears to be inconsistent with the plaintiffs’ argument in the defendant’s appeal that they are entitled in this proceeding to compensation for the pretaking contamination of the property because the defendant took the property by inverse condemnation.