Aftеr examining the briefs and appellate record, this panel has determined unanimously that oral argument would not materially assist the determination of this appeal. See Fed.R.App.P. 34(a); 10th Cir.R. 34.1.9. The case is therefore ordered submitted without oral argument.
Appellants, various environmental grouрs interested in preventing the construction of Two Forks Dam outside of Denver and hereafter referred to as the Caucus, appeal thе district court’s denial of their motion under Fed.R.Civ.P. 24(a)(2) to intervene as of right in a suit brought by various Denver metropolitan water providers (plaintiffs) against the Environmental Protection Agency and the United States Army Corps of Engineers.
Before we address the merits of this case, we must first articulate the proper standard of review. Plaintiffs urge us to apply an abuse of discretion standard, while the Caucus argues for de novo review. It is settled that rulings on permissive intervention under Rule 24(b) are reviewed for abuse of discretion, see Allen Calculators, Inc. v.
As we turn to the merits of this case, it is first necessary to understand the factual background. In an effort to secure the construction of Two Forks Dam, a large water facility contemplated for the foothills southwest of Denver, the city applied to the United States Army Corps of Engineers for a permit to discharge dredged and fill materials into the waters of the United States. The Corps issued the permit, concluding in the рrocess that the project was water dependent.
As part of the permit evaluation process and in contrast to the opinion of the Corps of Engineers, the EPA staff concluded that the project was not water dependent. See id. at 43. EPA’s final determination, however, does not discuss water dependency and concludes that because other large dams could be built that would have “less adverse impact on the aquatic еcosystem” the permit should be denied. Id. at 123. The defendants in this action will argue that the existence of these less damaging, albeit structural, alternatives justifies the EPA’s veto.
The Caucus argues that there are nonstructural alternatives to Two Forks which would adequately meet identified water needs. The Caucus contends that it must be allowed to intervene in this suit in order to give the district court the benefit of its views on the availability of such nonstructural аlternatives, “which alternatives the agencies failed to consider adequately.” Appellant’s Opening Br. at 21. The Caucus contends that it will arguе two issues in the district court: (1) that alternatives to Two Forks exist, and (2) that both the Corps and the EPA impermissibly failed to consider them. Id. at 31.
Intervention under Rule 24(a)(2) shоuld be granted when a timely motion to intervene demonstrates that (1) the intervenor has an interest in the property or transaction that is the subject matter of the action, (2) the interest might be impaired absent intervention, and (3) the existing parties will not adequately represent the interest. In re Kaiser Steel Corp.,
We can affirm the decision of the district court on any basis supported by the
A court may not uphold an agency action on grounds not relied on by the agency. National R.R. Passenger Corp. v. Boston & Me. Corp., — U.S. —, —,
The judgment of the United States District Court for the District of Colorado is affirmed.
Notes
. The Caucus had also petitioned for рermissive intervention under Fed.R.Civ.P. 24(b). It does not, however, appeal the district court’s denial of such permission. See Appellant’s Reply Br. at 16.
. This determination meant the Corps wаs not required to assume that there were practicable alternatives available to Two Forks Dam. See 40 C.F.R. § 230.10(a)(3).
. This case differs from New York Public Interest Research Grоup, Inc. v. Regents of the Univ.,